ARC 3306 Studio I
Architectural portfolio
ARC3308 Studio III
table of contents
introduction Résumé
Architectural Architectural Studio II Sustainable Systems 1 Detailing &Construction Doc
Other Works 3 13 23
Paintings
45
Zhaoyu You ABOUT ME
Having academic background in Marketing, I am capable of analyzing the market, effectively communicating with the collagues and clients, working collectively with teammates, evaluating the effectiveness of visual communication and researching cases thoroughly. My marketing degree will be the aid for my architectural expertise since architects need to create spaces based on the requirements from the clients. By combining my marketing knowledges with my architectural skills, I can build stonger stories for my designs.
EDUCATION
Boston Architectural College August 2019 to present Candidate for Master of Architecture Candidate for NCARB IPAL Program
Wenzhou-Kean University August 2015 to June 2019 Bachelor of Science Major in International Marketing
EXPERIENCE
Phi Architect - Intern Architect March 2020 to October 2020 Converted SketchUp site model into Rhino site model and prepared site drawings at different scales. Assisted the supervisor with the schematic design and master plan generation. Used InDesign to document the result from analysis. Participated discussions and meetings online using Zoom. ZeroHouseDesigns - Volunteer December 2019 to April 2020 Prepared site drawings for the zoning and conceptual design for the supervisor. Built the site model in Revit for designing. Visualized supervisor’s design in Revit and rendered in Rhino using V-ray. Hebei Jianyan Architectural Design Co. - Intern July 2019 to August 2019 Participated in schematic design of residential and educational buildings. Prepared the PowerPoint for the presentation to the clients on touristic project. Cooperated with the outsourced rendering company for the project report to the client. Michael Graves College of WKU - Student Assistant September 2016 to June 2019 Led a team of 8 as the director of files classification, preparation and translation. Used Photoshop and Illustrator to design posters for the college. Worked with the IT department on the editing of propaganda video. Communicated with design professionals on the content of their lecture and details of their trip to our college. 1
SKILLS 3D Model & Render Rhino V-ray for Rhino Revit Enscape SketchUp AutoCAD Arkio
Graphic Design Adobe Photoshop CC Adobe Illustrator CC Adobe InDesign CC Adobe Lightroom
Grasshopper Elk (GIS data) Bison (Land Analysis) Ladybug (Climate) Honeybee (Energy) Sunflower (Solar)
Video Editing Adobe Premiere CC iMovie
Office Work Microsoft Office IBM SPSS
Modeling 3D Printing Military Models
Culture & Art Painting Art History Egyptian History Fengshui
Science Engineering Biology Linguistic
Sports Baseball Mountain Biking Hiking Snowboarding
INTERESTS Architectural Museum Hotel Multi-family Residential Ancient Architecture
HONORS Nomination BAC Segment I Portfolio Award for 2020
Awarded Paper WKU Student Research Day for 2019
3rd Place WKU Wall Painting Competition for 2015
DesignViz of BSA Member of DesignViz 2020-2021
WKU College of Architectural and Design Student Assistant 2016-2017
WKU Student Government Member of Program Department 2016-2017
Member of VR Chort 2021
Director of Student Assistants 2017-2019
Vice President, President of Program 2017-2018
LEADERSHIPS
2
“on the slope” Mission Hill cider brewery ARC3307 Architecture Studio II Instructor: Chala Hadimi Date: 1st, Jun 2020 - 25th, Jul 2020 Individual work
3
Concept Model #4 This conceptual model was based on the history of the evolution of the road network near the mission hill. 4
Tectonic Model #1 This model, as the first tectonic model develpoed for the project, established the basic language of penetrating and intersecting between Vertical and Horizontal.
Tectonic Model #5 As one of the descendant of tectonic model #1, this model considered the angle between the building and the street, in order to adapt to the sunshine was required by the orchard and the view from the 2nd floor.
Tectonic Model #7 This model is the further development of the tectonic model #5, with more consideration of the orchard. Even the angel was not brought into further development, the idea of penetrating mass was successful.
5
1
2
1. Tectonic Generation The diagrams illustrated the idea of intersecting tectonic with mass and architectural elements.
2. Explosion Diagram This diagram explained the relationship between different parts of this building. 6
Circulation Diagrams 7
1
1
2
3
1. Solor Diagrams These diagrams helped me to locate the orchard for apple trees. 2. Program Diagram 3. Orchard Placement 8
Site Plan 9
2nd Floor Plan
1st Floor Plan 10
Section A-A
Section B-B
Section C-C
11
12
“Solar veil” Sustainability + Resiliency TSM2001 Sustainable Systems Instructor: Rebecca Rahmlow Date: 24th, Aug 2020 - 23rd, Dec 2020 Individual work
13
1
New England Aquarium
2
Rose Kennedy Greenway
3
James Hook & Co
4
The Institute of Contemporary Art
5
South Station
6
Boston Tea Party Ships & Museum
7
Boston Convention and Exhibition Center
8
Boston Children's Museum
One of the most important fact of this site is the site is surrounded by several public buildings related to children. So, the site itself can be an extention to the current context, and keeps serving the children and parents in the community. To summarize, this project will be a mix-used project which includes commercial/community functions, the building will be majorly focused on enhancing the relationship between parents and thir kids.
14
Space Name
Occupants per Room
Area
QuantityT otal Occupants Total Area
Energy Consumption
1
28 Sqft
15
V15/E0
422 Sqft
37684.6 kBtu
Multi-Function Room
13
857 Sqft
5
V60/E5
4287 Sqft
469855.2 kBtu
Multi-Media Room
83
2437 Sqft
1
V80/E3
2437 Sqft
320465.5 kBtu
Lobby
15
2188 Sqft
1
V13/E2
2188 Sqft
239804.8 kBtu
baby accessories/children’s garments shop
24
2447 Sqft
1
V20/E4
2447 Sqft
239640 kBtu
233 Sqft
3
0
701 Sqft
62599.3 kBtu
15
1216 Sqft
1
V0/E15
1216 Sqft
141542.4 kBtu
51
5216 Sqft
1
V50/E1
5216 Sqft
584192 kBtu
Lactation room
Restroom
Indoor Playground
Total
V238/E30
f Roo
The Building will implement High Efficiency solar panels flat on roof, the energy yield per year per panel is 1356.556608 kBtu, the predicted EUI of my building is 644935.1 kBtu, the panels needed is 475.4≈476 panels, Toilets and Urinals: Sink: Breakroom: Sum:
19906 Sqft
2149784 kBtu
en Gard
ray
r PV A
ray
r PV A
53817.92 Gallons/yr 5434 Gallons/yr 3510 Gallons/yr 62761.92 Gallons/yr 15
Baby Accessories Store Conference Room
Circulation Core Classroom 3rd Floor: Half of the 3rd floor was sheltered by the roof. This design can provide extra space for resilient use.
2nd Floor: This floor provides 4 Multi-fuctional rooms as classrooms. The 2nd floor is directly accessible via ramp from ground level.
1st Floor: This floor provides a multifunctional space for this building. 16
Restroom Mother’s Room
The sun chart is very important for me to evaluate the strategy to deal with the sun on site and for my building. According to the sun chart from december 21 to June 21, the most of the days will need sun light to help heating the building. For the summer, about 1/3 of te days need shade, and the 2/3 of the days need sun to help with heating. So, the intergreted solar veil will adapt to the local condition, in order to optimize the heating and cooling performance with the sun, in the summer, the building need to create shade to the building, and in the winter, the solar veil will need to allow sunlight to heat the building.
After I decided to design a solar veil for the proposed building, I created a grasshopper script in order to generate a solar veil with adjustable angle and density for the future calculation. 17
The Ramp will provide direct access to the 2nd floor The Top follor have extra space as emergency shelter. under flooding situation.
Extra PV panels are placed on the roof, to provide extra The building take a step back from the water front, as power supple when the grid is damaged during the counter measure for the sea level rising. flood. 18
June 21st’s solar diagram without solar veil, the sunlight hour in South-West and South-East facade is receiving over 6 hours of sun light.
June 21st’s solar diagram with solar veil, now the South-West and South-East facade is receiving about 2-3 hours of direct sunlight.
December 21st’s solar diagram without solar veil, the sunlight hour in South-West and South-East facade is receiving 1.5-3 hours of sun light.
June 21st’s solar diagram with solar veil, now the SouthWest and South-East facade is receiving less than 1 hours of direct sunlight. 19
20
June 21st’s radiation diagram without solar veil, the radiation on the South-West and South-East facade is receiving 2.09 kWH/m2 of radiation.
June 21st’s radiation diagram with solar veil, now the radiation on the South-West and South-East facade was reduced, it will reduce the heat gain by building during summer.
December 21st’s radiation diagram without solar veil, the radiation on the South-West and South-East facade is receiving 0.27 kWH/m2 of radiation.
December 21st’s radiation diagram with solar veil, now the radiation on the South-West and South-East facade almost did not changed. The heat gain is still almost the same.
Elevations
East
North
West
South
Longitudinal Section
21
22
“DETAILS” BUBBLE TEA STORE TSM2006 Detailing &Construction Document Instructor: Virginia Rogers Date: 7th, Jun 2021 - 31st, Jul 2021 Individual Work
23
Zhaoyu Architect
Bubble T
LEGEND A 1.0 LEVEL 1 FLOOR PLAN A 1.1 LEVEL 2 FLOOR PLAN A 1.2 RCP A 2.0 ELEVATION A 3.0 BUILDING SECTION A 4.1 STAIRCASE A 5.0 DETAILS@ GRADE A 5.1 DETAILS@ ROOF A 5.2 DETAILS@ WINDOW A 5.3 TYPE A DOOR A 5.4 TYPE B DOOR A 6.0 FINISH SCHEDULE A 6.1 DOOR SCHEDULE F 5.0 FIRE RESISTIVE ASSEMBLY
1
Perspective Cover
24
I 1.0 LEVEL 1 FINISH PLAN I 1.1 LEVEL 2 FINISH PLAN I 4.0 ACCENT WALL ELEVATION I 4.1 CASEWORK I 5.0 ACCENT WALL SECTION I 5.1 CASEWORK DETAILS
DATE
14, Jun,
SHEET TIT
Pliminar List NAME
Zhaoyu SCALE
1/8" 1'-0
SHEET #
A 0.0
HW #
HW #1
1
1
A 3.0
A 4.1
1
2
2.6
3
48' - 0"
A
22' - 10"
Zhaoyu Architect
1' - 2" 1' - 2"
22' - 10"
3' - 0" 9' - 1 1/2"
2
3
4
3' - 4 3/4"
Storage 6' - 2 7/32"
Kitchen 3' - 2 1/2"
14' - 3 7/16"
Restroom
9' - 10 27/32"
6' - 0"
7' - 7 3/32"
7' - 8 1/16"
7' - 8 11/32"
22' - 0 5/16"
6' - 5 1/4"
Bubble Tea Store 22' - 10 1/4"
1' - 2"
3' - 4"
3' - 2 1/2"
Hallway
38' - 0 17/32"
31' - 11 5/16"
B
48' - 0"
5
Sales Area
DATE 22' - 10 11/32"
1 UP
4' - 0 7/8"
18' - 7 3/32"
11' - 0 3/8" 2' - 6 11/32"
2' - 10 1/4"
4' - 2 5/32"
5' - 0 27/32" 2' - 6 11/32"
1' - 1 13/32"
NAME
2' - 10 1/4"
C
SHEET TITLE
Level 1 Floor Plan
9' - 8 1/4" 3' - 2 1/2"
36' - 5 7/8"
21, Jun, 2021
Zhaoyu You SCALE
1/8" 1'-0" SHEET #
A 1.0 1
1
Level 1 1/8" 1'-0"
A 2.0
HW #
HW #1
25
1 A 3.0
1
2
2.6
3
48' - 0"
A
22' - 10"
22' - 0 25/32"
7' - 7 13/16"
Zhaoyu Architect
1' - 2" 1' - 2"
22' - 10"
6' - 0" 7' - 8 11/32"
1' - 2"
Restroom 14' - 2 13/16"
7
22' - 10 1/4"
3' - 2 1/2"
6
DN
52' - 0"
50' - 7 5/8"
3' - 4"
B
Bubble T
6' - 1 19/32"
Storage
Seating Area 8
14' - 2 9/16"
22' - 10 11/32"
DATE
46' - 7 5/8"
4' - 0 7/8"
1
26
Level 2 1/8" 1'-0"
18' - 7 3/32"
2' - 6 11/32"
20' - 3 3/8"
2' - 6 11/32"
SHEET TIT
Level 2 F Plan NAME
Zhaoyu 5' - 1 13/32"
C
21, Jun,
SCALE
1/8" 1'-0 SHEET #
A 1.1
1 A 2.0
HW #
HW #1
1
2
2.6
LEGEND
3
2
2'X1' ACT Panels
A 1.2
9' - 0"
6" Recessed Downlight
9' - 0"
Armstrong WOODWORK Ceiling Panel
8" Recessed Downlight
A
9" LED Ceiling Light
Zhaoyu Architect
2X4 ACT Ceiling Tile
Linear Pedent Light Linear Box Ceiling Light
9' - 0" 9' - 0"
Bubble T 3 5/8" Mtl Stud Framing Secured to STRUCT. Above
9' - 0"
B
0' - 6"
Direct Cove Light Fixture
2'X4' ACT Ceiling Tile 9' - 7 1/8" 9' - 7 1/8"
0' - 6"
DATE
3 5/8" Channel Stud
6, Jul, 20
Corner Bead
SHEET TIT
Gypsum Wall Board
Lvl1 Ref Ceiling P
C
NAME
Zhaoyu SCALE
As Show
Armstrong WOODWORKS Grille Ceiling Panel
SHEET #
1
A 1.2
A 2.0
1
Level 1 1/8" 1'-0"
2
Cove Light Section DETAIL 1 1/2" 1'-0"
HW #
HW #7
27
1
1
A 3.0
2
2.6
3
Sheet Metal Parapet Cap
5' - 0 1/32"
T.O. STEEL 25' - 6"
2' - 0 1/32"
6' - 9"
2' - 9"
T.O PARAPET 28' - 3"
Bubble T
4' - 6"
6' - 0"
Equitone Tectiva Fiber Cement Board 13' - 0"
Zhaoyu Architect
2' - 0"
Level 2 12' - 6"
2' - 0"
DATE
SHEET TIT 7' - 0"
9' - 0"
12' - 6"
21, Jun,
Front Ele Level 1 0' - 0" 11' - 0 3/8" 18' - 7 3/32"
5' - 0 27/32" 20' - 3 3/8"
Grade -0' - 3" T.O. Fnd. Wall -1' - 0"
1
28
South 3/16"
B.O. Footing -4' - 0" 1'-0"
NAME
Zhaoyu SCALE
1/8" 1'-0
SHEET #
A 2.0
HW #
HW #1
C
B
A
52' - 0" 5' - 1 13/32"
22' - 10 11/32"
2' - 9"
1'-0"
22' - 10 1/4"
1' - 2"
1/4"
1' - 3 11/16" 2' - 6 1/16"
T.O. STEEL 25' - 6"
Bubble T
1' - 4 11/16"
Level 2 12' - 6"
1' - 6 13/32"
2 A 1.2 DATE
9' - 0"
9' - 9"
12' - 6"
0' - 7 13/32"
28' - 3"
9' - 0"
6' - 0"
13' - 0"
Zhaoyu Architect
T.O PARAPET 28' - 3"
21, Jun,
Level 1 0' - 0" Grade -0' - 3"
48' - 0"
1
SHEET TIT
Section
T.O. Fnd. Wall -1' - 0" B.O. Footing -4' - 0"
NAME
Zhaoyu SCALE
3/16" 1'
Section 1 3/16" 1'-0"
SHEET #
A 3.0
HW #
HW #1
29
Zhaoyu Architect
2
Stair Perspective
3
B
Stair Perspective 2
Bubble T
1' - 0"
2' - 10"
0' - 11"
3' - 8"
Stainless Steel Guardrail Cherry Wood Handrail
Level 2 12' - 6"
DATE
Marble Landing
12, Jul, 2
7' - 10 21/32"
SHEET TIT
1' - 0"
Stairs Se 0' - 4"
3' - 8"
NAME
0' - 11"
Zhaoyu
0' - 6 13/16" 3' - 8"
1
30
SCALE
3/8" 1'-0
Cast-in-Place Concrete
2' - 10"
4' - 0 13/16"
0' - 1" 0' - 11"
Staircase Section 3/8" 1'-0"
Marble Threads & Landing
SHEET #
Level 1 0' - 0" Grade -0' - 3"
A 4.1
HW #
HW #10
C
Zhaoyu Architect Equitone Tectiva Fiber Cement Board
5/8" Gypsum Wall Board
1" Air Space Bubble Tea Store
Light Gauge Zee 2" XPS Rigid Insulation (R-10ci) Air & Vapor Barrier 5/8" DenseGlass Sheathing 3 5/8" Rockwool Cavity Insulation (R-15.58) Channel Stud Level 1 0' - 0" Grade -0' - 3" 12" Concrete Foundation Wall T.O. Fnd. Wall -1' - 0"
2" Rigid Insulation 6" Concrete Slab Continuous Air&Water Barrier 2" XPS Rigid Insulation (R-10ci) 8" Crushed Stone
DATE
28, Jun, 2021
SHEET TITLE
DETAILS@Grade
NAME
Zhaoyu You SCALE
1 1/2" 1'-0"
SHEET #
A 5.0 Wall at Grade DETAIL 1 1 1/2" 1'-0" HW #
HW #4
31
Sheet Metal Cap Flashing
T.O PARAPET 28' - 3"
Zhaoyu Architect
Equitone Tectiva Fiber Cement Board 1" Air Space 2" XPS Rigid Insulation (R-10ci)
EPDM Roof Membrane 1'-0"
1/4"
Taper Top Rigid Insulation
Bubble T
Air & Vapor Barrier 5/8" DenseGlass Sheathing 3" close cell Spray Foam Insulation (R-18) 3 5/8" Channel Stud
Roof Rigid Insulation (6" Min) Air & Vapor Barrier 5/8" DenseDeck T.O. STEEL 25' - 6" Metal Deck
3 5/8" Rockwool Cavity Insulation (R-15.58)
Light Gauge Zee
Metal Angle
DATE
28, Jun,
SHEET TIT
DETAILS
NAME
Zhaoyu SCALE
1 1/2" 1
1
Wall at Roof DETAIL 1 1/2" 1'-0"
SHEET #
A 5.1
HW #
HW #5
32
Zhaoyu Architect Equitone Tectiva Fiber Cement Board 1" Air Space 2" XPS Rigid Insulation (R-10ci)
5/8" Gypsum Board 3 5/8" Rockwool Cavity Insulation (R-15.58)
Bubble Tea Store
Air & Vapor Barrier Top Plate
DATE
Flashing FRT Wood Buck Channel Stud 5/8" DenseGlass Sheathing 3 5/8" Rockwool Cavity Insulation (R-15.58) 1
Wall at Window DETAIL 1 1/2" 1'-0"
Wood Sill Plate Air & Vapor Barrier 5/8" Gypsum Board
28, Jun, 2021
SHEET TITLE
DETAILS@ Window NAME
Zhaoyu You SCALE
1 1/2" 1'-0"
SHEET #
A 5.2
HW #
HW #6
33
3' - 4" 3' - 0"
3' - 0"
2' - 0 5/8"
Painted Metal
Painted Metal
3 A 5.3 3' - 4"
3 A 5.3
1
Type A Door Elevation 1/2" 1'-0"
2
Type A Frame Elevation 1/2" 1'-0"
Joint Sealant 0' - 0 1/2"
5/8" Gypsum Wall Board 0' - 2"
0' - 0 5/8"
0' - 5 1/2"
Joint Sealant
3
34
TYPE A Door Jamb Detail 3" 1'-0"
0' - 0 1/2"
0' - 2 7/16"
0' - 6 1/2"
Double 3 5/8" Steel Stud
7' - 2"
7' - 0"
5' - 8 5/8"
Handle Lever
7' - 0"
Glazing
3' - 4"
3' - 0"
3' - 0"
Painted Metal
Zhaoyu Architect Handle Lever
3
7' - 0"
7' - 0"
3 A 5.4
A 5.4
7' - 2"
Painted Metal
Bubble T
1
Type B Door Elevation 1/2" 1'-0"
2
Joint Sealant Gypsum Wall Board
Type B Framer Elevation 1/2" 1'-0"
0' - 0 1/2"
DATE
25, Jul, 2
0' - 0 5/8"
SHEET TIT
0' - 2 7/16"
Double Steel Stud
0' - 2"
0' - 5 1/2"
NAME
0' - 1 15/16"
0' - 0 1/2"
0' - 5 7/8"
Type B D
Zhaoyu SCALE
As Show
Joint Sealant
SHEET #
A 5.3 3
Type B Door Jamb Detail 3" 1'-0"
HW #
HW #13
35
Finish Schedule Number 1 2 3 4 5 6 7 8
36
Name Sales Area Kitchen Storage Restroom Hallway Storage Restroom Seating Area
Floor Finish Base Finish Wall Finish Vinyl Tile Rubber Rubber Porcelain Tile Terrazzo Rubber Porcelain Tile Vinyl Tile
Vinyl Nora Nora Vinyl Vinyl Nora Vinyl Vinyl
PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB PTD GWB
Ceiling Finish Wooden Ceiling Panel 2X4 Ceiling Tile 2X4 Ceiling Tile 2X4 Ceiling Tile Wooden Ceiling Panel 2X4 Ceiling Tile 2X4 Ceiling Tile Wooden Ceiling Panel
Remarks
Zhaoyu Architect
Bubble Tea S
Door Schedule Number 1a 1b 2 3 4 5 6 7
Location Sales Area Sales Area Kitchen Storage Restroom Sitting Area Storage Restroom
Door Size Door Drame Type Width Height Thickness Material Finish Frame Material Frame Finish A A B B C A B C
3' - 0" 3' - 0" 3' - 0" 3' - 0" 2' - 8" 3' - 0" 3' - 0" 2' - 8"
7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0"
0' - 1 3/4" 0' - 1 3/4" 0' - 1 3/4" 0' - 1 3/4" 0' - 2" 0' - 1 3/4" 0' - 1 3/4" 0' - 2"
Metal Metal Metal Metal Wood Metal Metal Wood
Paint Paint Paint Paint Paint Paint Paint Paint
Metal Metal Metal Metal Wood Metal Metal Wood
Paint Paint Paint Paint Paint Paint Paint Paint
Fire Rating 45 min 45 min
45 min
Notes
Hardware Handle Lever Handle Lever Handle Lever Handle Lever Handle Lever Handle Lever Handle Lever Handle Lever
DATE
25, Jul, 2021
SHEET TITLE
Door Schedu
NAME
Zhaoyu You SCALE
NTS
SHEET #
A 6.1
HW #
HW #13
37
2.6 Head of Wall - 1hr UL Design: HW-D 0252 UL Design: HW-D-0259
T.O. STEEL 25' - 6" Metal Deck Spray-Applied Fire Resistive Material W16x26 Steel Beam 20 GA.20 GA. Z-Clips @ 16" O.C. MAX., Fasten Before Application of Spray on Fireproofing Elastomeric Spray Firestop Mineral Wool Insulation Fasten Steel Track to Z-Clips
Zhaoyu Architect
Bubble T
5/8" Fire-Shield Gypsum Board FIREGLASS FireLite PLUS WS Clearview System Level 2 12' - 6" Flexible Sealant Concrete on Fluted Steel Deck Spray-Applied Fire Resistive Material W16x26 Steel Beam 20 GA.20 GA. Z-Clips @ 16" O.C. MAX., Fasten Before Application of Spray on Fireproofing Elastomeric Spray Firestop Mineral Wool Insulation Fasten Steel Track to Z-Clips 5/8" Fire-Shield Gypsum Board Partition - 1hr UL Design: U465 UL Design: V 438
Glass Fiber Insulation
09, Jul, 2
SHEET TIT
Fire-Res Assemb NAME
Zhaoyu SCALE
1 1/2" 1
SHEET #
F 5.0
Steel Track - Mechnically Fasten 24" O.C.MAX.
Level 1 0' - 0" 1
38
DATE
Fire-Resistive Assemblies DETAIL 1 1/2" 1'-0"
Flexible Sealant
HW #
HW #9
1
2
2.6
3
Zhaoyu Architect
A Storage 3
Kitchen
Restroom
Bubble T
4
Vinyl Tile
2
Terrazzo
Hallway 5
B
Porcelain TIle
Rubber DATE
Sales Area
I 5.0
SHEET TIT Accent Wall Elevation
1
19, Jul, 2
1
1
Level 1 F Plan NAME
AI 4.0 5.3
Zhaoyu SCALE
C
1/8" 1'-0
SHEET #
I 1.0 1
Finish Plan Lvl 1 1/8" 1'-0"
HW #
HW #11
39
1
2
2.6
3
A Restroom Storage 6
7 Vinyl Tile
Terrazzo
Porcelain TIle
B
Seating Area 8
C
1
40
Finish Plan Lvl 2 1/8" 1'-0"
Rubber
Zhaoyu Architect
C
1 I 5.0
B
Bubble T
DATE
19, Jul, 2
SHEET TIT
Accent W Elevatio NAME
Zhaoyu 1
SCALE
Accent Wall Elevation 3/8" 1'-0"
3/8"
1'
SHEET #
I 4.0
HW #
HW #11
41
2
3
I 5.1
I 4.1
2
2
I 4.1
Reception Desk Computer 3' - 6 1/2"
6' - 2"
Type B Framer Door 1 Elevation 2
Zhaoyu Architect
1 I 5.1
A 5.4 -
Printer
3' - 4"
3' - 3"
Bubble T
B 21' - 4 29/32"
Accessible Counter 1
Casework 3/8" 1'-0"
DATE
19, Jul, 2
1
1
SHEET TIT
I 5.1
I 5.1
Casewo
Marble Counter Top
6' - 2"
3' - 4"
NAME
Zhaoyu
2' - 10"
Terrazzo Solid Surface
3' - 6"
SCALE
As Show
SHEET #
I 4.1
2
42
Service Side 1/2" 1'-0"
3
Work Side 1/2" 1'-0"
HW #
HW #12
2.6 Zhaoyu Architect Armstrong WOODWORKS Ceiling Panel
Bubble Tea Store
Gypsum Wall Board 3-5/8" Mtl Stud w. Glass Fiber Insulation
DATE
Vinyl Base Armstrong Conposite Vinyl Tiling 5/8" Plywood Sheathing
Terrazzo Wall Tile Vinyl Base Terrazzo
19, Jul, 2021
SHEET TITLE
Accent Wall Section NAME
Zhaoyu You SCALE
1"
1'-0"
SHEET #
I 5.0 Accent Wall Section 1 1" 1'-0"
HW #
HW #11
43
Zhaoyu Architect
Bubble T 3
Casework Perspective
4
Casework Perspective 2 3' - 4"
Solid Surface Per Schedule Blocking 1' - 7"
2' - 8 1/2"
0' - 5 1/8" 0' - 2 3/8"
Solid Surface Per Schedule 0' - 4 1/2"
1' - 7"
Heavy Duty Support Angle
Heacy Duty Support Angle DATE
5/8" Veneer
19, Jul, 2
5/8" Plywood 2' - 10"
2' - 10"
SHEET TIT
Casewo Details NAME
Zhaoyu SCALE
Cove Per Schedule Blocking
Cove Per Schedule
1/2"
1'
SHEET #
I 5.1
1
Reception Desk Section 1 1/2" 1'-0"
44
2
Counter Section 1 1/2" 1'-0"
HW #
HW #12
“Waterfalls” Paintings for decoration Mirror and Graffiti Freelances Date: 1th, Oct 2015 - 10th, Mar 2019 Teamwork
45
46
47
Thanks For Your Reading Please contact me via zhaoyu.you@the-bac.edu or (+1)781-333-7497