Daniel Ruff Portfolio - Fall 2016

Page 1

Daniel Ruff Hans Herrmann Studio 2A 2016


A1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Front and Back Wall Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach Studs in 24” intervals to plywood

Materials

4’ x 8’ Plywood (5), 8’ P.T. southern pine 2 x 4 (11) 8'

1' 10" 1' 10"

Start wall with plywood panels

8'

4'

A1.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Front and Back Wall Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, table saw

Place plywood in between the studs

Materials

8'

4’ x 8’ Plywood (5), 22” x 96” R 30 Insulation (11)

1' 10" 1' 10"

Place insulation in between studs

8'

1' 10" 1' 10"

A1.2

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Front and Back Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach claadding along wall with a 1” overlap 1"

Materials

6"

8’ 1” x 6” fir (72)

4' 10 1/8"

Attach first wall cladding on both sides of wall

8'

4' 10 1/8"

A1.3

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Front and Back Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw Materials

12’ 1” x 6” fir (38)

Attach second wall cladding the same way

10' 3 1/2"

A1.4

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


A2

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Door Wall Assembly

1' 10" 7 9/16"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach Studs in 24” intervals to plywood

Materials

4’ x 8’ Plywood (3), 8’ P.T. southern pine 2 x 4 (7)

2' 11 15/16" 1' 3/16"

Start wall with plywood panels

3' 1 1/2"

8’

A2.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Door Wall Assembly

1' 10"

3' 1 11/16" 7 9/16"

Place plywood in between the studs

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw Materials

4’ x 8’ Plywood (3), R 30 insulation (5)

1' 10"

3' 1 11/16" 7 9/16"

Place insulation in between studs

A2.2

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Door Wall Assembly

4'

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, table saw

Cut plywood out of 4’ 8’ panels (2)

8'

2' 11 7/8" 1' 1/4"

1' 3’”

Cut plywood out of 4’ 8’ panels (1)

3' 1 1/2"

8'

1' 1/4" 4"

A2.3

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Door Wall Assembly

1' 10"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, table saw

Cut plywood out of 4’ 8’ panels (1)

8'

7’ 9/16

7 9/16" 4'

1' 10"

1' 10"

Cut plywood out of 4’ 8’ panels (2)

8'

4'

A2.4

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Door Wall Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw Materials

8’ 1” x 6” fir (32)

6' 11 7/8"

Attach cladding on wall with 1” overlap on both sides of wall

A2.5

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Door WallAssembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach third cladding on both sides of wall

Materials

12’ 1” x 6” fir (3), 8’ 1” x 6” fir (4)

1' 1/4"

11' 1 5/16"

Attach second cladding on both sides of wall

A2.6

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


A3

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Window Wall Assembly

1' 10 1/16"

6 11/16"

1' 3 15/16"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Table Saw

Attach Studs in 24” intervals to plywood

Materials

4’ x 8’ Plywood (3), 8’ P.T. southern pine 2 x 4 (7)

5' 6 3/4" 5' 6 11/16"

Start wall with plywood panels 1' 2 1/2"

4' 8 1/16"

6' 9 1/16"

A3.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Window Wall Assembly

1' 10 1/16"

6 11/16"

1' 3 15/16"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Table Saw

Place plywood in between the studs

Materials

4’ x 8’ Plywood (3), 22” x 96”R 30 Insulation (6) 8'

1' 10 1/16"

6 11/16"

1' 3 15/16"

Place insulation in between the studs

8'

A3.2

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Window Wall Assembly

4"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Table Saw

Cut plywood out of 4’ x 8’ panels (1)

1' 2"

8'

8'

4' 2 1/8"

2'

4" 1' 3 15/16"

Cut plywood out of 4’ x 8’ panels (1) 1' 2 5/8"

1' 2 5/8"

8'

4' 2 1/8"

1' 10 1/16"

A3.4

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Window Wall Assembly 4"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Cut plywood out of 4’ x 8’ Panels (2)

8'

4' 7 15/16"

4"

Cut plywood out of 4’ x 8’ panels (2)

8'

6 11/16"6 15/16"

A3.5

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Window Wall Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach second cladding on wall

Materials

10 11/16"

12’ 1” x 6” fir (26), 8’ 1” x 6” fir (2) 6"

11' 1 5/16"

Attach first cladding on wall

8'

A3.6

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


A4

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Upper Front and Back Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach Studs in 24” intervals to plywood

Materials

4’ x 8’ Plywood (5), 8’ P.T. southern pine 2 x 4 (2) 2'

1' 2 3/4"

1' 10"

Start wall with plywood panels

4'

1' 2 3/4"

A4.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Upper Front and Back Wall Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Place plywood in between studs

Materials

4’ x 8’ Plywood (2), 22” x 96” R 30 insulation (3) 1' 10"

1' 2 3/4"

Place insulation in between studs

1' 10"

1' 2 3/4"

A4.2

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Upper Front and Back Wall Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Table Saw

Cut plywood out of 4’ x 8’ panels (2)

4'

8'

1' 2 3/4"

A4.3

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Front and Back Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach middle clladding to wall

Materials

8’ 1” x 6” fir (12), 12’ 1” x 6” fir (6) 10' 3 1/2"

Attach outer cladding to wall

4' 10 1/8"

1' 2 3/4"

A4.4

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


A5

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Upper Window and Door Wall Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach Studs in 24” intervals to plywood

Materials

4’ x 8’ Plywood (4), 8’ P.T. southern pine 2 x 4 (2) 9 1/2" 1' 10 3/16"

1' 2 5/8"

Start wall with plywood panels

5' 6 5/8"

1' 2 5/8"

A5.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Upper Window and Door Wall Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Place plywood in between studs

Materials

4’ x 8’ Plywood (2), 22” x 96” R 30 Insulation (2) 9 1/2" 1' 10 3/16"

1' 2 5/8"

Place insulation in between studs

9 1/2"

1' 10 3/16"

1' 2 5/8"

A5.2

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Window Wall Assembly

1' 2 5/8"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Table Saw

1' 2 5/8"

Cut plywood out of 4’ x 8’ panels (1) 5' 6 5/8"

8’

4'

1' 10 3/16"

Cut plywood out of 4’ x 8’ panels (1)

8’

1' 2 5/8"

9 1/2" 4'

A5.3

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Upper Window and Door Wall Assembly

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw Materials

12’ 1” x 6” fir (12)

Attach cladding to wall

11' 1 1/4"

A5.4

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Slab and Columns

Tools Measuring Tape, Pencil, Speed Square, Chop Saw

Columns cast in concrete 6” deep (6)

Materials

Concrete, 12’ 6 x 6 southern pine (6)

11' 2 3/8"

8' 4”

9' 2 1/4"

8’ 4”

1’ 1 1/8”

Concrete Slab

3'

20'

12'

B1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Beams

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw Materials

12’ 6” x 6” southern pine (4)

22'

Attach beams

2’ 2"

2' 2"

B1.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Wall Footing 4"

Tools Measuring Tape, Pencil, Socket Wrench, Speed Square, Chop Saw

Attach wall footings with j botls at 24” intervals

Materials

1/2” x 8” J Botls (20), 1/2” Washer (20), 1/2” Nut (20) 12’ 2 x 6 P.T. southern pine (4)

B2

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Wall Footing

Tools Measuring Tape, Pencil, Socket Wrench, Speed Square, Chop Saw Materials

1/2” J Bolts (10), 1/2” Washer (10), 1/2” Nut (10) 12’ 2 x 6 P.T. southern pine (2)

Attach side walls footings the same way

10' 7 3/4"

2' 6"

B2.1

DanielRuff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Wall Attachment

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square

Attach front and back walls

Attach side walls

A6

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Wall Connection

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Socket Wrench

Connect front and side walls 4"

Materials

1/2” J Bolts (20), 1/2” Washer (20),, 1/2” Nut (20) 12’ 2 x 6 P.T. southern pine (2), 5” Steel Bracket (4) , 1’ Marriagge Bracket (4)

2"

Attach side walls

A6.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Beds and Changing Room

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Socket Wrench

Assemble changing room

2' 3 1/2” 3'

3'

7'

Materials

4’ x 8’ Plywood (3), 8’ P.T. southern pine 2” x 4” (6)

Place beds in betwwen the columns

C

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Column Walls

9' 6" 3' 10 1/2"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Table Saw

4'

Materials

5' 11"

4’ x 8’ plywood (10)

5' 11"

17' 9"

5' 11"

Screw plywood into columns

3' 11 1/2”

3' 7 5/16"

17' 9 1/2"

9' 10”

D1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Column Walls 3' 10 1/2"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach cladding on other walls

Materials

4'

5' 11"

8’ 1” x 6” fir (33), 12’ 1” x 6” (16)

5' 11" 17' 9" 5' 11"

Attach cladding along plywood

3' 7" 9' 10"

D1.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Door Frame

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach top of door frame 3' 1 3/16"

7 1/2"

Materials

8’ 1” x 6” fir (3)

Attach side of door frame

6' 7 1/2"

A7

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Window Sill

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw Materials

12’ 1” x 8” fir (1)

Attach window sill

9’ 4"

10 9/16"

A8

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Window Frame 7 1/2"

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach side of window frame

2' 6"

Materials

12’ 1” x 6” fir (1), 8’ 1” x 6” fir (2)

Attach top of window frame

9' 4"

A8.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Upper Wall and Rain Panel Attachment

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach second rain panel and upperwall

Materials

2’ Steel panel (4) 10' 2”

Attach first rain panel and upperwall

18' 11"

1”

1' 3 3/16"

A9

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Wall Cap Attachment

Tools Measuring Tape, Pencil, Screwdriver, Screws, Speed Square, Chop Saw

Attach cap on side walls

11' 2"

Materials

12’ 1” x 6” fir (6)

Attach cap on front and back wall

4' 11”

10' 3 1/2"

4' 11"

9' 3”

A9.1

Daniel Ruff Cabin Fabrication Manual Hans Herrmann 21 Nov 2016


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.