Zhaoyu You Portfolio 2021 FALL

Page 1

ARC 3306 Studio I

Architectural portfolio


ARC3308 Studio III

table of contents

introduction Résumé

Architectural Architectural Studio II Sustainable Systems 1 Detailing &Construction Doc

Other Works 3 13 23

Paintings

45


Zhaoyu You ABOUT ME

Having academic background in Marketing, I am capable of analyzing the market, effectively communicating with the collagues and clients, working collectively with teammates, evaluating the effectiveness of visual communication and researching cases thoroughly. My marketing degree will be the aid for my architectural expertise since architects need to create spaces based on the requirements from the clients. By combining my marketing knowledges with my architectural skills, I can build stonger stories for my designs.

EDUCATION

Boston Architectural College August 2019 to present Candidate for Master of Architecture Candidate for NCARB IPAL Program

Wenzhou-Kean University August 2015 to June 2019 Bachelor of Science Major in International Marketing

EXPERIENCE

Phi Architect - Intern Architect March 2020 to October 2020 Converted SketchUp site model into Rhino site model and prepared site drawings at different scales. Assisted the supervisor with the schematic design and master plan generation. Used InDesign to document the result from analysis. Participated discussions and meetings online using Zoom. ZeroHouseDesigns - Volunteer December 2019 to April 2020 Prepared site drawings for the zoning and conceptual design for the supervisor. Built the site model in Revit for designing. Visualized supervisor’s design in Revit and rendered in Rhino using V-ray. Hebei Jianyan Architectural Design Co. - Intern July 2019 to August 2019 Participated in schematic design of residential and educational buildings. Prepared the PowerPoint for the presentation to the clients on touristic project. Cooperated with the outsourced rendering company for the project report to the client. Michael Graves College of WKU - Student Assistant September 2016 to June 2019 Led a team of 8 as the director of files classification, preparation and translation. Used Photoshop and Illustrator to design posters for the college. Worked with the IT department on the editing of propaganda video. Communicated with design professionals on the content of their lecture and details of their trip to our college. 1


SKILLS 3D Model & Render Rhino V-ray for Rhino Revit Enscape SketchUp AutoCAD Arkio

Graphic Design Adobe Photoshop CC Adobe Illustrator CC Adobe InDesign CC Adobe Lightroom

Grasshopper Elk (GIS data) Bison (Land Analysis) Ladybug (Climate) Honeybee (Energy) Sunflower (Solar)

Video Editing Adobe Premiere CC iMovie

Office Work Microsoft Office IBM SPSS

Modeling 3D Printing Military Models

Culture & Art Painting Art History Egyptian History Fengshui

Science Engineering Biology Linguistic

Sports Baseball Mountain Biking Hiking Snowboarding

INTERESTS Architectural Museum Hotel Multi-family Residential Ancient Architecture

HONORS Nomination BAC Segment I Portfolio Award for 2020

Awarded Paper WKU Student Research Day for 2019

3rd Place WKU Wall Painting Competition for 2015

DesignViz of BSA Member of DesignViz 2020-2021

WKU College of Architectural and Design Student Assistant 2016-2017

WKU Student Government Member of Program Department 2016-2017

Member of VR Chort 2021

Director of Student Assistants 2017-2019

Vice President, President of Program 2017-2018

LEADERSHIPS

2


“on the slope” Mission Hill cider brewery ARC3307 Architecture Studio II Instructor: Chala Hadimi Date: 1st, Jun 2020 - 25th, Jul 2020 Individual work

3


Concept Model #4 This conceptual model was based on the history of the evolution of the road network near the mission hill. 4


Tectonic Model #1 This model, as the first tectonic model develpoed for the project, established the basic language of penetrating and intersecting between Vertical and Horizontal.

Tectonic Model #5 As one of the descendant of tectonic model #1, this model considered the angle between the building and the street, in order to adapt to the sunshine was required by the orchard and the view from the 2nd floor.

Tectonic Model #7 This model is the further development of the tectonic model #5, with more consideration of the orchard. Even the angel was not brought into further development, the idea of penetrating mass was successful.

5


1

2

1. Tectonic Generation The diagrams illustrated the idea of intersecting tectonic with mass and architectural elements.

2. Explosion Diagram This diagram explained the relationship between different parts of this building. 6


Circulation Diagrams 7


1

1

2

3

1. Solor Diagrams These diagrams helped me to locate the orchard for apple trees. 2. Program Diagram 3. Orchard Placement 8


Site Plan 9


2nd Floor Plan

1st Floor Plan 10


Section A-A

Section B-B

Section C-C

11


12


“Solar veil” Sustainability + Resiliency TSM2001 Sustainable Systems Instructor: Rebecca Rahmlow Date: 24th, Aug 2020 - 23rd, Dec 2020 Individual work

13


1

New England Aquarium

2

Rose Kennedy Greenway

3

James Hook & Co

4

The Institute of Contemporary Art

5

South Station

6

Boston Tea Party Ships & Museum

7

Boston Convention and Exhibition Center

8

Boston Children's Museum

One of the most important fact of this site is the site is surrounded by several public buildings related to children. So, the site itself can be an extention to the current context, and keeps serving the children and parents in the community. To summarize, this project will be a mix-used project which includes commercial/community functions, the building will be majorly focused on enhancing the relationship between parents and thir kids.

14


Space Name

Occupants per Room

Area

QuantityT otal Occupants Total Area

Energy Consumption

1

28 Sqft

15

V15/E0

422 Sqft

37684.6 kBtu

Multi-Function Room

13

857 Sqft

5

V60/E5

4287 Sqft

469855.2 kBtu

Multi-Media Room

83

2437 Sqft

1

V80/E3

2437 Sqft

320465.5 kBtu

Lobby

15

2188 Sqft

1

V13/E2

2188 Sqft

239804.8 kBtu

baby accessories/children’s garments shop

24

2447 Sqft

1

V20/E4

2447 Sqft

239640 kBtu

233 Sqft

3

0

701 Sqft

62599.3 kBtu

15

1216 Sqft

1

V0/E15

1216 Sqft

141542.4 kBtu

51

5216 Sqft

1

V50/E1

5216 Sqft

584192 kBtu

Lactation room

Restroom

Indoor Playground

Total

V238/E30

f Roo

The Building will implement High Efficiency solar panels flat on roof, the energy yield per year per panel is 1356.556608 kBtu, the predicted EUI of my building is 644935.1 kBtu, the panels needed is 475.4≈476 panels, Toilets and Urinals: Sink: Breakroom: Sum:

19906 Sqft

2149784 kBtu

en Gard

ray

r PV A

ray

r PV A

53817.92 Gallons/yr 5434 Gallons/yr 3510 Gallons/yr 62761.92 Gallons/yr 15


Baby Accessories Store Conference Room

Circulation Core Classroom 3rd Floor: Half of the 3rd floor was sheltered by the roof. This design can provide extra space for resilient use.

2nd Floor: This floor provides 4 Multi-fuctional rooms as classrooms. The 2nd floor is directly accessible via ramp from ground level.

1st Floor: This floor provides a multifunctional space for this building. 16

Restroom Mother’s Room


The sun chart is very important for me to evaluate the strategy to deal with the sun on site and for my building. According to the sun chart from december 21 to June 21, the most of the days will need sun light to help heating the building. For the summer, about 1/3 of te days need shade, and the 2/3 of the days need sun to help with heating. So, the intergreted solar veil will adapt to the local condition, in order to optimize the heating and cooling performance with the sun, in the summer, the building need to create shade to the building, and in the winter, the solar veil will need to allow sunlight to heat the building.

After I decided to design a solar veil for the proposed building, I created a grasshopper script in order to generate a solar veil with adjustable angle and density for the future calculation. 17


The Ramp will provide direct access to the 2nd floor The Top follor have extra space as emergency shelter. under flooding situation.

Extra PV panels are placed on the roof, to provide extra The building take a step back from the water front, as power supple when the grid is damaged during the counter measure for the sea level rising. flood. 18


June 21st’s solar diagram without solar veil, the sunlight hour in South-West and South-East facade is receiving over 6 hours of sun light.

June 21st’s solar diagram with solar veil, now the South-West and South-East facade is receiving about 2-3 hours of direct sunlight.

December 21st’s solar diagram without solar veil, the sunlight hour in South-West and South-East facade is receiving 1.5-3 hours of sun light.

June 21st’s solar diagram with solar veil, now the SouthWest and South-East facade is receiving less than 1 hours of direct sunlight. 19


20

June 21st’s radiation diagram without solar veil, the radiation on the South-West and South-East facade is receiving 2.09 kWH/m2 of radiation.

June 21st’s radiation diagram with solar veil, now the radiation on the South-West and South-East facade was reduced, it will reduce the heat gain by building during summer.

December 21st’s radiation diagram without solar veil, the radiation on the South-West and South-East facade is receiving 0.27 kWH/m2 of radiation.

December 21st’s radiation diagram with solar veil, now the radiation on the South-West and South-East facade almost did not changed. The heat gain is still almost the same.


Elevations

East

North

West

South

Longitudinal Section

21


22


“DETAILS” BUBBLE TEA STORE TSM2006 Detailing &Construction Document Instructor: Virginia Rogers Date: 7th, Jun 2021 - 31st, Jul 2021 Individual Work

23


Zhaoyu Architect

Bubble T

LEGEND A 1.0 LEVEL 1 FLOOR PLAN A 1.1 LEVEL 2 FLOOR PLAN A 1.2 RCP A 2.0 ELEVATION A 3.0 BUILDING SECTION A 4.1 STAIRCASE A 5.0 DETAILS@ GRADE A 5.1 DETAILS@ ROOF A 5.2 DETAILS@ WINDOW A 5.3 TYPE A DOOR A 5.4 TYPE B DOOR A 6.0 FINISH SCHEDULE A 6.1 DOOR SCHEDULE F 5.0 FIRE RESISTIVE ASSEMBLY

1

Perspective Cover

24

I 1.0 LEVEL 1 FINISH PLAN I 1.1 LEVEL 2 FINISH PLAN I 4.0 ACCENT WALL ELEVATION I 4.1 CASEWORK I 5.0 ACCENT WALL SECTION I 5.1 CASEWORK DETAILS

DATE

14, Jun,

SHEET TIT

Pliminar List NAME

Zhaoyu SCALE

1/8" 1'-0

SHEET #

A 0.0

HW #

HW #1


1

1

A 3.0

A 4.1

1

2

2.6

3

48' - 0"

A

22' - 10"

Zhaoyu Architect

1' - 2" 1' - 2"

22' - 10"

3' - 0" 9' - 1 1/2"

2

3

4

3' - 4 3/4"

Storage 6' - 2 7/32"

Kitchen 3' - 2 1/2"

14' - 3 7/16"

Restroom

9' - 10 27/32"

6' - 0"

7' - 7 3/32"

7' - 8 1/16"

7' - 8 11/32"

22' - 0 5/16"

6' - 5 1/4"

Bubble Tea Store 22' - 10 1/4"

1' - 2"

3' - 4"

3' - 2 1/2"

Hallway

38' - 0 17/32"

31' - 11 5/16"

B

48' - 0"

5

Sales Area

DATE 22' - 10 11/32"

1 UP

4' - 0 7/8"

18' - 7 3/32"

11' - 0 3/8" 2' - 6 11/32"

2' - 10 1/4"

4' - 2 5/32"

5' - 0 27/32" 2' - 6 11/32"

1' - 1 13/32"

NAME

2' - 10 1/4"

C

SHEET TITLE

Level 1 Floor Plan

9' - 8 1/4" 3' - 2 1/2"

36' - 5 7/8"

21, Jun, 2021

Zhaoyu You SCALE

1/8" 1'-0" SHEET #

A 1.0 1

1

Level 1 1/8" 1'-0"

A 2.0

HW #

HW #1

25


1 A 3.0

1

2

2.6

3

48' - 0"

A

22' - 10"

22' - 0 25/32"

7' - 7 13/16"

Zhaoyu Architect

1' - 2" 1' - 2"

22' - 10"

6' - 0" 7' - 8 11/32"

1' - 2"

Restroom 14' - 2 13/16"

7

22' - 10 1/4"

3' - 2 1/2"

6

DN

52' - 0"

50' - 7 5/8"

3' - 4"

B

Bubble T

6' - 1 19/32"

Storage

Seating Area 8

14' - 2 9/16"

22' - 10 11/32"

DATE

46' - 7 5/8"

4' - 0 7/8"

1

26

Level 2 1/8" 1'-0"

18' - 7 3/32"

2' - 6 11/32"

20' - 3 3/8"

2' - 6 11/32"

SHEET TIT

Level 2 F Plan NAME

Zhaoyu 5' - 1 13/32"

C

21, Jun,

SCALE

1/8" 1'-0 SHEET #

A 1.1

1 A 2.0

HW #

HW #1


1

2

2.6

LEGEND

3

2

2'X1' ACT Panels

A 1.2

9' - 0"

6" Recessed Downlight

9' - 0"

Armstrong WOODWORK Ceiling Panel

8" Recessed Downlight

A

9" LED Ceiling Light

Zhaoyu Architect

2X4 ACT Ceiling Tile

Linear Pedent Light Linear Box Ceiling Light

9' - 0" 9' - 0"

Bubble T 3 5/8" Mtl Stud Framing Secured to STRUCT. Above

9' - 0"

B

0' - 6"

Direct Cove Light Fixture

2'X4' ACT Ceiling Tile 9' - 7 1/8" 9' - 7 1/8"

0' - 6"

DATE

3 5/8" Channel Stud

6, Jul, 20

Corner Bead

SHEET TIT

Gypsum Wall Board

Lvl1 Ref Ceiling P

C

NAME

Zhaoyu SCALE

As Show

Armstrong WOODWORKS Grille Ceiling Panel

SHEET #

1

A 1.2

A 2.0

1

Level 1 1/8" 1'-0"

2

Cove Light Section DETAIL 1 1/2" 1'-0"

HW #

HW #7

27


1

1

A 3.0

2

2.6

3

Sheet Metal Parapet Cap

5' - 0 1/32"

T.O. STEEL 25' - 6"

2' - 0 1/32"

6' - 9"

2' - 9"

T.O PARAPET 28' - 3"

Bubble T

4' - 6"

6' - 0"

Equitone Tectiva Fiber Cement Board 13' - 0"

Zhaoyu Architect

2' - 0"

Level 2 12' - 6"

2' - 0"

DATE

SHEET TIT 7' - 0"

9' - 0"

12' - 6"

21, Jun,

Front Ele Level 1 0' - 0" 11' - 0 3/8" 18' - 7 3/32"

5' - 0 27/32" 20' - 3 3/8"

Grade -0' - 3" T.O. Fnd. Wall -1' - 0"

1

28

South 3/16"

B.O. Footing -4' - 0" 1'-0"

NAME

Zhaoyu SCALE

1/8" 1'-0

SHEET #

A 2.0

HW #

HW #1


C

B

A

52' - 0" 5' - 1 13/32"

22' - 10 11/32"

2' - 9"

1'-0"

22' - 10 1/4"

1' - 2"

1/4"

1' - 3 11/16" 2' - 6 1/16"

T.O. STEEL 25' - 6"

Bubble T

1' - 4 11/16"

Level 2 12' - 6"

1' - 6 13/32"

2 A 1.2 DATE

9' - 0"

9' - 9"

12' - 6"

0' - 7 13/32"

28' - 3"

9' - 0"

6' - 0"

13' - 0"

Zhaoyu Architect

T.O PARAPET 28' - 3"

21, Jun,

Level 1 0' - 0" Grade -0' - 3"

48' - 0"

1

SHEET TIT

Section

T.O. Fnd. Wall -1' - 0" B.O. Footing -4' - 0"

NAME

Zhaoyu SCALE

3/16" 1'

Section 1 3/16" 1'-0"

SHEET #

A 3.0

HW #

HW #1

29


Zhaoyu Architect

2

Stair Perspective

3

B

Stair Perspective 2

Bubble T

1' - 0"

2' - 10"

0' - 11"

3' - 8"

Stainless Steel Guardrail Cherry Wood Handrail

Level 2 12' - 6"

DATE

Marble Landing

12, Jul, 2

7' - 10 21/32"

SHEET TIT

1' - 0"

Stairs Se 0' - 4"

3' - 8"

NAME

0' - 11"

Zhaoyu

0' - 6 13/16" 3' - 8"

1

30

SCALE

3/8" 1'-0

Cast-in-Place Concrete

2' - 10"

4' - 0 13/16"

0' - 1" 0' - 11"

Staircase Section 3/8" 1'-0"

Marble Threads & Landing

SHEET #

Level 1 0' - 0" Grade -0' - 3"

A 4.1

HW #

HW #10


C

Zhaoyu Architect Equitone Tectiva Fiber Cement Board

5/8" Gypsum Wall Board

1" Air Space Bubble Tea Store

Light Gauge Zee 2" XPS Rigid Insulation (R-10ci) Air & Vapor Barrier 5/8" DenseGlass Sheathing 3 5/8" Rockwool Cavity Insulation (R-15.58) Channel Stud Level 1 0' - 0" Grade -0' - 3" 12" Concrete Foundation Wall T.O. Fnd. Wall -1' - 0"

2" Rigid Insulation 6" Concrete Slab Continuous Air&Water Barrier 2" XPS Rigid Insulation (R-10ci) 8" Crushed Stone

DATE

28, Jun, 2021

SHEET TITLE

DETAILS@Grade

NAME

Zhaoyu You SCALE

1 1/2" 1'-0"

SHEET #

A 5.0 Wall at Grade DETAIL 1 1 1/2" 1'-0" HW #

HW #4

31


Sheet Metal Cap Flashing

T.O PARAPET 28' - 3"

Zhaoyu Architect

Equitone Tectiva Fiber Cement Board 1" Air Space 2" XPS Rigid Insulation (R-10ci)

EPDM Roof Membrane 1'-0"

1/4"

Taper Top Rigid Insulation

Bubble T

Air & Vapor Barrier 5/8" DenseGlass Sheathing 3" close cell Spray Foam Insulation (R-18) 3 5/8" Channel Stud

Roof Rigid Insulation (6" Min) Air & Vapor Barrier 5/8" DenseDeck T.O. STEEL 25' - 6" Metal Deck

3 5/8" Rockwool Cavity Insulation (R-15.58)

Light Gauge Zee

Metal Angle

DATE

28, Jun,

SHEET TIT

DETAILS

NAME

Zhaoyu SCALE

1 1/2" 1

1

Wall at Roof DETAIL 1 1/2" 1'-0"

SHEET #

A 5.1

HW #

HW #5

32


Zhaoyu Architect Equitone Tectiva Fiber Cement Board 1" Air Space 2" XPS Rigid Insulation (R-10ci)

5/8" Gypsum Board 3 5/8" Rockwool Cavity Insulation (R-15.58)

Bubble Tea Store

Air & Vapor Barrier Top Plate

DATE

Flashing FRT Wood Buck Channel Stud 5/8" DenseGlass Sheathing 3 5/8" Rockwool Cavity Insulation (R-15.58) 1

Wall at Window DETAIL 1 1/2" 1'-0"

Wood Sill Plate Air & Vapor Barrier 5/8" Gypsum Board

28, Jun, 2021

SHEET TITLE

DETAILS@ Window NAME

Zhaoyu You SCALE

1 1/2" 1'-0"

SHEET #

A 5.2

HW #

HW #6

33


3' - 4" 3' - 0"

3' - 0"

2' - 0 5/8"

Painted Metal

Painted Metal

3 A 5.3 3' - 4"

3 A 5.3

1

Type A Door Elevation 1/2" 1'-0"

2

Type A Frame Elevation 1/2" 1'-0"

Joint Sealant 0' - 0 1/2"

5/8" Gypsum Wall Board 0' - 2"

0' - 0 5/8"

0' - 5 1/2"

Joint Sealant

3

34

TYPE A Door Jamb Detail 3" 1'-0"

0' - 0 1/2"

0' - 2 7/16"

0' - 6 1/2"

Double 3 5/8" Steel Stud

7' - 2"

7' - 0"

5' - 8 5/8"

Handle Lever

7' - 0"

Glazing


3' - 4"

3' - 0"

3' - 0"

Painted Metal

Zhaoyu Architect Handle Lever

3

7' - 0"

7' - 0"

3 A 5.4

A 5.4

7' - 2"

Painted Metal

Bubble T

1

Type B Door Elevation 1/2" 1'-0"

2

Joint Sealant Gypsum Wall Board

Type B Framer Elevation 1/2" 1'-0"

0' - 0 1/2"

DATE

25, Jul, 2

0' - 0 5/8"

SHEET TIT

0' - 2 7/16"

Double Steel Stud

0' - 2"

0' - 5 1/2"

NAME

0' - 1 15/16"

0' - 0 1/2"

0' - 5 7/8"

Type B D

Zhaoyu SCALE

As Show

Joint Sealant

SHEET #

A 5.3 3

Type B Door Jamb Detail 3" 1'-0"

HW #

HW #13

35


Finish Schedule Number 1 2 3 4 5 6 7 8

36

Name Sales Area Kitchen Storage Restroom Hallway Storage Restroom Seating Area

Floor Finish Base Finish Wall Finish Vinyl Tile Rubber Rubber Porcelain Tile Terrazzo Rubber Porcelain Tile Vinyl Tile

Vinyl Nora Nora Vinyl Vinyl Nora Vinyl Vinyl

PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB

Ceiling Finish Wooden Ceiling Panel 2X4 Ceiling Tile 2X4 Ceiling Tile 2X4 Ceiling Tile Wooden Ceiling Panel 2X4 Ceiling Tile 2X4 Ceiling Tile Wooden Ceiling Panel

Remarks


Zhaoyu Architect

Bubble Tea S

Door Schedule Number 1a 1b 2 3 4 5 6 7

Location Sales Area Sales Area Kitchen Storage Restroom Sitting Area Storage Restroom

Door Size Door Drame Type Width Height Thickness Material Finish Frame Material Frame Finish A A B B C A B C

3' - 0" 3' - 0" 3' - 0" 3' - 0" 2' - 8" 3' - 0" 3' - 0" 2' - 8"

7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0"

0' - 1 3/4" 0' - 1 3/4" 0' - 1 3/4" 0' - 1 3/4" 0' - 2" 0' - 1 3/4" 0' - 1 3/4" 0' - 2"

Metal Metal Metal Metal Wood Metal Metal Wood

Paint Paint Paint Paint Paint Paint Paint Paint

Metal Metal Metal Metal Wood Metal Metal Wood

Paint Paint Paint Paint Paint Paint Paint Paint

Fire Rating 45 min 45 min

45 min

Notes

Hardware Handle Lever Handle Lever Handle Lever Handle Lever Handle Lever Handle Lever Handle Lever Handle Lever

DATE

25, Jul, 2021

SHEET TITLE

Door Schedu

NAME

Zhaoyu You SCALE

NTS

SHEET #

A 6.1

HW #

HW #13

37


2.6 Head of Wall - 1hr UL Design: HW-D 0252 UL Design: HW-D-0259

T.O. STEEL 25' - 6" Metal Deck Spray-Applied Fire Resistive Material W16x26 Steel Beam 20 GA.20 GA. Z-Clips @ 16" O.C. MAX., Fasten Before Application of Spray on Fireproofing Elastomeric Spray Firestop Mineral Wool Insulation Fasten Steel Track to Z-Clips

Zhaoyu Architect

Bubble T

5/8" Fire-Shield Gypsum Board FIREGLASS FireLite PLUS WS Clearview System Level 2 12' - 6" Flexible Sealant Concrete on Fluted Steel Deck Spray-Applied Fire Resistive Material W16x26 Steel Beam 20 GA.20 GA. Z-Clips @ 16" O.C. MAX., Fasten Before Application of Spray on Fireproofing Elastomeric Spray Firestop Mineral Wool Insulation Fasten Steel Track to Z-Clips 5/8" Fire-Shield Gypsum Board Partition - 1hr UL Design: U465 UL Design: V 438

Glass Fiber Insulation

09, Jul, 2

SHEET TIT

Fire-Res Assemb NAME

Zhaoyu SCALE

1 1/2" 1

SHEET #

F 5.0

Steel Track - Mechnically Fasten 24" O.C.MAX.

Level 1 0' - 0" 1

38

DATE

Fire-Resistive Assemblies DETAIL 1 1/2" 1'-0"

Flexible Sealant

HW #

HW #9


1

2

2.6

3

Zhaoyu Architect

A Storage 3

Kitchen

Restroom

Bubble T

4

Vinyl Tile

2

Terrazzo

Hallway 5

B

Porcelain TIle

Rubber DATE

Sales Area

I 5.0

SHEET TIT Accent Wall Elevation

1

19, Jul, 2

1

1

Level 1 F Plan NAME

AI 4.0 5.3

Zhaoyu SCALE

C

1/8" 1'-0

SHEET #

I 1.0 1

Finish Plan Lvl 1 1/8" 1'-0"

HW #

HW #11

39


1

2

2.6

3

A Restroom Storage 6

7 Vinyl Tile

Terrazzo

Porcelain TIle

B

Seating Area 8

C

1

40

Finish Plan Lvl 2 1/8" 1'-0"

Rubber


Zhaoyu Architect

C

1 I 5.0

B

Bubble T

DATE

19, Jul, 2

SHEET TIT

Accent W Elevatio NAME

Zhaoyu 1

SCALE

Accent Wall Elevation 3/8" 1'-0"

3/8"

1'

SHEET #

I 4.0

HW #

HW #11

41


2

3

I 5.1

I 4.1

2

2

I 4.1

Reception Desk Computer 3' - 6 1/2"

6' - 2"

Type B Framer Door 1 Elevation 2

Zhaoyu Architect

1 I 5.1

A 5.4 -

Printer

3' - 4"

3' - 3"

Bubble T

B 21' - 4 29/32"

Accessible Counter 1

Casework 3/8" 1'-0"

DATE

19, Jul, 2

1

1

SHEET TIT

I 5.1

I 5.1

Casewo

Marble Counter Top

6' - 2"

3' - 4"

NAME

Zhaoyu

2' - 10"

Terrazzo Solid Surface

3' - 6"

SCALE

As Show

SHEET #

I 4.1

2

42

Service Side 1/2" 1'-0"

3

Work Side 1/2" 1'-0"

HW #

HW #12


2.6 Zhaoyu Architect Armstrong WOODWORKS Ceiling Panel

Bubble Tea Store

Gypsum Wall Board 3-5/8" Mtl Stud w. Glass Fiber Insulation

DATE

Vinyl Base Armstrong Conposite Vinyl Tiling 5/8" Plywood Sheathing

Terrazzo Wall Tile Vinyl Base Terrazzo

19, Jul, 2021

SHEET TITLE

Accent Wall Section NAME

Zhaoyu You SCALE

1"

1'-0"

SHEET #

I 5.0 Accent Wall Section 1 1" 1'-0"

HW #

HW #11

43


Zhaoyu Architect

Bubble T 3

Casework Perspective

4

Casework Perspective 2 3' - 4"

Solid Surface Per Schedule Blocking 1' - 7"

2' - 8 1/2"

0' - 5 1/8" 0' - 2 3/8"

Solid Surface Per Schedule 0' - 4 1/2"

1' - 7"

Heavy Duty Support Angle

Heacy Duty Support Angle DATE

5/8" Veneer

19, Jul, 2

5/8" Plywood 2' - 10"

2' - 10"

SHEET TIT

Casewo Details NAME

Zhaoyu SCALE

Cove Per Schedule Blocking

Cove Per Schedule

1/2"

1'

SHEET #

I 5.1

1

Reception Desk Section 1 1/2" 1'-0"

44

2

Counter Section 1 1/2" 1'-0"

HW #

HW #12


“Waterfalls” Paintings for decoration Mirror and Graffiti Freelances Date: 1th, Oct 2015 - 10th, Mar 2019 Teamwork

45


46


47


Thanks For Your Reading Please contact me via zhaoyu.you@the-bac.edu or (+1)781-333-7497


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.