LUChen_WorkSample_2020_updated

Page 1

Professional Work 2015-2020

LEED Green Associate cl6ys@virginia.edu (+1) 437-988-3365

LU Chen Urban Planning / Design


LU Chen

LEED Green Associate

cl6ys@virginia.edu

EXPERIENCE Urban Strategies Inc. Toronto, Canada Urban Designer/ 2019.03- 2020.05

Sheridan Campus Master Plan I worked as a core designer in the master plan process, with the ability to come up with design solutions for the future 30 years of development in all three campuses of Sheridan. In support of the design strategy, I was able to do research independently in enrolment and GFA growth, collect and visualize the data while providing insightful findings to reveal the urgent growth needs of the institution. Pickering Place Block Development Plan (36 acre) Served as a core designer, I worked around with the land-locking condition of the site by providing design schemes with strong understanding of local design guidelines and market reality. Under a time-sensitive workframe, I was able to work long hours to prepare final deliverables with the highest graphic standards while being responsive to the team and client. Seneca Markham Campus Development Plan (22 acre) Served as a chief designer, I successfully prepared and delivered three design scenarios with balanced solutions for the instituion and the market demand. With a strong grasp of the local planning policies, I was able to explore options using multiple methods (sketch, to-scale hand drawing and ArchiCAD) in a timely manner.

SNC-Lavalin/ ATKINS Shanghai, China Urban Designer/ 2017.08-2019.03

Qingdao West Coast CBD Conceptual Planning (~1,000 acre) I served as an urban designer for business precinct schematic design in the massive land development. I produced and managed urban design components, supervised multi-media presentation for the final deliverables. Xingfeng Cement Plant Redevelopment Planning & Urban Design (268 acre) With the challenge of historic structure preservation and new community development, I worked as an urban designer in site analysis, site schematic design and final deliverables. I possessed the ability to visualize the site condition using multiple methods, create alternative reuses of the old structure and supervise multi-media presentation. Liberty University Campus Master Planning (700 acre)

VMDO Architects Charlottesville, VA, USA Urban Designer / 2015.06- 2016.06

As a junior urban designer, I was in charge of master plan document management, responsible for precinct landscape deisgn, diagrams and locator maps making, housing+ parking quantitative analysis and physical model making.

EDUCATION University of Virginia 2013.08- 2015.05

Master of Urban Design School of Architecture, Charlottesville, VA, USA

Soochow University 2008.09- 2013.06

Bachelor of Urban Planning and Design School of Architecture and Urban Environment, China

AWARDS

SKILLS ArchiCAD AutoCAD SketchUP Rhinoceros Hand Drawing

Illustrator Photoshop InDesign PowerPoint ArcGIS

ONLINE PORTFOLIO URL:

ASLA Virginia Chapter Merit 2014 James River Viewshed Study, University of Virginia Outstanding Graduation Design 2013 Team leader, one of 3 students awarded in class of 41 students National Student Urban Design Competition-Third Prize 2012 Team leader of Soochow University Team

https://issuu.com/chenlu7/docs/luchen_worksample_2020_print_6cfc43ddb874d1


Campus 1 Sheridan Master Plan

West Station 6 Qingdao TOD Conceptual Plan

GTA, Canada

2 Pickering Redevelopment

Appx.

Shandong, China

Sketches in Paris

8

France

Pickering, Canada

3 Seneca Scenario

Taiting Historical District Redevelopment

Markham, Canada

Liaoning, China

Paris 2017 Seoul Tokyo 2018 2013

Portland 2016 San Francisco 2014 New Orleans 2015

Appx.

Bangkok 2017

Toronto 2019 Washington D.C. 2013-2016

University 4 Liberty Master Plan Virginia, USA

Design Notes Texas+Louisiana

Sanlin Urban Design

7 Street Guideline Shanghai, China

Xingfeng Cement Plant

5 Urban Redevelopment Henan, China

LEED Green Associate cl6ys@virginia.edu (+1) 437-988-3365

LU Chen Urban Planning / Design


High-Density Block

Landmark Building Commands: Loft+Sweep

Low-Density Block

Conventional Modelling Method

Hotel

Residentce+Research

Stadium Software Rhinoceros-based workflow

Master Plan Design

Landmark +Floor Level

Graphic Presentation

Parametric Urban Design Practice Turner Field Stadium Neighborhoods Master Plan, Atlanta, USA

With strong understanding of conventional measurements in North American urban practices, I use Rhinoceros+ Grasshopper for complex built form modeling, labelling and visualization.


A

B

C Generative Modelling Method

Use Grasshopper for advanced parametric design practice. The outcome of the study can be applied to design option and schematic design phases.

A Generative Block Massing+Tower Placement

Solar System Modelling

B

Shadow Impact Visualization

C

Real-time Dashboard Display


To-Scale Hand Drawing

Sheridan Campus Master Plan Greater Toronto Area, Canada Area: 100 acre (Trafalgar Campus) Date:2019-2020

Main Responsibilities

The complex setting of Sheridan offers a unique opportunity to explore and envision the pysical growth of campuses in the next 30 years. From initial campus analysis, public engament, to the final deliverables, I worked as a core designer supporting and leading the design consultation process.

* Campus Growth Analysis+ Visualization * Facilitate Open Houses+ Meetings * Master Plan Schematic Design * Master Plan Document Preparation * Data Management + Visualization

Dundas Street West

Ninth Line

Trafalgar Road

e Creek Mil en xte

HWY 403

Uptown Core

Si

Upper Middle Road Trafalgar Campus

Dor

val D

rive

QEW

Oakville GO

Downtown Oakville Lakeshore Road East

Lake Ontario Figure 1.1.

Regional Context

Campus Context Map// Illustrator

CHAPTER 1 | MASTER PLAN PURPOSE, GOALS AND VISION

5

N 0

0.25

0.75

1.5km


1

PHASE 1 Project Initiation & Scoping Stakeholder interviews

2

PHASE 2 Analysis of Existing Conditions Campus Compass Launch Students/Faculty/Staff Ideas Workshop Students/Faculty/Staff

3

PHASE 3 Establishing Long-Term Vision Framework Open House Students/Faculty/Staff/External Stakeholders

4

PHASE 4

5

PHASE 5

Enrollment Growth

Establishing Long-Term Vision Framework

Finalize Campus Master Plan

Evolution of Space Needs

A series of data-driven studies of the existitng condition reveal the urgentness of growth in all three Sheridan campuses. With a strong understanding of the personality of each campus and the interrelationship between programmes, the master plan process involved extensive consultation with the campus community, various stakeholders and the broader community. This broad- based consultation process was essential to develop a Master Plan rooted in the Sheridan community’s vision for the future.


deta

Primary Access Streets The Primary Access streets will support and enhance the physical access and arrival on campus. They include a re-aligned Ceremonial Boulevard which maintains the existing intersection at Trafalgar Road and a proposed new signalized intersection mid-way between Ceremonial Boulevard and Sheridan College Road. Both streets will accommodate multi-modes of transportation and allow safe connections for both pedestrians and cyclists onto campus.

Section C-C

As shown in Section C-C, these roadways will be designed to accommodate three vehicular lanes, two for travel and one for left turning. On street parking is not contemplated on Primary Access Streets as the overall block length is short and results in insufficient vehicular stacking distances. Bike lanes will be located on both sides of the street and elevated from the roadway for added safety. Cycling infrastructure within these streets will be a key part of the overall active transportation network linking future cycle routes planned for Trafalgar Road through the Primary Access Streets and to a multi-use trail along the Morrison Creek Valley edges.

Figure 3.26.

80

Illustrative Master Plan 2 days// ArchiCAD,Illustrator, Photoshop Section C-C

Generous building setbacks and planting zones will allow an attractive streetscape setting appropriate for arrival on campus permitting sufficient space for mature trees to grow and enhance the tree canopy. Rows of street trees will frame key The Master Plan provides the framework for longviews into campus and compliment new development along Trafalgar with a natural setting. term transformation, creating a renewed and re-

Trafalgar Short Term Plan (Present-15 yrs)

Infrastructure

markable setting for learning, teaching and working.

1. Transit hub 2. Complete ring road 3. East-west connection to Trafalgar

Development

The campus setting will be enhanced through the development of new buildings that are thoughtfully designed to offer exceptional academic environments.

4. Student hub & mixed-uses 5. Interactive arts/cultural hub and associated faculties 6. Partnership buildings along Trafalgar 7. Facilities building and service yard

Public Realm Improvements 8. Student commons open space 9. Surface Parking Expansion

New and enhanced open spaces will leverage ex3.27. isting natural features and create thoughtfullyFigure designed places for active and passive recreation. 86

PART 3 | TRAFALGAR MASTER PLAN

Street Section // Photoshop


ail gesinthat the pages follow. that follow. Sheridan College Drive

Sheridan College Drive

Ceremonia l Rd

3.17. CONNECTIVITY, CONNECTIVITY, MOBILITY AND MOBILITY PARKING ANDFigure PARKING

Sheridan College Drive

Sheridan College Drive

Athletics, Facilities and Parking

Academic Core Precinct

Figure 3.18.

RAFALGAR PARTMASTER 3 | TRAFALGAR PLAN MASTER PLAN Master Plan Components//

Illustrator Trafalgar Long-term Plan

(15-25 yrs)

New: ~ 99,000 m²

PARTNERSHIP: ~34,000m² (34%)

8.

4.

6. 3.

Net Existing Campus Total Net New (m²)

~31,000

Total Partnership Use Parking New

Removed Net Total

Short Term (Present- 15 years) Demand

New: ~ 88,000 m²

5.

GCA m2 ~65,000 ~34,000 ~113,000 ~178,000

Demolished

2.

1.

INSTITUTIONAL: ~65,000m² (66%)

Institutional Use Only New

(25+ yrs)

Yields

3,200

INSTITUTIONAL: ~65,000m² (74%)

PARTNERSHIP: ~23,000m² (26%)

Demolished Net Existing Campus Total

9.

Net New (m²)

~79,000 m2 Stalls 1,850 600 2,100 3,950

Institutional Use Only New

6.

Total Partnership Use Parking New

Phasing Strategy// Illustrator, Photoshop

GCA m2 ~65,000 ~10,000 ~168,000 ~233,000 ~55,000 ~102,000 m2

Net Total

Stalls 1,100 900 3,050 4,150

Demand

4,100

Removed

Medium Term 15-25 years)

Morrison Creek Valley

Figure 3.19. USE PRECINCTS USE AND PRECINCTS BUILT FORM AND BUILT FORM

Figure 3.18.

Trafalgar Medium Term Plan Yields

Partnership Precinct Ceremonia l Rd

Road

Road

Morrison Creek Valley

Trafalgar

Trafalgar

ACEOPEN NETWORK SPACE NETWORK

Partnership Academic Precinct Core Precinct Ceremonia l Rd

Ceremonia l Rd

Road

Ceremonia l Rd

Sheridan College Drive

Long Term 25+ years)

Road

Figure 3.16.

Trafalgar

Figure 3.16.

Athletics, Facilities and Parking

7.

Ceremonia l Rd

Road

AND STREETS BLOCKSAND BLOCKS

Sheridan College Drive

Ceremonia l Rd

Trafalgar

Trafalgar

Road

Ceremonia l Rd

Sheridan College Drive

Trafalgar

Sheridan College Drive


LE

L VA M

AR YF

City Hall

AD RO E

ES

PL

A

N

A

D

E

N

Esplanade Park

TH

DRAFT FOR DISCUSSION

1 The Block in the City Centre Pickering Place Block Development Plan Pickering, Ontario, Canada “Pickering City Centre will be a vibrant, sustainable, accessible and distinct city centre for all people and all seasons. It will be a place to inspire, a place to gather, a place to work, and a place to live, all in a compact and walkable environment� - City Centre Urban Design Guidelines

THE

M AD RO

The Block

A EN

GL AR

NN OA RIN G

PA R

KW AY

D

Pickering City Centre

S

AR YF

GO Station, this is the preeminent location in the City for intensification. A comprehensive approach to planning at the block scale and greater attention to urban design and connectivity can ensure that the intensification is appropriately designed and phased for the community.

There is an opportunity here to demonstrate excellent In 2018, the City announced a new vision for the City Centre which would see the creation of a brand new, vibrant, sustainable, accessible, city-building to transform this block of the City and bustling downtown from what is core currently a blank slate. The City engaged in extensive public engagement with residents, businesses and community partners toCity build the new vision for intensifying theguidelines. Centre in accordance with policy and City Centre. The approved City Centre Urban Design Guidelines and implementing City Centre Zoning By-law 7553/17 will bring this vision Located within 800m of the Pickering GO Station, this is to life. The Urban Design Guidelines are intended to guide decisions with respect to development proposals in the City Centre in terms of built the preeminent location thespaceCity for A form, streetscapein and open design. The City intensification. Centre Zoning By-law incorporates new development standards to regulate the size, location, massing and height of buildings, and identified minimum and maximum comprehensive approach to planning at the block scale density provisions. The CAPREIT contain approximately 10.4 acres in size, with four and greater attention toLandsurban design and connectivity 5-storey and one 6-storey walk-up buildings containing 326 rental housing units and a daycare facility located adjacent to lands owned by can ensure that the intensification is appropriately dethe City south of The Esplanade and across from lands owned by the Pickering Town Centre. In thinking about the long term potential of the Lands, therecommunity. is an opportunity to work with the City to create a signed and phasedCAPREIT for the comprehensive block development plan.

ADE

LAN

ESP

E LL VA

The City Centre is the planned heart and soul of the City The City Centre is the planned heart and soul of the City of Pickering. PTC, City City Lands and CAPREIT lands comprise 36 acres at the core of Pickering. The The PTC, Lands and CAPREIT lands of the City Centre. There is an opportunity here to demonstrate excellent to transform this core block of the City Centre in accordance comprise 36 acrescity-building at the core of the City Centre. with City policy and guidelines. Located within 800m of the Pickering

PIC KE

Area: 36 acre Date:2019.06-07

City Owned Land CAPREIT Owned Land Rockport Group

5


ectivity for

d cyclists, as rk connects with nd the proposed es within the block. and mid-rise

Block Context 2 days// Illustrator

DRAFT FOR DISCUSSION

DRAFT DRAFT FOR FOR DISCUSSION DISCUSSION

DRAFT FOR DISCUSSION

2.3 2.3Block BlockDevelopment DevelopmentPrinciples Principles 6 1. 1. Create a comprehensive block plan that fits within the context of the Create a comprehensive block plan that fits within the context of the City City Centre Centre Sitting Sitting at at 1111 acres acres within within thethe City City Centre Centre and and within within 800m 800m of of thethe Pickering Pickering GO, GO, thethe CAPREIT CAPREIT Lands Lands and and adjacent adjacent City-owned City-owned Lands Lands areare currently currently underutilized. underutilized. Comprehensive Comprehensive planning planning and and urban urban design design forfor thethe entire entire development development block block willwill ensure ensure thatthat thethe plan plan fitsfits within within thethe City City Centre Centre context. context. Intensification Intensification of of thethe block block willwill bebe consistent consistent with with thethe increasing increasing amount amount of of growth growth and and development development occurring occurring within within thethe City City Centre. Centre.

Block Development Principles

2.2. Integrate Integrate the the block block within within itsits surrounding surrounding context context TheThe CAPREIT CAPREIT Lands Lands currently currently contain contain four four 5-storey 5-storey and and one one 6-storey 6-storey walkup walkup apartment apartment buildings buildings with with surface surface parking parking lotslots located located to to thethe rear rear of of thethe buildings. buildings. TheThe lack lack of of active active street street presence presence and and large large surface surface parking parking lotslots leaves leaves little little forfor thethe block block to to engage engage with with thethe surrounding surrounding neighbourhoods. neighbourhoods. Rethinking Rethinking thethe contextual contextual relationships relationships between between thethe block block and and its its surroundings surroundings willwill help help to to create create a vibrant, a vibrant, mixed-use mixed-use community. community.

3. Create efficient development blocks while creating connectivity for pedestrians, cyclists and vehicles

4.

A fine-grain network of streets and blocks should be created to allow for pedestrians and cyclists, as well as vehicles, to move efficiently and comfortably through the block. The road network connects with the adjacent OPB Realty Inc. proposed road network to the east. The two new streets and the proposed pedestrian mews create new safe, accessible and orderly connections and meeting places within the block. The street network creates block sizes that can accommodate building typologies of tall and mid-rise buildings.

Establish a

A high quality of publ enjoy. The public realm recreation, shopping a parking structures with The “Glenanna Gatew Official Plan.

DRAFT DRAFT FOR FOR DISCUSSION DISCUSSION

The Esplanade S

Retail Retail Frontage Frontage Open Open Space Space Frontage Frontage Residential Residential Frontage Frontage

4.

Establish a high level of public realm design and open space networks

1. Create a comprehensive block plan that fits within the context of the City Centre A high quality of public realm and parks will help to create publicly accessible spaces for the community to enjoy. The public realm at ground level should be planned as a place that encourages passive and active recreation, shopping and mingling while also providing protection from the elements. Atop above grade parking structures within the courtyards of buildings are green spaces that can be enjoyed by residents. The “Glenanna Gateway Park” creates a new park in the City Centre in keeping with the provisions in the Official Plan.

Active At-Grade

5.5. Appropriate Appropriate tower tower placements placements toto minimize minimize shadows shadows and and provide provide appropriate appropriate transition transition

Meeting Node

Boulevard/Prom

Major Vehicular Road

Bike Lane

Pedestrian Connection

Mews

6.6. Allow Allow for for a phased a phased approach approach that that responds responds toto current current and and future future needs needs

2. Integrate the block within its sur- 3. Create efficient development blocks rounding context while creating connectivity for pedestrians, cyclists and vehicles 1111

TheThe placement placement of of towers towers onon thethe block block should should provide provide appropriate appropriate transition transition to to adjacent adjacent neighbourhoods neighbourhoods 2 and and limit limit shadow shadow impacts impacts onon thethe Esplanade Esplanade Park. Park. Tower Tower floor floor plates plates areare limited limited to to 800 800 m2mwhich which creates creates shadows shadows thatthat pass pass faster faster maximizing maximizing sunlight sunlight in the in the public public realm. realm. Towers Towers areare strategically strategically located located to to provide provide interesting interesting views views from from keykey locations locations within within thethe City City Centre. Centre.

Development Development onon thethe CAPREIT CAPREIT Lands Lands and and contiguous contiguous City-owned City-owned Lands Lands willwill occur occur in phases in phases over over several several 12years. years. TheThe layout layout of of development development blocks, blocks, streets streets and and public public spaces spaces should should allow allow forfor a number a number of of construction construction phases. phases. TheThe development development of of Phase Phase 1 will 1 will create create new new rental rental buildings buildings allowing allowing forfor thethe decanting decanting of of existing existing rental rental properties properties prior prior to to demolition. demolition. Public Public realm realm improvements improvements willwill bebe included included in every in every phase. phase.

The Esplanade South Active At-Grade

Visual Visual Corridor Corridor

Boulevard/Promenade Bike Lane Mews

4. Establish a high level of public realm design and open space networks

**

Proposed Proposed Tower Tower OPB OPB Proposed Proposed Tower Tower

5. Appropriate tower placements to minimize shadows and provide appropriate transition

6. Allow for a phased approach that responds to current and future needs 1313


of il, nt to

sa f 2.0 C of Block

es from y-law ntages oad.

DRAFT FOR DISCUSSION Illustrative Master Plan

Performing Arts Centre

2 ST

STRE

ET 1

THE ESPLANADE S 6 ST

Block D

35 ST

GLEN

STREET 3 6 ST 2 ST

6 ST

6 ST

25 ST

6 ST

8 ST 6 ST

30 ST

8 ST 9 ST

Block E

Block H

6 ST

25 ST

3 ST

15 ST

ANNA

40 ST

9 ST

ROAD

2 ST

Block I

OAD

25 ST

3 ST

6 ST

40 ST

MEW S

ET 2

9 ST

Block C

Block B Block A

8 ST

8 ST

Block F

Block G

30 ST

15 ST

15 ST

20

50

6 ST

8 ST Melaniewe have the net FSI provided with AY and without parking, the with parking is KW AR GP N I ER the inforcePICKZBL and the without parking would represent the PTC proposed definition. Should we include both?

N

0

8 ST

100m

18

Site Development Statistics Site Area(㎡)

GFA(㎡)

Block A Block B Block C Block D Block E

4,845 2,890 2,497 4,073 4,809

Tower 25,004 / / 6,804 /

Podium 12,721 9,053 7,715 10,489 16,128

Townhouse / / / 747 1,545

TOTAL GFA 37,725 9,053 7,715 18,040 17,673

Block F

14,916

21,114

43,197

2,554

66,865

Block G

7,260

24,682

19,547

1,859

46,088

Block H (park) Block I (mews) TOTAL Site Road Open Space

2,685 1,309 45,284 53,000 7,716 3,994

/ / 77,604

/ / 118,850

/ / 6,705

/ / 203,159

Tower Information* 35ST (106.5m) / / 15ST (46.5m) / 15ST (46.5m) 25ST (76.5m) 15ST (46.5m) 30ST (91.5m) / /

Unit*

Net FSI

Parking*

w/o Parking 7.8 3.1 3.1 4.4 3.7

Overall FSI

w/Parking w/o Parking 9.2 / 3.1 / 3.1 / 4.8 / 4.0 /

Parking Type

w/parking / / / / /

377 91 77 180 177

405 95 82 196 223

669

824

4.5

5.1

/

/

1below+1above

461

564

6.3

7.6

/

/

1below+3above

/ / 2,032

/ / 2,389

/ /

/ /

/ / 3.8

/ / 4.4

/ /

* At-grade has a floor-to-ceiling height of 4.5m; other floors have floor-to-ceiling height of 3m * Residential unit size is considered as 100 ㎡/unit * Parking space size is considered as 35 ㎡/space; The exact parking space number needs to be multiplied by 0.8

1below+3above 1 below 1 below 1below+1above 1below+1above

FARM R

8 ST

9 ST

STRE

6 ST

6 ST

6 ST

2 ST

VALL EY

Library


DRAFT FOR DISCUSSION Performing Arts Centre

2 ST

STREE

T1

THE ESPLANADE S 6 ST

T2

3 ST

6 ST

35 ST

Block D

35 ST

8 ST

9 ST

15 ST

STREET 3

6 ST

25 ST

30 ST

6 ST

6 ST

8 ST

8 ST

8 ST

6 ST

30 ST

8 ST

Block F

Block G

8 ST

8 ST

To create a diversity of housing forms, townhouses were included in the block plan. The townhouses will be 3-storeys and will wrap structured parking to create active street life.

8 ST

25 ST

6 ST 2 ST

6 ST

Block H

GLEN ANN

ST

Block E 8 ST

15 ST A RO AD

2 ST

3 ST

Block I

OAD

Block A 40 ST

STREE

Six towers are proposed on the block. They are strategically placed to be setback from the Esplanade South to mitigate shadow impacts on the Esplanade Park. The tallest tower is at 35 storeys and is placed near the Esplanade South and Glenanna Road intersection to create a gateway into the community. Tower heights range from 15 to 35 storeys to provide visual interest in the skyline. The tower floorplates will not exceed 800m2 to enhance sunlight penetration and sky views to and from surrounding streets creating a greater sense of privacy.

Block C

Block B

MEW S

The majority of the buildings on the block will be residential with some at-grade retail in towers, mid-rise and townhouse forms, some of which will function as a building base or podium for a taller tower. The block will include a mix housing ownerships in rental and condos to provide options for future residents. Mid-rise buildings range from 6 to 8 storeys to create a consistent streetwall and provide adequate podium sizes. Retail ground floor heights within mid-rise buildings will be generous with a high degree of transparency to connect outdoor and indoor spaces, creating visual interest for pedestrians.

6 ST

6 ST

8 ST

8 ST

FARM R

2 ST 9 ST

VALL EY

4.4 Built Form

6 ST

30 ST

15 ST

15 ST

8 ST

15 ST

15 ST

8 ST

6 ST

D

8 ST N

ING

ER

DRAFT FOR DISCUSSION 0

K PIC

Performing 50 Arts Centre

20 2 ST

AY KW

6 Storey Mid-rise 8 Storey Mid-rise Tower Townhouse

R PA

100m

Built Form 21

STREE

T1 6 ST

Block C

Block B Block A

Block D

ROAD

2 ST

15 ST

STREET 3 6 ST 2 ST

Block H 6 ST

The design of the private courtyards will create useable space for residents with planting, landscape and seating areas. Courtyards will be designed to ensure the spaces have clear sightlines and lighting to ensure safety through the day.

25 ST

6 ST

8 ST

8 ST

8 ST

Block F

Block G

30 ST

A hierarchy of open spaces that includes a public park, mews and private courtyards creates a range of passive and active recreation spaces.

6 ST

6 ST

30 ST

8 ST

6 ST

Melanie- we have the net FSI provided with and without parking, the with parking is the inforce ZBL and the without parking would represent the PTC proposed definition. Should we include both? VALL

GLEN

ANNA

ST

Block E

RM R

9 ST

The new streets and pedestrian mews break up the development blocks to create movement, provide porosity and flow throughout the block. North south connections through the block connects the community up to City Hall and south to Pickering Parkway to connect to the GO station. The north south road is planned to be a woonerf to highlight the notion of streets as places as well. Streetscaping improvements will add to the public realm enhancing the quality of the neighbourhood. Mid-block connections through Block D and E create a walkable neighbourhood and provide important porosity to the Esplanade Park. East west connections provide enhanced mobility through the block, this street in particular providing bike lanes.

3 ST

Block I

MEW

35 ST

S

T2

3 ST

6 ST

40 ST

STREE

OAD

8 ST

9 ST

The proposed open space system will create a new series of connections and spaces for enjoyment for the community. A new park fronting onto Glenanna Road will create a bridge between the proposed development on the Pickering Town Centre Lands and the CAPREIT Lands. This park will meet the parkland dedication requirements as prescribed by the City of Pickering.

6 ST

6 ST

6 ST

2 ST

EY FA

4.3 Open Space System

15 ST

15 ST

8 ST

6 ST

8 ST

AY KW

N

0

20

Site Area(㎡)

20

GFA(㎡)

Block E

4,809

Tower 25,004 / / 6,804 /

Block F

14,916

21,114

Podium 12,721 9,053 7,715 10,489 16,128

Townhouse / / / 747 1,545

TOTAL GFA 37,725 9,053 7,715 18,040 17,673

43,197

2,554

66,865

50

Glenanna Gateway Park Private Courtyard The Enhanced Esplanade Pickering Promenade Pickering Place Boulevard Mews

AR GP

RIN

KE

PIC

Site100m Development Statistics Tower Information*

Unit*

Open Space System

Net FSI

Parking*

w/o Parking 7.8 3.1 3.1 4.4 3.7

Overall FSI

w/Parking w/o Parking 9.2 / 3.1 / 3.1 / 4.8 / 4.0 /

Setting efficient development blocks creates Block A up an 4,845appropriate set of streets and 35ST (106.5m) 377 405 Block B 2,890 / 91 95 a base that can support good urban design. The Block Plan is representative of Block C 2,497 / 77 82 D 4,073 15ST (46.5m) 180 196 keyBlock design moves that provide for the community: / 15ST (46.5m) 25ST (76.5m) 15ST (46.5m) 30ST (91.5m) / /

45,284 53,000 7,716 3,994

77,604

118,850

6,705

203,159

1below+3above 1 below 1 below 1below+1above 1below+1above

177

223

669

824

4.5

5.1

/

/

1below+1above

564

6.3

7.6

/

/

1below+3above

/ / 2,389

/ /

/ /

/ / 3.8

/ / 4.4

/ /

• Improved mobility through creating a network of streets Block G 7,260 19,547 1,859 46,088 461 • Enhanced open24,682 space opportunities Block H (park) 2,685 / / / / / • Generous development Block I (mews) 1,309 / / block / sizes / / TOTAL Site Road Open Space

Parking Type

w/parking / / / / /

2,032

* At-grade has a floor-to-ceiling height of 4.5m; other floors have floor-to-ceiling height of 3m * Residential unit size is considered as 100 ㎡/unit * Parking space size is considered as 35 ㎡/space; The exact parking space number needs to be multiplied by 0.8


Seneca College Context Map

Seneca Campus Development Scenarios Markham, Canada Area: 22 acre Date:2020.02

Regulatory Framework Review Provincial Policy Statement

Growth Plan for the GGH

York Region Official Plan

City of Markham Zoning Review ZBL 165-80

ZBL 28-97

General Development Standards

Parking Standard

ZBL

2004-202 Post Secondary School use

City of Markham Official Plan Business Park/ Office Priority Employment /Greenways

M.C. (75%) – Select Industrial with Limited Commercial

Areas & Site Specific Policies 9.20 Woodbine/404 Mixed Use key development area


Two scenarios are developed for future The following assumptions are common: intensification of the Markham Campus based on • 500 parking spaces will be required for the existing building (250 for Seneca College, 250 for a future tenant on floors 7-10) our analysis of the site’s land use and physical surroundings, our policy and zoning review, and • Parking ratio for office uses is 4 / 1,000 sq ft insights from Cushman & Wakefield regarding the • All parking will be provided in surface lots; Structured parking marketability of various employment uses. is assumed not to be economically feasible •

Option 1: Low-Rise Office Campus

Option 2: Low-Rise Office + Student Residence

Development Scenario

o

Seneca Way would provide vehicular access to all future properties, with easement agreements covering shared private streets/driveways and required utility corridors

Option 2: Low-Rise Office + Student Residence Overview This option combines low-rise, condominium office buildings with a 6-storey student residence building containing 500 beds. Based on recent precedents at other Canadian institutions, it is assumed the residence would be privately operated, with suite-style units of 3-5 bedrooms and approximately 450 square feet of gross floor area per student.

Development Scenario

Option 2: Low-Rise Office + Student Residence

o

Future Vehicular Access

Height (st)

11

he

g

GFA

m2

be ly

m2

NLA (90% GFA)

Use

ft2

Height (st)

Parking Required Stalls

Option 2 also may require upgrades to portions of The Seneca Way to Floors Garden-6 College accommodate additional traffic, internal intersections and11 general 17,454 187,870 250 Floors improved 7-10 TBD Total streetscape 5,712 enhancements. 61,480 New Buildings 250 23,165

2 3 2 3

Buildings

ft2

249,350

Existing Building

Building A

Office

2

500

Building B Office 3 Two new3,600 shared private38,750 streets through3,240 the existing parking lot would be 34,875 Building C Office 2 140 5,400 58,125 52,313 lots (B and C) 209 from needed to provide access to parking on4,860 the newly created Building D Student Residence 6 3,600 38,750 3,240 34,875 140 The Seneca for5,438 these roads should by City 6,042Way. The cross-sections 65,035 Total 58,532 be guided 234 200,661 16,778 180,595 722 standards18,642 for local streets.

GFA

NLA (90% GFA) ft2

17,454

187,870

250

5,712 23,165

61,480 249,350

250 500

3,600 5,400 3,600

m2

Parking Required

m2

ft2

Stalls

38,750 58,125 38,750

3,240 4,860 3,240

34,875 52,313 34,875

140 210 140

20,856

224,497

18,771

202,047

125

33,456

360,122

30,111

324,110

615

y

This option demonstrates the potential to develop a low-rise office campus with four additional office buildings of two to three storeys, with office units in each building sold as condominiums.

This option combines low-rise, condominium office buildings with a 6-storey student residence building containing 500 beds. Based on recent precedents at other Canadian institutions, it is assumed the residence would be privately operated, with suite-style units of 3-5 bedrooms and approximately 450 square feet of gross floor area per student.


Digital Model making- rendering 2 weeks// SketchUP, Rhino, Maxwell

Liberty University Master Plan Lynchburg, Virginia, USA

Online Report: https://issuu.com/chenlu7/docs/lu_master_plan_030116_print

Area: 283 ha (700 acre) Date:2015-2016

Liberty University became a big client for VMDO since 2014, from the library to freedom tower design, the master plan document was expected to be a finale to show future developments on the campus. I worked closely with senior associate and consultants (VHB, KWLS etc.)on multiple tasks, which including landscape design, master plan scheme design and graphic documents preparation. This experience offered a good scope to understand how campus planning works in an “untypical� way.

Locator Maps 2 weeks// ArcGIS, Illustrator

* master plan document management * precinct landscape design * diagram making * physical model making * housing+parking quantitative analysis


Campus Infographics 1 week// Illustrator

Locator Maps 1 week// Google Earth, Illustrator


Physical model making 2 month// AutoCAD, 3-D Printing

Precinct Design & Diagrams 1 week// Illustrator

Campus Section Design 1 week//Illustrator, PhotoShop


Precinct Landscape Design 1 week

Illustrative Master Plan 4 weeks//AutoCAD, Illustrator, InDesign, PhotoShop, ArcGIS


Illustrative Master Plan 3 days// SketchUP, PhotoShop

XINGFENG CEMENT PLANT REDEVELOPMENT Pingdingshan, Henan, CHINA Area: 108.69ha (268 acre) Date: 2018

Industrial plant delivers unique image and memory in real estate market in China, developers have shifted their focus from excessive expansion to regeneration and redevelopment for a better quality. As an key role in the design team, I am capable of drafting planning schemes and think more deeply in the interaction of historical and new, keep or repurpose, while understand the demand of stake holders.

Perspective Section Design// Photoshop,Illustrator


Existing Condition Analysis // Photoshop,Illustrator


* master plan scheme design * historical building survey & repurpose * office space design & layout * client meeting presentation * diagram making

Facade Design // SketchUP, Photoshop,Illustrator

Analysis Diagram // SketchUP, Photoshop,Illustrator

Perspective Section Design // Photoshop,Illustrator


Explosive Axon // SketchUp, Photoshop,Illustrator


Illustrative Master Plan 3 days// SketchUP, PhotoShop

Qingdao West Station TOD development Qingdao, Shandong, CHINA Area: 400 ha (988 acre) Date: 2018

The project provides a vision for Qingdao West Railway Station Area. The station front axis is considered as a spine for the whole area, where is designed into four major function districts. I was involved with design concept and visualization process.

Planning Structure // Illustrator


* planning structure making * master plan precinct design * diagram making * planning document making

Core Program // SketchUp, Photoshop, Illustrator

Street Section // Photoshop,Illustrator


Overall Layout

总体布局

Illustrative Master Plan 3 days// SketchUP, PhotoShop

6

4

4

9 1 2

3

3

4

4

4

4 1

三林湾

2

海派风貌湾区

3

文萃大道

4

海派生活街区

5

三林活水公园

6

体育休闲绿地

7

小黄埔江生态休闲绿地

8

堆山公园

9

幼儿园

5

8

02 总体规划结构

0

100

200

三林滨江南

Overall Planning Structure

Sanlin Southern Rive

500M

Sanlin Urban Design Street Guideline Shanghai Style

打造多元的海派风貌分区

海派风貌的溯源、继承与发展 20

21

海派风貌分层控制要素

Shanghai, CHINA Area: 108.69ha (268 acre) Date: 2016-2017

建筑式样 风貌协调区

• • •

建筑风格 材料与色彩 细部要求

新江南社区

Sanlin project provides a fusion of new watertown style and modern “shanghai style“(海派) .To achieve this vision, design guideline is well needed. My role is to create a detailed streetscape design for the main roads in the area. I carefully studied typical street life in old French Concession in Shanghai, researched on PlanNYC, Boston Complete Streets and NACTO Urban Street Design Guide to align my design with best practices in the world. I worked closely with senior urban designers to craft a series of new modes of streets and created distinguishing characters in each street. 海派风貌湾区

品质生活社区

海派风貌小镇

滨江风貌区

风貌协调区

0

100

200

1843年

溯源

江南水乡 江南民居

街宽比例 建筑界面 植载铺地

新江南社区

海派风貌湾区 传承

新里 石库门

海派风貌 核心精华

开埠,后,海派文化开始 兴起、繁荣

花园里弄 花园洋房弄 公寓里弄 公寓 当代 1949年

品质生活社区

风貌协调区

海派文化面临创新

地区特色空间 • • • •

广场 绿廊 商业街区 亲水景观

溯源

江南水乡文化之基底

旧里 石库门

海派风貌小镇

• • •

500M

海派特色推演

滨江风貌区

街道氛围

新村 多层住宅 现代小区 多层高层住宅

发展

街区肌理 • • •

路网密度 街廓尺度 围合要求


南片区城市设计

erfront Urban Design

Streetscape Design// SketchUp, Photoshop,Illustrator

文萃大街

晴阁路

湿地路

凌兆西路

三林湾路

东育路

绿园道

三林北港南路

* best practices research * street scheme design * model making & visualization * guideline book making


东山 街

14m

槐树

中华南路143号

Locust Tree

胸径 Diameter 44cm 高度 Height 12m

胸径 Diameter 50cm 高度 Height 16m

现状面积 Existing Size 350 m2

8.5

m

原始面积 Original Size 250 m2

槐树

Locust Tree

7m

r=22cm

r=25cm

南路

原始面积 Original Size 250 m2

17m

中华

东山街55号

9.5 m

20m

20m

7.5m

7.4

16m

m

槐树

Locust Tree

10m

21m

中华南路141号

大树

原始面积 Original Size 250 m2

8.5m

r=45cm

胸径 Diameter 90cm 高度 Height 20m

槐树

Locust Tree

10m

现状面积 Existing Size 334 m2

现状面积 Existing Size 321 m2

东园 街 7.5m

大树

大树

r=42cm

胸径 Diameter 84cm 高度 Height 20m

r=37cm

槐树

Locust Tree

东山街57号

胸径 Diameter 74cm 高度 Height 20m

原始面积 Original Size 250 m2

Existing Condition // Illustrator

现状面积 Existing Size 284 m2

Taiting Historical District Redevelopment 1.1 区位与历史 Location & History

Anshan,Liaoning, CHINA

Area: 0.36ha (0.89 acre) 台町(たいまち)位于鞍山市铁东区,处于东山(现玉佛山)分 水岭处,东侧是山,西侧是平原,不仅风景宜人,而且符合风水 Date: 2017-2018 中“坐北朝南”的观念。“台町”,是日文称呼。台,指台地, 即高岗、山坡;町,指村庄和街道。两个字合在一起,十分准确 地表达了“台町”的含义—“山坡上的村庄”。

As the initiative district of a 15 hactare residential area 台町历史街区位是一处人文与自然交融的场所 , 片区内拥有 1920 年始建的和洋式建筑 99 所,建筑面积 10 万平方米,加上 built in 1920s by the Japanese, this area depicted the 绿化面积共 20 万平方米。 memory of the city. As being transformed into city’s new gateway, I am in charge of the survey and design process in a design team of 5. We envisioned the area to be a public plaza with unique stories, as well as serving the city as a “living room“. Historical buildings are renovated while residents are not needed to be relocated, private gardens are opened to public with the essense of Japanese style, engawa spaces are also proposed for visitors and locals to stop for a rest.

鞍钢

Anshan Steel

玉佛山风景区 Yufoshan

+

商务中心

Business Center

+

台町片区历史风貌 Historic View

台町历史街区启动区概念设计

5

台町 Taiting 鞍山火车站 Railway Station

+

商业中心

Commercial Center

Locator Map// Illustrator

+

传统人文山水

Chinese Landscape


尺寸(mm)

2.3 历史建筑细部信息 Detailed Information 1

造型

材料及做法

双开门。门套、门框 、门扇均木制;门扇 由木板拼合而成,门 扇上有固定玻璃窗。

保留状况

目前大门保留情况较好 ,红漆上色,原始色彩 不可考。

Double Door

2

5

单开门。门套、门框 、门扇均木制;表面 刷有白色保护漆,门 上带有三个箭形窗, 窗户内是印花玻璃。

门 Door

2 4

用于各层房间 保留情况较好

Door

3

6

单开门。门套、门框 、门扇均木制;表面 刷有白色保护漆

用于一层楼梯底部卫 生间,保留情况较好

3 4

马赛克

陶制马赛克拼贴面砖

一层卫生间铺地 保存较差,部分脱落

木制格栅,表面带有 红色漆并且有斜向纹 样。

二层卫生间与楼梯间隔处 保存较好

Mosaic

1 5

栏杆 Grille

室内部分 Interior

台町历史街区启动区概念设计

28

6

木制扶手,表面刷红 色漆,栏板部分为实 墙,仅留有两个长条 形洞口。

栏杆

Handrail

保存较好

2.4 历史建筑修复建议 Renovation Suggestions

Architectural Survey // SketchUp, Illustrator

材质选择 Materials

灰色人字瓦 Grey Tile 瓦片尺寸约为 450mmx500mm 东北轴侧 NE Axon

槽纹面砖 Grooved Facebrick 面砖尺寸约为 75mmx 75mm

毛石线脚 Stone Plinth 石材尺寸约为 300mm x 180mm 西北轴侧 NW Axon

拉毛涂料 + 蓝色漆面 Galling Paint + Blue Paint 西南轴侧 SW Axon

Architectural Renovation // SketchUp, Maxwell, Photoshop

台町历史街区启动区概念设计

33

东南轴侧 SE Axon


街边停车

X X

人行通廊

X

X

街边停车 建议 1 将乱搭建的低质量房屋拆除,替换成 较为谦逊的体量以补偿拆迁的面积, 同时更将尊重片区历史风貌。

台町历史街区启动区概念设计

建议 2 保留并修葺场地内现存的树木等景 观,尤其是东南角的三棵历史悠久的 槐树,留存原汁原味的记忆。

建议 3 梳理场地的交通现状,将最精华的场 地中心留给行人进行观赏体验,车辆 将限制进入,停车将沿道路设置。

21

3.2 规划原则 Planning Principles

开放性、整体性的开发模式 open and integrated development module 气候适宜性的场地设计 environment adaptive site design 保证历史建筑的形象主体地位 ensure historic architecture as leading image 和洋风格的合理植入 appropriate insertation of Japanese-Western style 可持续的场所营造 sustainable place-making

Design Concept// SketchUp, Photoshop,Illustrator

台町历史街区启动区概念设计

2.5 历史建筑复原风貌展示 Renovated Appearance

:配

ate

d up 效果图 Building Rendering 台町历史街区启动区概念设计

41

台町历史街区启动区概念设计

41

台町历史街区启动区概念设计

台町历史街区启动区概念设计

58

39

44


台町历史街区启动区概念设计

* architecture survey & research * planning structure design * space design and visualization * final booklet design

40

台町历史街区启动区概念设计

59

Concept Design & Rendering// SketchUp, Lumion, Photoshop


Appx.

2-Hour Fast Design


City Mapping 2017 Quanzhou


Appx.

Sketches in Paris 2017 France



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.