SCOPE

Location

CEA were employed to launch the ‘Dual Penetrator’ a 12m long twin hulled catamaran. The project involved the transportation of the catamaran from the boat builder’s yard to Ocean Marina Yacht Club some 40 kilometres away. The project would include three separate lifts.

Rayong, Thailand Chonburi, Thailand Duration 1 Day Catamaran Specifications Width 6.9m Length 12m Height 4.5m Height inc. Trailer

PROCEDURE

4.9m

Two CEA 50 ton cranes working in tandem were used to lift the catamaran, the boat was lifted from its cradle on to four fibre glass support stands. Upon removal of the cradle a CEA multi-axle trailer reversed under the boat, wood chocks and rubber matting were put in place, the trailer was raised and took the weight lifting the boat from its support stands.

Weight 11t Equipment/Services Used 50 Ton crane x 2 Multi axle hydraulic trailer

The trailer and cargo made the short journey across the boat yard to prepare for the second lift. The cranes lifted the boat over the fence and placed it again on four support stands. As before the hydraulic trailer reversed under the boat and took the full weight. After the boat was strapped and secured it made the 40km journey to the marina launch site with the aid of a police escort to ensure safety for all road users.

Hiab truck Spreader beams Slings Ratchet straps Tag lines Police escort

CASE STUDY Dual Penetrator Launch

CS003 1/2

DUAL PENETRATOR CATAMARAN LAUNCH

DUAL PENETRATOR CATAMARAN LAUNCH


Upon arrival at the launch site the cranes were positioned on the marina wharf ready for the 3rd and final lift. All necessary slings and shackles were attached to the boat and the final lift began. The cranes lifted the boat up and over the marina barriers and carefully lowered her into the water. A few nervous moments followed as builders, designers and more importantly the owner of the boat waited to see if she floated. CEA are happy to say that the boat sat perfectly in the water and all involved were relieved and very happy with the outcome.

SLINGS ATTACHED AT THE LOAD POINTS

DUAL PENETRATOR CATAMARAN LAUNCH

CEA HYDRAULIC TRAILER LIFTS THE BOAT

BOAT MAKES IT WAY TO THE LAUNCH SITE

CEA CRANES LIFT THE BOAT INTO THE WATER

CEA PROJECT LOGISTICS 41/13 M1 AO-UDOM ROAD TUNGSUNGKHLA SRI RACHA CHONBURI 20230 THAILAND +66 38 354 019 T HE BOAT TOUCHED WATER JUST AFTER SUNSET

www.ceaprojects.com

CASE STUDY Dual Penetrator Launch

CS003 2/2


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.