NZCB Building Contracts New Zealand Certified Builders (NZCB) have several Building Contracts available, depending on the type of project being undertaken, for Business members to complete online or order in hardcopy form. Below is a breakdown of the different contracts available. Preliminary Services

Fixed Price+

This contract is used where the builder has been asked to do some preliminary work in connection with a proposed building project, either prior to the project commencing, or as part of a feasibility study to determine if the project will go ahead.

This contract is used when an aspect [or all] of a project has a quoted element to it. Should there be variations to the quote then this contract allows for flexibility while still maintaining payment security. The deposit is held by the builder during construction and balanced at the time of final invoice.

Small Works and Alterations – for projects $30,000 and under

Cost & Mark-Up

This contract is used where the building work is expected to be of such short duration that the builder will only need to invoice the owner once. The builder has the option to select whether the works will be charge up or a fixed quote. Where multiple invoices and payments are contemplated a more comprehensive contract is recommended.

This contract is used when the total price payable for the building work is not fixed, specified, or known at the time of entering into the contract. Instead, the progress payments and the final contract price are to be calculated by reference to the actual costs incurred by the builder in carrying out the building work, plus a margin for the builder’s administration, overhead and profit.

Spec Build (hard copy only)

Renovations (Fixed Price + or Cost & Mark-up)

This contract is used when the builder is building a spec home and when the builder: • owns the land on which he is building something; and • sells the land to someone before he is finished building.

This contract is similar to the standard building contract except for three main differences: 1. First, the builder only gets possession of that part of the building he is working on. 2. Secondly, the owner always takes out the contract works insurance. 3. Thirdly, if you are charging on the basis of having reached defined stages of completion of the works, those stages have been left blank so that you can fill them out to fit the requirements of the project.

These terms should NOT be used when: • the builder intends to sell the land and commence building work after settlement; or • the builder has completed the building work. It doesn’t matter whether the builder hasn’t even started building yet e.g. he has sold off the plans, or whether he only has a few weeks to completion.

Labour Only (Fixed Price + or Cost & Mark-up)

Portable Building/Prefabricated Building Component (hard copy only) This contract is used where the building work carried out by the builder will result in a portable building (whether temporary or permanent), or building component, that will be relocated from the construction site to another location, on the completion of such portable building/building component. This contract is intended to be used whether the builder is only responsible for the construction of the portable building/ building component or is also responsible for any (or all) of the transportation, installation and site works associated with the relocation of the portable building/building component.

10

This contract is used when the overall management of the project (including the procurement of the materials, the hiring of the contractors, and the coordination of their activities on-site) is being performed by the owner or a specialist project manager appointed by the owner such as an architect, engineer or another builder. The contract allows for the supply of incidentals (low value) and variation rates and margins are also agreed upon. Samples of the above contracts can be downloaded for free from the Sample Building Contracts tab under the Building Contracts section of the NZCB members’ only Toolshed www.nzcb.nz/members/building-contracts/ Unsure of which contract to use? Contact the NZCB National Support Office on 0800 237 843.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

IN THE MEDIA

29min
pages 70-73

NZCB Strategic Partners and Affinity Partners

1min
page 74

NEWS BITES

11min
pages 62-65

Air seals around windows – getting it right matters

2min
pages 66-67

Introducing the new GIB® System Selector

1min
pages 68-69

RoVE update #3

3min
page 60

NZCB and Industry Events Calendar

3min
pages 58-59

Apprentice Challenge bench seat finds special home

2min
page 57

A close finish in the Waikato/Coromandel

2min
page 56

Meet our 2022 NZCB Presidents

2min
pages 54-55

Keeping your worksite safe this flu season

3min
pages 52-53

Your business’ health starts with its people

6min
pages 50-51

The Tortoise beats the Hare

4min
pages 48-49

Impressive effort leads to awesome achievement

2min
page 46

Managing finances through tough times

6min
pages 44-45

Gemma the scooter raises a record $9,300 for Cancer Society

7min
pages 38-41

Immigration NZ’s employer accreditation

3min
pages 42-43

Leadership and management

3min
pages 36-37

Can councils transfer some or all of their liability to the builder?

7min
pages 28-29

Busy? Now’s the time to market your business

4min
pages 26-27

NZCB and Noel Leeming Commercial

4min
pages 22-23

A real look into the 2022 employment market

3min
pages 24-25

Understanding provisional tax

4min
pages 34-35

You must pass the ball to win the game

2min
pages 30-31

Make tech a powerful, everyday tool in your business

6min
pages 32-33

Walking the talk at Auckland’s Asian Construction Expo

1min
pages 20-21

NZCB Building Contracts

3min
pages 12-13

Want to improve your business performance?

2min
page 11

Don’t get caught short with your insurance cover

3min
pages 16-17

Message from our Chief Executive

3min
page 8

Message from the NZCB Board

4min
pages 4-5

South Island gets a new office

1min
page 18

Message from our Education and Technical Manager

3min
page 10

Putting our partners in the spotlight

2min
page 19
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.