restrooms no smoking
ladies
gents
sweet gum brewin g co. starkville , ms
sweetgum brewing co.
Branding is certainly an important part of The Sweetgum Brewing Company. Therefore, merchandise is a thought that should be well considered for the company and the consumers.
• In areas of the building undergoing the change of occupancy classification, the interior finish of walls and ceilings shall comply with the requirements of the International Building Code for the new occupancy classification (1012.3 Interior finish)
15
10,2 40.7 2
.41 5 2
Win d o ws
6 942.9 , 4 4
446,000.00
Doors &
30,807.40
TOTAL COST
Fin i
es sh
11
38 ,8
45, 2 73 .8
1.74 ,70 88 h Mec
6 7 2 4 7.34 Electrica l
93 ,7
. on c l re
Th
MP
Conc rete
.51 8,365. 94 4,734
.33 40
Ge ne
rk SiteWo
Pla stic s
& al m er
4 0.8 2 ,0
Wood &
0
M
nry aso
Steel
Project Duration
111 Days Demolition
46 days Reconstruction
62 days
Project Start 10 Days
Site Work/Site Demolition 8 Days
Interior Demolition 14 Days
Exterior Demolition 14 Days
Interior Renovations 14 Days
Mechanical Rough Ins 7 Days
Electrical Rough Ins 4 Days Inspections 3 Days Interior Trim 11 Days
Exterior Renovations 23 Days