book
PRIEUR Camile-O Student in Landscape Architecture ENSNP France
My book
CV
LANDSCAPE PROJECT 3a :- la Vacquerie,
- St Jean d’Angely
- Chaumont sur Loire
GR AP H RE PR IC ESE N
TAT
ION
Prieur Camille-Olivier - 38 rue des chalands 41000 Blois - doncamyo@free.fr
2009
(education) 3 rd year student in landscape architecture at the National School of Higher Studies in Landscape Architecture (ENSNP), France.
2005-08
1 st and 2 nd year student at the ENSNP
2004
One year of geography studies at Aix-en-Provence university
2003
Baccalaureat STAE equivalent to A level in agronomy an environmental sciences
(work experience) 2009
A ten-weeks internship at Agence Paysages, landscape architecture agency, at Avignon, France. Work on territory projects for the Nice urban area and on the first steps of the landscapes Atlas of Burgundy.
2008
A two-months internship at the Kirstenbosh garden at Cape Town, South Africa. Work on plant adaptations an plant collections managment
2007
A one-month internship at the Otari Wilton’s bush Reserve at Wellington, New Zealand. Native forest managment, plants collection maintain and developing
2006
A two-months internship at the Ruth Bancroft Garden at Walnut Creek at Walnut Creek near San Francisco, California. Potting, maintain, plants inventory... in a botanical garden spacialized in succulents plants.
2003-05
Two-months summer jobs in a nautic sale company.
2003
A one-month and a two-weeks training period in an cereal farm at Melun near Paris, France.
(skills) Good: Photoshop, Indesign, Illustrator, Sketchup Learning: Vectorworks and Dreamweaver
s
i o l B
Project 1
: eco-urbanism
Novembre-Decembre 2008
(Diagnostic)
0
200m
1km
North
URBAN HIERARCHISATION BLOIS VIENNE TOWN
- density - medieval urbanisation - City plan
«L’entre-deux»
- transition - built mixity - built implantation heterogeneity
PERI-URBAN SPACES
- open spaces - 50’s and 60’s houses - urban and rural influences
URBAN DYNAMIC From rural spaces to an urban plan: the Blois Vienne dynamic.
EXTENSION
DENSIFICATION
(Project sketch)
«ENTRE DEUX» Du Blois Vienne urbanisé aux Grands champs, la Vacquerie devient un espace tampon.
URBAN DESIGNS SUPERPOSITION L’unité de base devient l’îlot, espace s’appuyant sur la rue et accueillant la trame verte en son sein.
ECOQUARTER: an attractive space Les activités viennent s’implanter dans des espaces clés, entre dynamiques propres au quartier et dynamiques d’agglomération.
Parkings Equipments Uses mixity built Habitation built Ecological houses plot
Open spaces for agriculture Ecological corridor, Loire Valley vegetation Public spaces Parc Family gardens
Streams: landscapes links Watery spaces
0
100
200m
(Final project) Public spaces
Parc
Green way
Zoom 1/500
Biodiversity development, environment diversity, natural spaces interactions
Activity and city equipments links the new quarter at the existant. Developping new uses.
Project 2 : St Jean d’Angely Avril 2009
(Diagnostic) Industrial spaces reconversion and city expansion in Vendee, France. Giving a new identity at St Jean d’Angely in relation at its territory and landscapes.
10O
O 5O
20O
Bâti mixte
Les commerces et la publicité comme identité de la zone d’activité
Lotissements. Espaces enclavés
Les silos sont de émergences visibles de toutes parts
Zones d’activité à vocation commerciale et industrielle Terrains sportifs. Parcelles communales
Façades de bâti sur la rue limitant la perception du territoire
Jardins familiaux.
Axes de desserte
Délaissés
Impasses
Délaissés enclavés dédiés à l’expansion industrielle
Entrées de ville. Axes majeurs
(Stakes) A CITY IN A TERRITORIAL REALITY Pénétration de la vallée de la Boutonne dans le tissu urbain Pénétrante sur l’emprise SNCF. Limiter l’effet de scisure de la voie SNCF dans le tissu urbain Affirmer les lisièrs comme espace de dialogue entre ville et vallée Influence urbaine Affirmer le canal St Eutrope comme vecteur 10O
O
20O
5O
A NEW IDENTITY Extension urbaine future Affirmer la présence des silos de la coopérative agricole dans le paysage Affirmer une nouvelle centralité Reconsidérer l’entrée de ville. Réserves foncières pour l’extension urbaine future. 10O
O
20O
5O
CITY AND VALLEY INTERACTIONS Cheminement du parc de la vallée de la Boutonne. Cheminement lié à la pénétrante sur l’emprise SNCF Cheminement à caractère plus urbain.
10O
O 5O
20O
(project)
Urban development. Existant quarter extension.
Mains streets. Old and new urban links
Streets. Urban Rhizom
10O
O 5O
20O
Family gardens.
Railway parc
Silo light scenography. New uses and evenments.
Pa pa rkin rt ag gs Ăˆs
Zo ta ne m po n
gs
in
rk
Pa
Co ag opĂˆ ric ra ole tiv e
Es sp pac or e tif
Ja fa rdin m ili s au x
TODAY
O 10O
5O 20O
Phase 1
O 10O
5O 20O
Phase 2: 20 years
O
10O
5O
20O
Phase 1
0
10
5
0
5
10
CITY LIMITS AND FARMING PARC
0
0
5
10
5
10
RAILWAY PARC: phytoremediation area
0
accumulation concentration -2- EXTRACTION -1- FIXATION
Pollutions
5
10
Lighting Project: festival internationnal des jardins de Chaumont sur Loire
Avril 2009
Graphic representation
(story board)
photography
Burgundy landscapes
photography inventory
The end
e
scap
Land
Prieur Camille-olivier
in t n tude
s
Ar
i h c
t t c e e r u