MN Assisted Living License Regulations

Page 24

Subd. 3. Survey required. For all new licensees after a change of ownership, the commissioner shall complete a survey within six months after the new license is issued. History: 2019 c 60 art 1 s 6,47 NOTE: This section, as added by Laws 2019, chapter 60, article 1, section 6, is effective August 1, 2021. Laws 2019, chapter 60, article 1, section 6, the effective date. 144G.191 ASSISTED LIVING FACILITY LICENSING IMPLEMENTATION; TRANSITION PERIOD FOR CURRENT PROVIDERS. Subdivision 1. Application limits. (a) Beginning June 1, 2021, no initial housing with services establishment registration applications shall be accepted under chapter 144D. (b) Beginning June 1, 2021, no temporary comprehensive home care provider license applications shall be accepted for providers that do not intend to provide home care services under sections 144A.43 to 144A.484 on or after August 1, 2021. Subd. 2. New construction; building permit. (a) All prospective assisted living facility license applicants seeking a license and having new construction who have submitted a complete building permit application to the appropriate building code jurisdiction on or before July 31, 2021, may meet construction requirements in effect when the building permit application was submitted. (b) All prospective assisted living facility license applicants seeking a license for new construction who submit a complete building permit application to the appropriate building code jurisdiction on or after August 1, 2021, must meet the requirements of section 144G.45. (c) For the purposes of paragraph (a), in areas of jurisdiction where there is no building code authority, a complete application for an electrical or plumbing permit is acceptable in lieu of the building permit application. (d) For the purposes of paragraph (a), in jurisdictions where building plan review applications are separated from building permit applications, a submitted complete application for plan review is acceptable in lieu of the building permit application. Subd. 3. Current comprehensive home care providers; provision of assisted living services. (a) Comprehensive home care providers that do not intend to provide home care services under chapter 144A on or after August 1, 2021, shall be issued a comprehensive home care license for a prorated license period upon renewal, effective for license renewals beginning on or after September 1, 2020. The prorated license period shall be effective from the provider's current comprehensive home care license renewal date through July 31, 2021. (b) Comprehensive home care providers with prorated license periods shall pay a prorated fee based on the number of months the comprehensive home care license is in effect. (c) A comprehensive home care provider using the prorated license period in paragraph (a), or who otherwise does not intend to provide home care services under chapter 144A on or after August 1, 2021, must notify the recipients of changes to their home care services in writing at least 60 days before the expiration of the provider's comprehensive home care license, or no later than May 31, 2021, whichever is earlier. The notice must: (1) state that the provider will no longer be providing home care services under chapter 144A; (2) include the date when the provider will no longer be providing these services; 18


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Assisted Living Requirements - Required Notices

2min
page 78

Assisted Living Bill of Rights

9min
pages 79-83

Dementia Care Licensed Facilities - Relinquishing License Requirements

2min
page 73

Assisted Living Requirements - Transfer of Resident's within the Facility

2min
page 55

Assisted Living Contracts - Required Elements

4min
pages 45-46

Assisted Living Requirements - Planned Closures

17min
pages 56-63

Assisted Living Contracts - Contract Termination - Resident Appeal Rights

1min
page 52

Assisted Living Contracts - Offer to Declare a Designated Representative

2min
page 47

Assisted Living Contracts - Contract Termination - Coordination of Move

2min
page 53

Assisted Living Contracts - Expedited Termination Requirements

3min
page 49

Dementia Care Licensed Facilities - Demonstrated Capacity in Dementia Care

2min
page 72

Innovation Variance

6min
pages 32-33

License - Order for Stay, eRvocatoin Suspension, or Nonrenewal

20min
pages 24-31

License - Controlling Individual Restrictions

2min
page 23

License - Fees

2min
page 13

License - Enforcement

2min
page 21

License - General

4min
pages 10-11

License - Provisional

13min
pages 15-20

Background Studies of Applicants Required

1min
page 14

Definitions

14min
pages 1-9
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.