Tesis de maestría
New urban design and planning guidelines for Lomas settlements
The vegetal species that populate this area follows the pattern of a two main territorial processes: atmospheric condensation and rock sliding avoidance. In other words, where the wind blows the plants grow vimeo.com/279569774
La tesis reflexiona sobre la forma de crear ciudad en los ecosistemas de lomas costeras, comparando los criterios que aplican las especies vegetales y los limeños.
New urban design and planning guidelines for Lomas settlements On the other hand, villagers follow different criteria when deciding how to occupy the hillside. Land traffiking sets its criteria upon economic values, which does not consider ground conditions but materialize into abstract elements like cost effective terraces and roads. As a result, the occupied territories often face the risk of rockslides and neglect other processes like the availability of water in the atmosphere. Hence, the only way of accesing water is through unregulated water trucks services.
Una de las características de los segundos es la falta de respuesta de la trama urbana a los procesos territoriales como los flujos de detritos y a la presencia de agua atmosférica. Procesos naturales que de informar la planificación urbana puede guuiar su crecimiento de forma más inteligente: evitando espacios de alto riesgo y aprovechando las fuentes renovables de agua.
New urban design and planning guidelines for Lomas settlements
HOW DO PLANTS OCCUPY THE LOMAS TERRITORY? Through the analysis of soil type, slope gradients and atmospheric water condensation, it could be determined that vegetation tends to concentrate in areas where soil retains more humidity due to soil properties and the condensation of atmospheric water.Moreover areas with bigger slopes are avoided due to rock falling and poor soil building. Ver animación en el siguiente link: https://vimeo.com/279569774
Atmospheric h20 harvest
Mudslide+ Rockslide
Lomas cover
Topographic Swales
Vegetation distribution
https://vimeo.com/279569774
New urban design and planning guidelines for Lomas settlements
AGRICULTURAL BORDER
WATER AS AN INCENTIVE
Road Urbanism
Water Urbanism
Water infrastructure as an incentive
What if water availability is used as the main attractor and vulnerability as a discourage factor for occupying the land? Is it possible to guideinform land traffiking? How to design resillient urban systems and adaptable infrastructures that respond to such shifting conditions?
New urban design and planning guidelines for Lomas settlements
NEW URBAN GRID- NEW LANDSCAPE The process of water collection, distribution and storage, re-tooled and created new urban elements. In order to consolIdate a new attitude with its territory , the new structures visualize, previously invisible, territorial phenomena, suggesting locals the importance of the Lomas towards water availability. This utilitarian relationship is the first step towards the promotion of ecological conservation between locals.
Year 6
New urban design and planning guidelines for Lomas settlements
The Fogcatcher Belt
The wall
The stairs
THE WATER URBAN SYSTEM Three elements compose the system. Whereas the wall visualizes and mitigates rocksliding phenomena, the fog belt harvest the water and the stairs deliver it.
Year 1 ( PILOT)
New urban design and planning guidelines for Lomas settlements
500 people Block Area + streets = 12,012 m2 Floor Area = 10,140 m2
Comparison of the benefits between a traditional urban block and a water and agricultural productive one
500 people Block Area + streets = 17,693 m2 Floor Area = 4500 m2
New urban design and planning guidelines for Lomas settlements FOGCATCHMENT BELT The fogcatcher’s four planes increase the adaptability of the structure to changing wind patterns between seasons and hours. Furthermore, Its lightweight materials are designed to allow it to be dismantled when needed. The only permanent structure is its concrete foundations; hence, this allows to dismantle the mesh layers and use its foundations for other purposes like housing,etc. Regarding its allocation, each unit requires a wind tunnel analysis of the territory, placing it in the areas where the wind goes faster. Thus, microtopography and other surfaces may be placed along with it for such purpose. vimeo.com/279565488
Ver animación en el siguiente link:
https://vimeo.com/279565488 https://vimeo.com/279565488
New urban design and planning guidelines for Lomas settlements MITIGATION WALLS The gabion structure of the walls allow it to be repurposed or dismantled when needed. Despite the fact, this infrastructure responds primarily to mitigate the impact of rock slides, the modular way in which the structures are allocated allows it to be inhabited or to promote agriculture and to serve as a small pond for phytoremediation purposes. Therefore, the multifunctional aspect of this structure allows it to respond to shifting social and environmental demands. Moreover, its varied benefits allows to pay itself through the promotion of economic and services like agriculture and water treatment. https://vimeo.com/279566254
Ver animación en el siguiente link: https://vimeo.com/279566254
https://vimeo.com/279566254
New urban design and planning guidelines for Lomas settlements
Wall_Summer
Wall infrastructure in Dry Season Infrastructure is conceived as multifunctional one, being responsive to the different socioenvironmental temporalities of the territory. Thus, the landscape will be composed through the interaction between people and its infrastructure as well as informed by the dry environment visibilising controlled rock falling operations through noise and water erosion.
New urban design and planning guidelines for Lomas settlements
Wall_Summer
Wall_Winter
Wall infrastructure in Wet Season Infrastructure is conceived as multifunctional one, being responsive to the different socioenvironmental temporalities of the territory. Thus, the landscape will be composed through the interaction between people and its infrastructure as well as informed by the wet environment, visibilising the condensation of water through its materials and concavities.
Diseño y Planificación Urbana
Ubicación:Lima,Perú Cliente: Ministerio de Cultura Perú Fase: Preinversión Área: 6 ha Costo: $30,500,775
12
Masterplan y Diseño Urbano de la renaturalización del Río Rimac Area planificada: 4km2. Monto: $ 30,500,77 Desarrollado con Estudio Cordillera Sur 2019-2020
Lima, Perú
09
05
05
12
12
13
13
17
17
LAMINA
Lineamientos para el proyecto especial paisajístico Río Rímac
20
S E C C I O N 1-1, A L T U R A D E L P U E N T E B A L T A
En esta sección se muestra la intervención desde la Plaza de Acho hasta el Jirón Amazonas en el Cercado. Fuera de la Plaza se peatonaliza un tramo de la Calle Marañón como una extensión del parque existente, lugar donde se reubicará la estatua de Francisco Pizarro. Asimismo, se demolerá el puente peatonal que cruza la Av. 9 de Octubre a la altura de Acho, reemplazándolo por un cruce semaforizado a nivel de acuerdo con la propuesta del Plan Maestro del Centro Histórico de Lima. Se hará uso de barreras vegetales y taludes para proteger al parque de las vías de alta velocidad cercanas, visual y sonoramente. En la margen izquierda, se propone soterrar el espacio comercial que ocupan los comerciantes de libros y maletas, permitiendo un registro visual más amplio desde el Jirón Amazonas.
NUEVA PLAZA CON MONUMENTO A PIZARRO EN LAS AFUERAS DE LA PLAZA DE TOROS.
HUMEDAL CONSTRUIDO COMO ESPACIO DE REMEDIACIÓN DE AGUAS Y DE JUEGO
AREA COMERCIAL DE LIBREROS SOTERRADA, USANDO SU TECHO COMO EXTENSIÓN DEL ESPACIO PÚBLICO
LAMINA
Lineamientos para el proyecto especial paisajístico Río Rímac
21
S E C C I O N 2-2, A L T U R A D E L P U E N T E B A L T A
Esta sección, tomada a la altura del Puente Balta hacia el este, muestra desde la Vía de Evitamiento por el lado izquierdo hasta el Jirón Amazonas por el lado derecho. Hacia el Jirón Amazonas se plantea la reubicación de los comerciantes de maletas y libros de la zona en un equipamiento soterrado que permita la conexión visual entre la ciudad y el río. Más abajo se puede apreciar el desarrollo de la zona entre el Ferrocarril Central y el río, con una ciclovía y sendero, así como la extensión de esta franja de espacio público mediante miradores accesibles al ciudadano. Hacia la otra margen del río figuran un muro de contención y enrocado para proteger al borde del río de la erosión, y una barrera vegetal que busca acordonar la Vía de Evitamiento.
LOS MUROS DE CONCRETO SERAN REFORZADOS CON ENROCADOS EN LOS TRAMOS CRITICOS
HUMEDAL CONSTRUIDO COMO ESPACIO DE REMEDIACIÓN DE AGUAS Y DE JUEGO
AREA COMERCIAL DE LIBREROS SOTERRADA, USANDO SU TECHO COMO EXTENSIÓN DEL ESPACIO PÚBLICO
Arquitectura del paisaje
Elaboración de Perfil del Parque Bicentenario Río Rimac Area diseñada: 11 ha. Monto: $ 30,500,77 2020-2021
Lima, Perú
https://vimeo.com/642822163/799154ae64
Análisis hidráulico: Sectores expuestos a mayor caudal
Vista panorámica
Vista panorámica
Vista panorámica Humedal construido
CENTRO CULTURAL
Vista panorámica
04
05
06
07
08
Pendiente 2%
02 RÍO CAUDAL ALTO GAVIÓN TIPO A
03
GAVIÓN TIPO A
04
05 06 07 08 02
GAVIÓN TIPO A
03
GAVIÓN TIPO A
GAVIÓN TIPO A
Recubrimiento de madera tablas de madera e:3cm Escalera de concreto Gaviones con canaste metálica de proporción 1:1 y material de relleno de piedras canto rodado. (A definir con estudio hidrodinámico, de suelos y estructuras). Geotextil no tejido (A definir con estudio hidrodinámico y de suelos) Suelo compactado al 95% (A definir con estudio hidrodinámico y de suelos) Relleno de tierra compactada al 90% (A definir con estudio hidrodinámico y de suelos) Pavimento de concreto
RÍO CAUDAL BAJO GAVIÓN TIPO A
GAVIÓN TIPO A
GAVIÓN TIPO A
NIVEL DE SUELO
GAVIÓN TIPO A
EXISTENTE
GAVIÓN TIPO A
NIVEL DE SUELO EXISTENTE
D01
GAVIÓN TIPO B GAVIÓN TIPO C
GAVIONES (GRADERÍA)
GAVIÓN TIPO A
GAVIÓN TIPO A
GAVIÓN TIPO A
GAVIÓN TIPO A
GAVIÓN TIPO A
GAVIÓN TIPO A
01
10
02
12
13
01
02
03
03
04
05
06
07
08
11
09
01
04
02 03 04 05
12
06 07 08 09
Pendiente 1%
10 11
12
Sardinel de concreto Canal de drenaje de 5cm Pavimento de concreto de 20cm Tierra apisodada de 15cm Tierra existente Tubería de rebose Tubería de PVC 3" Agua tratada 50cm de profundidad Lámina antifiltrante de agua Tierra de chacra e: 30cm Lámina antiraíz Gravilla e: 20cm
13
Geomembrana
01
Pendiente 1% 05
02 03
06
04
07
05
08
06 09
07
10
08
11
09
07
10 11
Pendiente 2%
12 13
Perfil de acero e: 3mm Soldadura de cordón corrido e: 3mm Baldosa de rejillas electrosoldadas 5cmx50cm Perno metálico Sercha metálica de arriostre e: 6mm Perno de anclaje Placa de acero de anclaje con soldadura de cordón corrido e:3mm Vigueta metálica cuadrangular 5cmx10cm e: 3mm Viga de acero de 15cmx5cm e: 3mm Baranda tubular de acero d: 5cm e: 3mm Vegetación de humedal Pilar de concreto d: 30cm Zapata de concreto
13
D03 PLATAFORMA METÁLICA SOBRE HUMEDAL
12
01 02
01
02
03
04
05
06
07
08
09
10
11
03
01
04
D02
05 06
Pendiente 1%
HUMEDALES ARTIFICIALES
07 08 09 10 11 12
D05
Área perteneciente a la consecionaria del tren
04
01
02
Tierra compactada Arena de rio e: 20cm Troncos amarrados con soga Sardinel de piedra granítica Falso piso de mortero Baldosa de piedra granítica Capa de arena de asiento Cimentación corrida Capa decorativa e: 10mm Base elástica e: 30mm Losa de concreto Tierra de chacra
03
CAMBIO PAVIMENTO
01 02 03 04
2m
01
02
03
04
05
06
07
08
09
06
04 05 06 07
Pendiente 1%
08 09
Sardinel de piedra granítica Riel de tren existente Bloque de concreto armado e: 12cm Durmiente de tren existente Balasto existente Suelo compactado Cimentación corrida Baldosa de piedra granítica Capa de arena de asiento
min 30cm de la rasante del piso
06
03
D04
01
ACCESO CRUCE DE TREN A NIVEL
02 03 04 05 06
08
07
07 08 09
10
11
12
13
14
09 10 11 12 13
01
Detalle Constructivo
02
03
04
05
06
14
D00
Perfil metálico galvanizado tipo L 120x 120 e: 10mm Relleno de gravilla Tubo de drenaje PVC 3" Mulch o fibra de madera e: 10cm Tierra de chacra e: 10cm Crubresuelos a denfinir si son caminables (Grass paspalum) o no caminables (Portulaca, Oreja de Ratón) Árbol alto a definir según ubicación en el parque. Ceiba pentandra, Choloque, Tipa, Molle serrano Arbustos tipo a definir según ubicación en el parque. Chisanango, Galán de noche, Cola de Zorro, Retama. Luminaria LED Banca de concreto con tarrajeo impermeabilizado Canal de drenaje 2" Pavimento de concreto e: 20cm Tierra apisonada e: 15cm Tierra existente
VEGETACIÓN SOBRE LOMA TIPO I
07
01
PLANO:
02 03 04
Propietario:
Banca de piedra de cantera Cubresuelos a definir si son caminables (Grass americano) o no caminables (Portulaca, Oreja de ratón) Árbol alto a definir según ubicación en el parque. Ceiba pentrandra, Choloque, Tipa, Molle Serrano. Arustos tipo a definir según ubicación en el parque Chirisanango, Galán de noche, Cola de Zorro, Retama
Detalles 1
Especialidad:
PROESMIN S.A.C.
Escala gráfica:
Escala:
Arquitectura
1/250
Formato:
A0
02 04 01
Pendiente 1%
D06
PROYECTO: CREACIÓN DEL PARQUE CULTURAL BICENTENARIO RÍO RÍMAC, DISTRITO DE LIMA, PROVINCIA DE LIMA, PERÚ 03
MURO VERDE EN DEFENSAS RIBEREÑAS EXISTENTES
Tapizante de especie Portulaca aplicado en geomanta por hidrosiembra
rasante de via vehicular existente
min. 1.50m del lecho ribereño
01 02
Muro de concreto existente Geomanta de polipropileno tipo Macmat -Maccaferri e= 3mm Anclajes con perno hilti espaciados cada 2m vertical y horizontalmente
D07 VEGETACIÓN SOBRE LOMA TIPO 2
Formato
Revisión
Fecha
Dibujado:
L.F.N.CH.
31.05.2021
Revisado:
L.F.N.CH.
31.05.2021
Aprobado:
L.E.M.U.
31.05.2021
Lámina:
A09.1
Componente de paisaje del Plan Integral para el conrol de inundaciones y movimientos en masa de las cuencas de los ríos Virú, Chicama y Lacramarca” Area diseñada: 10 subproyectos de 6 ha c/u. Monto:2021-2022
La libertad, Perú / Ancash, Perú
Lacramarca_Subproyecto A2
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Pp
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Pp
Pp Pp
Pp
Cs
Cs Cs
Pp Cs
Cs
Pp Cs
Cs
Pp
Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Ti
Ti Ti Ti Ti Ti
Ti Ti
Ti Ti
Ti
Ti
Cs Ti
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs Cs Cs
Cs
Cs
Cs
Cs Cs Cs
Cs Cs
Cs
Ti
Cs
Cs
Cs
Ti
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Pp Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs Cs Cs
Cs
Cs
Cs Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Pp
Pp
Pp Pp
Cs
Cs
Cs
Cs
Cs
Cs Cs
Pp
Cs Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Pp Pp
Cs
Ti Ti
Ti Ti
Ti Ti
Ti Ti
Ti
Ti
Ti Ti Ti Ti
Ti Ti Ti
Ti
Pp
Pp
Pp Pp
Pp Cs
Pp Pp Pp
Pp
Pp Pp Pp
Pp
Pp
Pp
Cs
Pp
Pp
Ti Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti
Pp
Ti
Ti
Cs Ti
Cs Ti
Cs Cs
Pp
Cs Cs
Pp Cs Cs
Cs Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs Cs
Cs Cs
Cs Cs
Cs
Cs
Pp Cs
Cs
Cs Cs
Pp
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs Cs
Cs Cs
Cs Cs
Cs Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs Cs
Cs
Cs
Cs Cs
Cs Cs
Cs Cs
Cs Cs
Cs Cs
Pp
Pp
Pp
Pp Pp
Cs
Cs
Cs
Cs
Ti
Cs
Cs
Ti
Cs
Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs
Ti
Ti
Ti
Ti
Cs
Ti
Ti Ti
Ti
Ti
Cs
Cs
Cs
Cs
Ti
Cs
Ti
Ti
Ti
Ti
Pp
Ti
Cs Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Pp
Cs
Cs
Pp
Pp
Cs
Cs
Cs
Ti
Ti Ti
Ti Ti
Ti
Pp
Ti
Ti
Pp
Ti
Ti
Ti
Ti
Ti Ti
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Ti
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Pp
Masterplan_ Lacramarca_ Humedal Villa Maria Cs Cs Cs
Cs
Cs Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Cs
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Cs
Ti Ti
Cs
Ti
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti Ti
Ti
Cs
Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Cs
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Pp
Cs
Cs
Ti
Ti
Cs
Ti Ti
Ti Ti
Cs
Pp
Cs Cs
Ti
Ti
Ti
Cs
Cs
Ti
Ti
Ti
Ti
Cs
Cs
Ti
Ti
Ti
Ti
Cs
Ti
Cs
Ti Ti
Cs
Ti
Cs
Ti
Ti
Ti Ti
Ti
Cs
Cs
Ti
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Pp
Cs
Cs
Ti Ti Ti Ti Ti
Cs Cs
Cs Cs
Cs
Cs
Cs
Pp
Ti Ti
Ti
Cs
Ti
Ti
Cs
Cs
Cs
Cs Cs
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Pp
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Pp
Ti Ti Ti Ti
Ti
Ti
Pp
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti
Cs
Ti
Cs Cs
Cs
Cs
Cs
Cs
Pp
Cs
Ti
Ti
Ti
Cs
Cs
Ti
Ti
Cs
Cs
Cs
Cs
Cs
Ti
Ti
Ti
Cs
Cs
Cs Ti
Cs
Cs
Cs
Cs
Pp
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Ti
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Ti
Ti
Ti
Ti
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Ti
Ti
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Ti
Ti
Ti
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Ti
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Ti
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Cs
Ti
Ti
Ti
Ti
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Ti
Cs
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Pp
Pp
Pp
Ti
Ti
Ti
Cs
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Cs
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Cs
Ti
Ti
Ti
Ti
Ti
Cs
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Cs
Ti
Ti
Ti
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Pp
Pp
Cs
Pp Pp Pp
Pp
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Pp
Pp
Cs
Pp
Pp Pp
Pp
Pp Pp
Pp
Pp
Cs
Pp
Cs
Cs
Cs Cs
Cs
Pp
Pp
Cs Cs Cs Cs Cs Cs Cs Cs Cs
Cs Cs
Cs
Pp
Cs
Pp
Pp Pp
Ti
Pp
Cs
Pp
Ti
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti Ti
Ti
Pp
Ti Ti
Cs Cs
Ti
Ti
Cs
Cs
Pp
Pp Pp
Ti
Ti
Pp
Pp
Pp
Pp
Pp
Pp Ti
Pp Ti
Ti
Pp
Ti
Ti
Pp
Pp Pp
Pp
Pp
Pp
Pp
Pp Ti
Pp
Pp
Pp
Cs Cs Cs
Pp
Cs
Cs
Cs
Cs
Cs Cs
Cs
Pp
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Cs
Pp
Cs
Cs
Cs
Pp
Pp
Cs
Cs
Ti
Cs
Cs Cs Cs
Cs Cs Cs
Cs
Pp
Cs
Cs
Ti Ti
Cs
Ti
Ti
Cs
Ti
Ti
Cs
Ti
Ti
Cs
Ti
Cs
Ti Ti
Cs
Cs Cs Cs
Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Pp
Cs
Cs Cs
Cs Cs Cs Cs
Cs Cs Cs
Cs
Pp
Cs Cs Cs
Pp
Cs Cs
Cs
Ti
Ti
Ti
Ti Ti
Ti
Ti Ti
Cs Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs Cs
Pp
Cs
Cs Cs
Cs Cs Cs Cs
Ti
Cs
Ti Ti
Cs
Ti
Cs
Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti Ti Ti
Cs Cs Cs Cs
Pp
Cs Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs Cs
Cs
Cs
Cs
Ti
Ti
Ti
Ti
Ti
Cs Cs Cs
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Cs
Ti
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti
Pp
Cs Cs Cs Cs Cs Cs Cs
Cs
Cs
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Cs
Ti Ti Ti
Ti
Ti
Ti
Cs
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti Ti
Ti
Ti
Ti Ti
Ti Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti
Pp
Cs Cs
Ti Ti Ti Ti
Ti
Ti Ti Ti
Ti Ti
Ti Ti
Ti Ti
Ti Ti Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti Ti Ti
Ti Ti
Ti
Ti
Ti Ti
Ti
Ti Ti Ti
Ti
Ti Ti
Ti
Ti
Cs
Pp
Cs Cs
Ti
Ti
Ti
Cs
Ti
Ti Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti Ti Ti Ti
Ti
Ti
Ti Ti Ti Ti
Ti
Ti
Ti Ti Ti
Ti
Ti
Pp
Ti
Cs
Cs
Ti Ti
Ti
Pp
Ti
Ti
Ti
Ti
Ti
Ti Ti
Cs
Cs Cs
Ti Ti
Ti
Ti
Ti
Cs
Cs Cs
Ti Ti
Ti
Pp
Cs Cs
Cs
Ti Ti
Ti Ti
Ti Ti
Ti Ti
Cs
Cs Cs
Cs
Cs Cs
Cs Ti
Ti
Ti
Pp
Pp Pp
Pp
Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs
Ti
Ti
Cs
Cs Cs
Cs Cs
Cs Cs
Cs
Cs Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs Ti
Ti
Ti
Cs
Cs
Ti Ti
Ti
Cs
Ti
Ti
Cs
Ti
Cs
Ti Ti
Ti
Cs
Ti
Ti
Cs
Cs Cs
Cs Cs
Cs Cs Cs
Cs Cs
Cs
Cs Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs Cs
Cs
Pp
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs
Cs Cs
Cs
Pp
Pp
Pp
Pp
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti Ti
Ti
Ti
Ti
Pp
Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Pp
Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti Ti
Ti Ti Ti
Ti Ti
Ti
Ti Ti
Ti Ti Ti
Ti
Ti Ti
Ti
Ti
Ti Ti
Ti
Ti Ti
Ti
Ti Ti
Ti
Ti
Ti
Ti
Ti
Ti
Ti Ti
Ti
Ti Ti Ti
Ti
Ti
Ti
Ti
Pp
Ti
Ti Ti
Ti Ti
Terraza Inundable, Carabamba, Viru.
Detalles Constructivos
Componente de paisaje del Expediente técnico Santuario de la Memoria Ayacucho Area diseñada: 6 ha m2. Monto:2021
Ayacucho, Perú
PLANO GENERAL:
ARQUITECTURA:
ANTONIO GRAÑA, JUAN CARLOS ZAPATA. LUIS MARTIN PICCINI, PAULO TUBINO, CGGMS+AWAQ ESTUDIO+ESTUDIO SHICRAS ESTRUCTURAS:
GALLEGOS, CASABONNE, ARANGO, QUESADA. INGENIEROS CIVILES S.A.C. Av. REPÚBLICA DE COLOMBIA 671, Of. 801 SAN ISIDRO LIMA, PERÚ ELÉCTRICAS:
MELANIO QUEZADA
& INGENIEROS ASOCIADOS C.I.P. Nº 49894 Av. PARQUE DE LAS LEYENDAS 240, Of. 403 SAN MIGUEL LIMA, PERÚ SANITARIAS:
ROBERTO PAIN PERALTA INGENIERO SANITARIO C.I.P. Nº 14079
CALLE PEDRERÍAS 145 2° PISO URB. MARANGA SAN MIGUEL LIMA, PERÚ
NOTAS:
Pp_5m_
Pp_5m_
Pp_5m_
Pp_5m_
Av_8m_
Pp_5m_
Sm_10m_
Pp_5m_
Pp_5m_
Pp_5m_
Sm_10m_
2741.50 2741.00 2741.00
Sm_10m_
Av_8m_
Al_2m
Sm_10m_ Ep_3m_
Cs_3m_
Cs_3m_
Mm
Al_2m
Mm
Mm
Al_2m
Cs_3m_
Al_2m
Sb_4m_
Al_2m
Mm
Mm
Mm
Sb_4m_
Cs_5m_
Mm
Al_2m
Al_2m
Cp_3m_
Pp_5m_
Pr_12m_
Al_2m
Ep_3m_
Al_2m Pr_12m_
Al_2m
Pr_12m_
Al_2m
Ng_6m_
Sb_4m_
Ep_3m_
Al_2m Pr_12m_
Al_2m
Al_2m
Ep_3m_
Pr_12m_
Al_2m
Al_2m
Pr_12m_
Cs_3m_
Pp_5m_
Al_2m
Cs_5m_
Ep_3m_
Cp_3m_
Cs_3m_
Al_2m
Al_2m
Mm
Mm
Al_2m
Ep_3m_
Al_2m
Mm Mm
Al_2m
Sm_10m_
Av_8m_
Of_5m
Pr_12m_
Cp_3m_
Cs_5m_
Cp_3m_
Pr_12m_ Of_5m
Pr_12m_
Ng_6m_
Pr_12m_
Of_5m
Of_5m
Pr_12m_
Cs_5m_
Ng_6m_
Pr_12m_
Cp_3m_
Pr_12m_ Pr_12m_
Cp_3m_
Cp_3m_
Av_8m_
Cp_3m_
Of_5m
Pr_12m_
Av_8m_
Cp_3m_
Av_8m_ Cs_3m_
Of_5m
Pp_12m_
Of_5m
Pr_6m
Ep_3m_
Al_2m
Al_2m
Al_2m
Of_5m
Of_5m
Al_2m
Al_2m
Al_2m Al_2m
Al_2m
Mm
Mm
Of_5m
Of_5m Of_5m
Mm
Of_5m
Mm
Mm Mm
Of_5m
Pr_6m
Ep_3m_
Pa_8m_
Of_5m
Pr_6m
Pr_12m_
Cs_5m_
Cp_3m_
Sm_10m_
Al_2m Mm
Al_2m Al_2m
Mm Mm
Of_5m
Mm
Of_5m
Mm
Cs_5m_
Cs_3m_
Cp_3m_
Al_2m
Al_2m
Al_2m
Al_2m
Al_2m
Mm
Mm
Of_5m
Ng_6m_
Of_5m
Of_5m
Pr_6m
Pp_12m_
Mm
Mm
Cs_3m_
Al_2m Al_2m
Ng_6m_
Mm
Mm
Of_5m
Mm
Sb_4m_
Sb_4m_ Al_2m
Pr_12m_
Am_12m_
Ep_3m_
Ep_3m_
Al_2m
Al_2m
Am_12m_
Al_2m Al_2m
Sb_4m_
Cs_5m_
Al_2m
Al_2m
Ep_3m_
Cs_5m_
Ng_6m_
Pa_8m_
Cs_3m_
Al_2m
Ep_3m_
Al_2m
Of_5m
Al_2m
Al_2m
Al_2m
Cs_3m_
Pp_12m_
Pr_12m_
Al_2m
Ep_3m_
Ep_3m_
Al_2m
Pr_12m_
Al_2m
Al_2m
Cp_3m_
Cp_3m_
Al_2m Ep_3m_
Al_2m
Cs_3m_
Al_2m
Ep_3m_
Sb_4m_ Sb_4m_
Al_2m Pr_12m_
Al_2m
Pr_12m_
Cs_3m_
Ng_6m_ Cp_3m_
Ng_6m_
Ep_3m_
Ep_3m_
Ep_3m_
Al_2m
Cp_3m_
Cp_3m_
Cs_5m_
Al_2m Ep_3m_ Ep_3m_ Pr_12m_
Cp_3m_
Of_5m
Al_2m
Cs_3m_
Al_2m Ep_3m_
Al_2m
Sb_4m_ Cs_5m_
Sb_4m_
Av_8m_
Ep_3m_
Al_2m
Al_2m
Cs_3m_
Al_2m
Al_2m
Al_2m
Cs_5m_
Pp_5m_
Cs_3m_
Sb_4m_
Ng_6m_
Sb_4m_Sb_4m_
Sb_4m_ Al_2m
Cp_3m_
Of_5m
Al_2m
Al_2m
Sb_4m_ Sb_4m_
Al_2m
Cs_5m_
Al_2m
Cp_3m_
Pp_5m_
Cp_3m_
Cs_5m_
Ng_6m_
Cp_3m_ Cp_3m_
Mm
Mm Mm
Cs_5m_
Sm_10m_
Al_2m
Ng_6m_
Sb_4m_
Ng_6m_
Mm
Mm
Mm Mm
Mm Mm Mm
Sb_4m_
Cs_5m_
Mm
Mm
Mm Mm
Mm
Mm
Mm
Al_2m Al_2m
Ng_6m_ Sb_4m_
Av_8m_
Av_8m_
Cp_3m_
Cs_3m_ Cs_3m_ Ng_6m_
Cs_3m_ Cs_3m_
Pr_6m
Mm Mm
Al_2m
Mm
Ep_3m_ Al_2m Mm
Mm
Mm
Mm
Al_2m
Al_2m
Ep_3m_
Mm
Mm
Of_5m Of_5m
Mm
Cs_3m_
Of_5m
Mm Mm Mm
Mm
Of_5m
Of_5m Of_5m Of_5m
Pp_5m_ Of_5m
Sm_10m_
Sm_10m_
Sm_10m_
Of_5m Of_5m
Pr_6m
Sm_10m_ Sm_10m_
Sm_10m_
Sm_10m_
Sm_10m_
Sm_10m_
Mm Mm Mm Mm Mm
Mm
Mm
Mm
Mm Mm Mm
Mm Mm
Mm
Sm_10m_
Mm
Mm Si_0.80m_
Si_0.80m_
Si_0.80m_
Si_0.80m_
Si_0.80m_
Si_0.80m_ Si_0.80m_
Al_2m
Sm_10m_
Al_2m
Al_2m
Si_0.80m_ Si_0.80m_
Mm
Ep_3m_ Mm
Sm_10m_
Si_0.80m_
Ep_3m_ Mm
Si_0.80m_
Si_0.80m_
Si_0.80m_
Si_0.80m_ Si_0.80m_
Si_0.80m_
Si_0.80m_
Si_0.80m_
Si_0.80m_
Si_0.80m_
Si_0.80m_
Si_0.80m_
Of_5m
Al_2m
Ep_3m_
Si_0.80m_
Si_0.80m_
Si_0.80m_
Mm
Mm Mm
Mm
Si_0.80m_
Si_0.80m_
Of_5m
Mm
Si_0.80m_
Si_0.80m_
Si_0.80m_
Al_2m
Mm Mm
Mm
Mm Mm
Mm
Mm Mm
Mm Mm Mm
Mm Mm
Pp_5m_ Mm
Mm Mm
Mm
Mm Mm
Mm Mm Mm
Mm Mm
Mm
Mm
Mm Mm
Mm
Mm
Mm Mm Mm
Mm
Mm
Sm_10m_
Mm
Mm
Mm Mm Mm Mm Mm Mm
Mm Mm Mm Mm Mm
Mm
Mm
Sm_10m_
REV. N°
FECHA
DESCRIPCION
PROPIETARIO: Mm
Mm
Mm Mm
Mm
Mm
Mm Mm
Mm
Mm
Mm
Mm Mm Mm
GOBIERNO REGIONAL DE AYACUCHO
Mm Mm
Mm Mm
Pp_5m_ Mm Mm Mm Mm Mm
Mm Mm
JR. CALLAO N° 122, HUAMANGA AYACUCHO - PERU TEL: (511) 066-317567
Mm
Mm
Mm
Mm Mm
Sm_10m_
Mm
Mm
SELLO:
Of_5m
Al_2m
Av_8m_
Pp_12m_
Pp_12m_
Av_8m_
Al_2m
Al_2m
Al_2m
Cs_3m_
Pp_12m_
Sb_4m_
Cs_3m_
Pp_12m_ Ng_6m_
Al_2m
Pp_5m_
Cs_3m_ Cs_5m_
Cs_5m_
Cs_5m_
Ng_6m_
Cp_3m_
Sb_4m_
Cp_3m_
Cp_3m_
Cs_3m_
Sm_10m_
Pa_8m_
Ng_6m_
Cs_5m_
Ng_6m_
Sb_4m_
Sb_4m_
Sb_4m_ Cs_5m_
Av_8m_
Ng_6m_ Sb_4m_
Cp_3m_
Cs_5m_
Sm_10m_
Cs_3m_
Cs_5m_
Cp_3m_
CONSULTOR:
Al_2m
Cs_5m_
Cs_5m_
Sm_10m_
Pa_8m_
Cs_3m_
Pa_8m_
Sm_10m_
Av_8m_
Cp_3m_
Sb_4m_
Sb_4m_ Sb_4m_ Ng_6m_
Sb_4m_
Sb_4m_ Cp_3m_
Sb_4m_ Ng_6m_
Sm_10m_
Av_8m_
Cp_3m_
Al_2m
Cp_3m_
Ng_6m_
Cs_5m_
Cp_3m_ Pr_12m_
Pa_8m_
Al_2m Al_2m
Cs_3m_
Al_2m
Sm_10m_
Cs_3m_ Cs_3m_
GALLEGOS, CASABONNE, ARANGO, QUESADA. INGENIEROS CIVILES S.A.C.
DISEÑADO POR: DIBUJADO POR:
-------
REVISADO POR:
------
-------
PROYECTO:
MEJORAMIENTO Y AMPLIACION SANTUARIO DE LA MEMORIA LA HOYADA EN EL DISTRITO DE ANDRES AVELINO CACERES PROVINCIA DE HUAMANGA DEPARTAMENTO DE AYACUCHO DIRECCION:
LA HOYADA, ANDRÉS AVELINO CÁCERES AYACUCHO - PERU PLANO:
MASTER PLAN
ESPECIALIDAD:
PAISAJISMO FECHA:
N°REVISION:
PROYECTO:
ESCALA:
FASE:
PLANO:
08/2021
14877-20
INDICADA PROYECTO
MASTER PLAN
ESPECIALISTA RESPONSABLE:
CARLOS ESPINOZA BARDALES PEDRO MENDOZA AVILA PRISCILLA CRUZ NUÑEZ
Masterplan LAMINA:
P-01
Vista panorámica
Detalles constructivos
Análisis de escorrentía superficial natural
Retención de humedad en taludes y protección ante erosión pluvial
Paisaje de drenaje: epoca de lluvias
Paisaje de drenaje: estiaje
Paisaje de drenaje: epoca de lluvias
Simulación y diseño urbano
Territorial wind tunnel analysis and Green Infrastructure strategies for the Nueva Ciudad de Olmos
Área: 845 ha
The New City of Olmos is a governmental initiative for allocating the migration of labor force to work the new agricultural fields in the Northern peruvian dessert. This is achieved
Según la 23vabusca valorización de la obra de vialidad del mes para de Mayo, control la constructoraarenamiento invierte S/.453,387.54 en produce en la zona y no El análisis eólico de la Nueva Ciudaddue de que se toOlmos an engineered wateridentificar transfer project intervenciones that promotes the expansion of el the agricultural de frontier over the coastal dessert. However, the problem is that the urban development mantenimiento de of vias (limpieza de arenas), para garantizar su operabilidad. did not contemplated the eolic deposition sand over the highways, detering its operation and increasing its maintenance budget. permite la correcta operación de la infraestructura vial. Al respecto se empleó el software autodesk ecotect con el plugin Winair para modelar las areas donde el viento acelera y potencialmente erosiona las dunas de arena. Tras identificar as zonas expuestas, se identificaron estrategias de reforestación y de buffer verde. La primera para prevenir la erosión y la segunda paraDEPOSICION capturar lasEOLICA particulas en suspensión DE VIENTOS
Territorial wind tunnel analysis and Green Infrastructure strategies for the Nueva Ciudad de Olmos
Los análisis de la velocidad del viento también pueden visualizarse segun su vector de orientación. Dicha información es útil para poder dilucidar la posible trayectoria de la arena en suspensión. Por otro lado, si el mismo proceso se aplica con la volumetría de los edificios diseñados se pueden incorporar nociones de control de vientos o su promoción para mejorar el comfort térmico y eólico de la ciudad.
Territorial wind tunnel analysis and Green Infrastructure strategies for the Nueva Ciudad de Olmos
STEP 3: FORESTATION Once the vulnerable areas to wind action where identified, the vegetative buffer were deployed along with the areas for dune fixation.
1
3
1. Colocación de barreras de madera y/o ramas de poda, formando planos perpendiculares a la direccion promedio del viento, promoviendo la interceptación y precipitación de los sedimentos en suspensión. 2. Construcción natural de dunas tras la acumulación progresiva de arena.
2
3. Fijación de las dunas y protección ante la erosión a través de vegetación xerófita nativa
NUEVA CIUDAD DE BELEN
Nuevo sistema de drenaje pluvial para la nueva ciudad de Belén Ubicación: Iquitos, Perú Cliente: Ministerio. de Vivienda Perú Fase: Preinversión Área: 49.2 ha Costo: $50, 778,156
Diseño urbano pre-existente c
b
Escorrentia Superficial
a
Topografía
Isometría de análisis de las distintas capas territoriales que entran en conflicto. (a) Topografía, (b) Escorrentía superficial
Trazado Urbano El diseño de la Nueva Ciudad de Belény (c) donde se reubicará a la población afectada por el desborde del rio Itaya se vió afectada por un mal diseño del sistema de drenaje, exponiendose a la inundación pluvial. Antedeello, se que identifican los espacios donde El proyecto consistió en diseñar un sistema drenaje mitigue el riesgo de inundación plu- la escorrentia natural se acumuvial de la nueva ciudad, la cual estaba en la fase de inversión y presentando deficiencias en el anála, canalizandola hacia un sismtea de lagunas y parques públicos. Transformando el peligrro en un espacio recreativo inundable, conservando lisis del drenaje natural del terereno. Por ello, se diseño una alternativa al drenaje convencional, la memoria e identidad de los iquiteños. denominado SUDS ( Sistema Urbano de Drenaje Sostenible) consistiendo en el diseño de la dis-
posición de jardines de lluvia y humedales construidos que se adapten a la propuesta planteada
[ RAIN GARDEN ]
Overflow Riser @ 88’
+90 +87
Compact Structural Fill 2-3” Wood chips or Rock Mulch PVC pipe Sand Base Tami Banh - Carlos Espinoza
Pea Gravel River-run Gravel 0
5’
Humedal Subsuperficial para depuración de rios urbanos Lurin-Lima
Construcción de Humedal subsuperficial
Empleo de vetiver en Humedal subsuperficial y resultados
Docencia
UPC_ Gestión Urbana: Seguridad en el espacio público
UPC_ Gestión Urbana: Seguridad en el espacio público
PUCP_ Laboratorio de Urbanismo: Arquitectura del Paisaje multiescalar.
PUCP_ Laboratorio de Urbanismo: Arquitectura del Paisaje multiescalar.
PUCP_ Laboratorio de Urbanismo: Arquitectura del Paisaje multiescalar.
PUCP_ Laboratorio de Urbanismo: Arquitectura del Paisaje multiescalar.
UPC_ Taller 7: Casa del Adulto Mayor.
UPC_ Taller 7: Casa del Adulto Mayor.