1
2
3
4
5
6 1
A
3/32" = 1'-0"
Level 1.3- Recording Studios
3 3.03
Gym
STEEL ANGLE ATTACHED TO BASE OF FLOOR SAB METAL FINISH PANEL CLAMP-ON DIAGONAL BRACING AT 4' O.C.
B FINISHED CEILING GRAPPEL
C
Section Detail Top of Lobby
E
1 1/2" = 1'-0"
3/4'' DOUBLE PANE GLASS
DOUBLE PANE INSULATING GLASS STRUCTURAL SILICONE SEAL
F
3 5.01
SPACER GASKET 6 5.01 UP
CONTINUOUS VERTICAL BAFFLE W/ AIR SEAL GASKET
9 5.01
G
Open to Lobby Below
SILL TRIM
FLASHING, SEAL AND SILL STARTER SILL STARTER EXTRUSION TWIST-IN ANCHOR
H
Recording Studio
RIGID INSULATION
I
1 3.03
Recording Studio
CONCRETE BASE
J K
FOUNDATION WATERPROOFING
L
c. 936. 499. 7792 e. carballo_242@live.com a. 15735 Buggy Lane, Conroe, Texas, 77302
2.5'' MULLION W/ TYPICAL INTERNAL STEEL STRUCTURE 2
Recording Studio
Carlos Carballo Bachelors of Architecture School of Architecture University of Texas
PLASTIC MULLION LIP ATTACHMENT FOR FINISHED CEILING 2 3.03
Recording Studio
St. Elmo’s District Hotel Austin, Texas
D
FINISHED CEILING STRUCTURAL CORK PANEL SYSTEM WITH WOOD PANEL VENEER
1
Section Detail Sill 1 1/2" = 1'-0"