TECH TIPS —

Installation of GIB HandiBrac® Developed in conjunction with MiTek®, the GIB HandiBrac® has been designed and tested by Winstone Wallboards for use in GIB EzyBrace® elements that require hold-downs. The GIB HandiBrac® with BOWMAC® blue head screw bolt is suitable for timber and concrete floors constructed in accordance with NZS 3604:2011. The use of the GIB HandiBrac® provides quick and easy installation. As the bracket is fitted inside the framing this allows a flush surface for the wall linings. There is no need to check in the framing as is recommended when fitting conventional straps. The use of the GIB HandiBrac® allows for installation and inspection at any stage prior to fitting internal linings. It is suitable for both new and retrofit construction. For more information refer to the GIB® Site Guide, at www.gib.co.nz/site-guide-and-install/ or call the GIB® Helpline 0800 100 442.

Preparation and installation tips

Installation

• Use a 10mm diameter masonry drill bit for a solid concrete substrate and an 8mm diameter drill bit for fixing to a timber sub-floor.

1. Correctly position the GIB HandiBrac® to suit the sub floor (refer GIB® Site Guide (2018) pp 63) 2. Install the hex screw (see red circle above) located in the bracket base when it is in the required position.

• Drill a hole into the base material to depth 8mm deeper than the required embedment and clean out the hole of dust and debris prior to installation of BOWMAC® screw bolt.

3. Insert the blue bolt through the GIB HandiBrac® into the hole and begin tightening the bolt by applying forward pressure when engaging the first thread.

• Use a quality hexagonal socket with a ratchet spanner.

4. Additional forward pressure may be required for installation in high strength, dense base materials.

• During installation debris or dust created by the thread cutting action may cause some resistance to be experienced. This is easily overcome by unscrewing the BOWMAC® screw bolt for one turn or more and then continuing to fix to the full embedment.

5. Continue tightening the anchor until the head is firmly seated against the GIB HandiBrac® base. In extremely dense material, use of an impact wrench is recommended. 6. Be sure the bolt is at the required embedment depth. 7. Install remaining four screws into the face of the timber stud. 8. The installation is now complete.

This Tech Tip was brought to you by Cath Montgomery, Product Manager for Winstone Wallboards. Winstone Wallboards is a NZCB Partner and New Zealand’s only manufacturer and largest marketer of gypsum plasterboard, drywall systems, associated products and services. For more information visit www.gib.co.nz or call 0800 100 442.

57


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

NEWS BITES

5min
pages 60-61

Installation of GIB HandiBrac®

2min
page 59

Ensure your site is safe during the winter months

2min
page 56

Site Safe and Massey University investigate stress in construction

2min
page 57

Designing cavity sliders for access and usability

2min
page 58

Meet our NZCB Presidents

8min
pages 51-52

97% of builders report discomfort or pain at work

2min
pages 54-55

Message from the AST Trust

1min
pages 48-49

Golf tournament raises $10K and helps keep steam train rolling

1min
page 50

Auckland builder turned YouTube sensation

4min
pages 38-39

Recognising our members

5min
pages 36-37

New online tool to find out if building consent is needed

1min
pages 26-27

Ditching your negative self-talk

3min
pages 30-31

Ways to reduce over thinking

2min
page 29

Are you an ‘Ant’ or a ‘Grasshopper’?

4min
page 28

Be brave: it’s time you embraced tech

3min
pages 22-23

Employees vs independent contractors and increased sick leave entitlements

4min
pages 24-25

More amendments to the Building Act

5min
pages 20-21

Putting our partners in the spotlight

2min
page 16

What is a 10-Year Building Guarantee?

3min
page 10

Submissions open for REVERE Volume 5

2min
page 17

Prioritising GIB® plasterboard waste minimisation and recycling

2min
pages 18-19

Message from the Chief Executive

1min
pages 6-7

Message from the NZCB Board

3min
page 4

Message from Technical and Education Manager

3min
pages 8-9

NZCB brings something special to the small screen

3min
pages 12-13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.