SCOPE
Location
CEA Project Logistics were employed to receive 83 pieces of break bulk cargo from Khao Hin Son, Thailand. The cargo would be consolidated at the CEA cargo consolidation facility in Laem Chabang and preapred for load out at Laem Chabang Port. The cargo consisted of oil refinery parts bound for Mongla, Bangladesh.
Laem Chabang, Thailand Duration 5 Days
CEA PROVIDED
• Man power • Cranes, reach stacker, forklifts • Cargo consolidation lay down area • Lifting equipment as neccessary • Trucks, trailers, specialised trailers • Transportation from Laem Chabang - LRT • Supervise load out operation • Port communication, wharfage and handling
As of 2011 Laem Chabang port became the 22nd busiest container port in the world. Much of the international shipping reaching Thailand goes through Laem Chabang OIL REFINERY LADDER SECTION
CASE STUDY Break Bulk Consolidation
CS008 1/2
BREAK BULK CONSOLIDATION
BREAK BULK CONSOLIDATION
CARGO IN THE CEA CONSOLIDATION AREA
CARGO LOADED AND PREPARED FOR PORT
CARGO ARRIVES AT LAEM CHABANG
All tarpaulins used in this project are manufactured onsite at the CEA plastics facility in Laem Chabang Thailand
BREAK BULK CONSOLIDATION
LADDER SECTIONS ARRIVE
A CONVOY OF CEA PRIME MOVERS ARRIVE AT LAEM CHABANG PORT
CEA REACH STACKER UNLOADS THE CARGO
UNLOADING AT LAEM CHABANG PORT
CARGO COVERED WITH TARPAULIN
CARGO PREPARED FOR LOADING AT PORT
CEA PROJECT LOGISTICS 41/13 M1 AO-UDOM ROAD TUNGSUNGKHLA SRI RACHA CHONBURI 20230 THAILAND CARGO LOADED ONTO THE TWIN DECKS
CARGO SECURED IN THE SHIPS HOLD
+66 38 354 019 www.ceaprojects.com
CASE STUDY Break Bulk Consolidation
CS008 2/2