G
Regionalism & Globalism
方圆 · 世界 R
[ ACKNOWLEDGEMENTS ] This portfolio would not be done if not for the incessant support from my parents Lao Zhiwei / Yang Luping and my dear girlfriend Guo Shaoping. During my undergraduate years, they have been providing me with valuable advices and critics, encouragements and supports continuously. Besides, heavy appreciate those who have given me direct or indirect help for this portfolio, Prof. Feng Jiang, Mr. Zhong Wenkai, Miss. Francesca Frassoldati, Uncle Zhang Yixiang, Aunt Kanmen, Aunt Ivy, Mr. Luo Leixin, Lin Xincheng, Lv Lianjiang, Li Zhihao, Liu Linyu, Hu Weiquan, Fei Zhiteng, Huang Kaiyan, Zhao Hongxia, Huang Sixin, Guo Anna and the unlisted all. Lastly, this portfolio is specially dedicated to my mother, who will be having her 48th birthday in a week. Happy Birthday Mom. OCT 30th, 2011
[ 致谢 ] 这本作品集是在我的父母劳志伟和杨露萍,还有我女友郭少平,的持续有力的支持下完成的。在我的 本科学习期间,他们一直无私地给予了我很多富有灵感的建议和批评,以及鼓励和各方面的支持。 另外,非常感谢那些对我作品集提供各种直接或间接帮助的老师和朋友们,他们是:冯江老师,钟文 凯先生,Francesca女士,张异响叔叔,劳健文姑姐,劳健瑜姑姐,罗磊鑫师兄,林鑫成,吕敛江, 李知浩,刘琳雨,胡伟泉,费之腾,黄凯燕,赵红霞,黄思昕,郭安娜,以及所有未被提及却一直帮 助我的人们。 最后,这本作品是特别献给我的母亲,她将在下个星期三, 迎来她的48岁生日。妈妈,生日快乐。 2011年10月30日
Regionalism & Globalism Architecture is like a tree. Only by rooting in local soil and absorbing outer nutrients can it bloom and fruit. Contrary to the prevailing idea considering design as a simple practice of combining design aspects in unprecedented ways, I appreciate the morphology and context of the site wherein architecture ideas arise from. This is the concept of architectural regionalism, also known as the vertical and horizontal aspects of architecture. Because of different spatio-temporal characteristics of different sites, I would firstly seek architecture ideas by researches and analysis of the urban morpology and local context when I have a project at hand, thus making the architecture work in concert with the site. Because of the fact that architecture is not merely a living machine, I would seek ways to implement the site elements into my design, and to deconstruct the mechanical elements from my design afterwards. Because of the materiality of architecture, I would try to materialize my understanding and thoughts into concrete construction details so as to future realise my design. Regionalism stands for a series of Because-of’s, a causal relationship from A to B. This is my linear approach to my designs, as well as my speculation towards architecture and architects. However, with the deepening of cognition in architecture, I have been getting to realize the ambiguity of designing process in respect of regionalism and linear logic. Therefore, I need a change, change myself from regionalism to interdisciplinary regionalism and globalism. I need a change. Therefore, I begin to observe the city with global and future visions with a new-born ultimate aim to create a Utopia Town beyond mundane, in which people lead harmonious lives with nature, space and neighborhood to get their maximum satisfy. Regionalism & Globalism actually demonstrates my logic in designing process and the logic of my speculations. This portfolio collects my speculations of the natures of architecture and architects. I hope you can see a real me, once and making changes at the time being. Here I present you my Portfolio,
R & G.
Content City Analysis
Modeling
Construction
Teamwork
Other Skills
P1 - P16
P17 - P26
P27 - P38
P39 - P48
P49 - P60
FOLK MUSUEM
OPERA HOUSE
HYPER RISE
CONTRAST
BLOCK DESIGN
P51
Regionalism
P55
Globalism
[works are organised in a logical sequence following the Preface]
NATURAL REBORN HISTORIC BLOCK
01 Historic community preservation studio, 2011 spring. TYPE: Academic SITE: Guangzhou, Guangdong, P.R.China, 2011.06 CONSTRUCTION AREA: 298,600㎥ PARTNER: Yang Mei, Fei Zhiteng TUTOR: Feng Jiang(one of the recommenders in RL)
1
V.S.
Seeking for the City’s Natural Growth Pattern
2
CONTEXT DESCRIPTION
Province Scale
XXL
8 features in the city of Guangzhou
Main View
Main Block
Main Road
City Scale
XL
Area Scale
L
Block Scale
M
Houses Scale
S
Due to the different histories, our planning site is divided into 4 distinguishing parts, with different self features. One of our biggest problems is to create a way in which they thrive together
[images downloaded from Google Earth, and reorganised by the author]
GEOFRAPHICAL DESCRPTION 3
Primative
Starting
Growing
Speeding
Maturing
Present
1800
1850
1920
1960
2010
Rivers
Roads
Density
Industry First industry Second industry Third industry
1200
HISTORY DESCRPTION The city of Guangzhou has a history of 2000 years, with a start of a center of some surrounding fishing villages. At the end of 14th AC, Guangzhou started to become the only port from which merchants from all over the world delt with Chinese. And the Silk Road on Sea began. Later on, in 19th AC, with the British Troups invading into the mainland, the role of port was strenthened. Our site is exactly where the port was. The residentials and texture of blocks was just the relics of the Port History.
4
PLAN vs GROWTH IN HISTORY [data collected from Liwan Chronicles]
1200
iver
NONE
v.s
R Pearl
iver
R Pearl
Liwan Park
NATRUAL GROWTH
1800
Enning Historic Block
1920
iver
5
1940
NATRUAL GROWTH R Pearl
iver
R Pearl
HUMAN PLAN
v.s
iver
Railway Station
1880
R Pearl
iver
R Pearl
HUMAN PLAN
v.s
NATRUAL GROWTH
1960
TEXTURE TYPOLOGY & PROPOSAL Narrow Street Space
Houses with Front Yard
Houses along river
Overhanging commercials
Commercials in Block
An Abandoned School
A New Middle School
Implant a central Public Green
Add Dynamic Elements
Move Houses backwards from River
Introduce mass commercials
Implant big Plaza
Intersect and Siege to make Modenised
Reconstruct the fasade to make dynamic
Texture Today
Prototype
Design Proposal
High-end residential Rail station Chenqing historic block
Enning historic block
Hospital
6
ROLE CHOICES
Before everything, I should choose an attitude to face this task: whether I should design by the interests of Governors, Myself, or the Residents
1
CHOICE
governor visitor developer
2
CHOICE
planner artist
3
Directed by Investments and Politics
Directed by Architects’ Philosophy
architect
1. Focus on economic and social impacts 2. Use commercials and landscapes in major 3. Ignore the average residents
1. Focus on the expression concepts 2. Made the design as a personal monument 3. Also ignore the average residents
1. Focus on the connection between streets and life average family 2. Provide residents with a pleasant living environment 3. Make a real people-oriented design
CHOICE
Directed by Residents’ Desire
[Picture taken in the turning of Rd Enning and Fengqing Chong, revealing the local residents’ everyday life.]
7
LONGITUDES LOGIC SYSTEM LOGICAL CONNECTION gruadual changing
COGNITIVE SYSTEM
organic continuity
TIME SYSTEM
culture
environments
spacial network
有机 延续 activity cycle
city image
RESIDENTIAL SYSTEM
SOCIAL SYSTEM public domain
city experience
human basic needs
neighbor security cleaning
physical needs
building outfits
accessibilty transportation
landscaping density
VISUAL SYSTEM
LATITUDES:
functional mixed
FIRST LATITUDE [priority thinking elements] SECOND LATITUDE [second in thinking logics] THIRD LATITUDE [third in thinking logics]
PHYSICAL SYSTEM
[ The diagram is drawn on the reading notes of series of books recommended by my instructor of this project, Feng Jiang. ]
8
BOTTOM-UP
From Building to Block
TRADITIONAL HOUSE RECONSTRUCTION We decided to reconstruct the houses in traditional ways, by reseting the skylights in the middle of the houses and re-arrange the functions in them according to their daily life.
HOUSES RECONSTRUCTING SAMPLE 1
^
2
First Floor Plane 1:300
Building Section 1-1^ & 2-2 1:300
The Roof Plane 1:300
Second Floor Plane 1:300
1
2
STREETS RECONSTRUCTING RULES a
A b
B b
Between face to face buildings, the distance should be less than 4m if the buildings both are old, illustrated by distance a; and the distance should no less then 6m if either one of them is newly constructed.
a
L
The new buildings on the site of a length of 10m should be built 10% backwards of the front border, in order to creat public or semi-public green spaces onto the street.
The cornices, door heights and window sills on new buildings should be in an alignment of those on historic buildings.
On the process of reconstructing, the aspect ratio (A/B) shoud be ensured to be no less than the ratio b e f o r e reconstructing; the ratio of a newly constructed street should be no less than 2/3.
9
When the building is relatively higher than average, the upper floors should use terrace to ensure the ratio of 2/3 be no less than 2/3
In a courtyard, fences are recommented to be used to enclosure the space; on special conditions in which walls have to be used, the height of the walls should be no more than 1.5m
In public places, the corners of the structures higher than 1m should be filleted to prevent sharp corners from hurting playing children.
PATTERNS MORPHOLOGY A combination of 9 block rebuilding proposal and 10 street pattern prototypes forms our block design
[One of the samples of Street Patterns]
Add public Concentration
Poor structures are replaced by greens
Reconstruct olde houses in different layers
Implant a big plaza
Structures of olds and news be seperated
Continuous interface
Introduce block public commercials Buildings move backward, giving space for greens Roads be broadened, block square inserted
10
TOP-DOWN From General to Detail
ROADS SYSTEM
PERCEPTUAL PLANNING
RATIONAL PLANNING P P S R S
R
P S RC
P
P
RC S
1
R
R R S
R R
R
R
R
C
1
1
2
3
2
3
2
3
4
5
4
5
4
5
6
7
6
7
6
8
7
9
KEYS: L: The relationship of roads1 Main road axis of residents 2 Three green axises 3 Main road axis of visitors 4 Eight major joints 5 Bike ways 6 Main car ways7 Fire ways 8 Pedestian ways 9
11
M: Aesthetic demo1 Rhythm2 Centripetal force3 Freedom4 diff cores5 Discipline 6 Unitity7
R: Land Usage1
R=residential S=commercial RC=residential and commercial P=public facility
Preserved BLD 2 Publlic BLD 3 Commercial outlet 4 Residents’ centers5 Parking lots 6 7 Eyesight focuses
√
DETAIL PLANNING (PART)
1 2 3
The development of the blocks takes a gradual model, in order to realize their normal metabolism The discussion on historic block should be in the context of city development instead of an individual building The traffic should meet pedestrians’ need firstly and avoid to get broadened in the basis of satisfying fire-protect code
4
Try to slow down driving speed, to creat walking atmosphere
5
Avoid rigid division of functions in order to realize the public commercial and residential mutual penetration
6
The Perfect Preserved Buildings should be slightly repaired instead of expansed The Fair Preserved Buildings should be strengthened in structure, recovered in fasade, made more applicable by adding on modern facilities The Unautherized Reconstructed Buildings should be removed in unautherized structure and change flat roof into slope roof The Poor Preserved Buildings should be dismatled. The land should be used to create public places accessible to all the residents
7 8 9 10
Newly constructed buildings should be kept in continuous interface, in order to difine public space
11
Fasades of newly constructed buildings should be moved backward for a small piece of green area
12
New buildings can use both vertical bearing walls system for the inherent of the field. If adjacent to historic building, they should be saperated. The expansion of Perfect Preserved and Fair Preserved Buildings should use the identifiable and removable structure such as steel
13 14 15
Recycling usage of existing materials should be encouraged Newly constructed and reconstructed structures should not immitate antique structures. Fake antique should be avoilded
12
×
WHEN
Liuqing Residencial Block
BOTTOM-UP MEETS TOP-DOWN
SuperMarket
Residents’ Club
Primary School
Community Service Center
Kindergarden
Ageds Home
Fengqing Residential Block
Changhua Residential Block
Railway Station
High End Residential
13
Liwan Park Fengyuan Mansion
Hospital Fengyuan Historic Block
Enning Historic Block
Chenqing Historic Block
14
DESIGN DATA Specific Planning Details
BASIC DATA SETTLEMENT SITE AREA: 152,900 SM A. Area of residential: 72,100 SM percentage: 47.2% B. Area of Pub Facilities: 17,800 SM percentage:11.6% C. Area of Road: 26,000 SM percentage: 17% D. Area of Public Green: 37000SM percentage: 24.2%
CONSTRUCTION DATA Settlements Construction Area: 298,600 SM Settlements Building First Floor: 81,000 SM Settlements FloorArea Ratio: 2.0 (water excluded) Settlements Volume Density: 53.0% Green Rate: 24.2% Underground Parking Spaces: 650 Underground Garage Area: 22,000 SM
BLOCKS’ DATA CHANGHUA BLOCK Site Area: 40,800 SM Building Area: 117,800 SM FAR: 2.89 Density: 76.0% Num: 204 P Spaces: 50
LIUQING BLOCK Site Area: 39,400 SM Building Area: 87,600 SM FAR: 2.22 Density: 48.7% Num: 27 People: 2493 P Spaces: 600
PUBLIC FACILITIES Site Area: 35,100 SM Building Area: 25,500 SM FAR: 0.73 Density: 24.8%
Construction area percentages
FENGQING BLOCK Site Area: 33,800 SM Building Area: 67,700 SM FAR: 2.0 Density: 65.4% Num: 363
39.5%
22.7%
29.3%
8.5%
15
[My working board with my sketch diagrams nailed on, showing my working process]
SURVEY AND ANALYSIS ON SITE Before working on any project assigned to me, I would seek for conceptual ideas through looking into the site features, which means the timing local history and spatial city context surrounding the site. Because of my believe in that the cultural history and context are the only thing that can make the design only belong to the site while not anywhere else, I firstly conduct survey and analysis of the site. That is how my idea comes.
16
FOLK’n FLECTION PUBLIC MUSEUM
Architecture syntheses design studio, 2009 winter. TYPE: Academic SITE: Zhuhai, Guangdong, P.R.China, 2009.12 CONSTRUCTION AREA: 17500 ㎡ ROLE: Solo TUTOR: Li Zheyang
17
02
Deconstructing Mechanical Column Nets
18
INBORN PROBLEMS
1 2
Physical Conditions The lake is to the west of the site. There exists a conflict between view direction and physical requirements such as shading from the west dusk and ventilize from the south monsoon.
W
View-direction
There is a hill on the west of the site blocking the viewsight. We should seek a way to overcome the sight-blocking problem with least cost of nature.
Shading and Ventilising
Since the museum is located in Zhuhai, South China, and the theme of it is folk, I designed a measure to overcome the shading and ventilising problem by using the traditional skylight.
E
Traditional Taoism Harmony with Nature
Local Climate
Shading & Ventilation Traditional Skylight in South China inplant skylights into section designing
19
SOLUTION 1
DEFORMED COLUMN NET I believe there is always a kind of column net that is uncommon but cheap and funtionable. I discovered this column net. With this column net, a skylight would naturally comes out, and there would turn out to be many combinations of the units of the net, making free expension and different spaces creation possible.
first boundary 3-5m from outer walls second boundary construction red line
20
DIVISIONS AND SPACES The basic unit of the Deformed Column Net can not only be expansed freely, but also be devided differently to create a diversity of types/sizes of spaces. Which can be referred to flowing space, in which functional needs can be met by shifting walls and floors without changing the bearing structures.
[ Divisions ] Small Exhibition
Exhibition
[ Area Data ]
[ Designed Model ]
S=144㎡
S=404㎡
Teahouse
S=256㎡
Office
S=48㎡
Auditorium
S=256㎡
Skylight
S=15㎡
[photos taken to reveal the different spaces comming from the column net]
21
22
SOLUTION 2 For View-blocking Problem
Eclecticism
ELEVATION DESIGN
Due to the feature of view direction and wind-direction, I decided to open large windows on south and north elevations in order to receive more wind and sunshine, and use U-shape double-layers glass to shade from the westward dusk. On east and west elevations, I mainly use solid walls
EAST ELEVATION 1:750
WEST ELEVATION 1:750
SOUTH ELEVATION 1:750
23
Window of the NORTH and SOUTH
B
B
A
A Window of the EAST and WEST
Aluminum alloy extrusion profiles Plastic gasket Silicone Sealant U-shaped glass
material from the periphery of boxwood
LATTICED WINDOWS Silicone Sealant Foam-filled glue
Mortise and Tenon
Joints at the edge of windows
Joints at rightangle turnings
Joints at crossings
Joints at Tturnings
24
9 8 8
8 8 6 12
10
7
7
8
8
8
8
8 10
7
2
9 13
6 13
11
7 14
1
15
10
5
13
3
16 6 6 10
N
FIRST FLOOR PLAN 1:1000 Loby 1 Auditorium 2 Workshop3 Bar 4 Teahouse 5 Exhibition6 Small exhibition hall 7 Folklore archiving 8
25
8
Storage9 Restroom10 Box office 11 Machine room12 Outdoor exhibition13 Mid yard14 Sencond Mid yard 15 Back yard16
4
MODELING Because of the materiality of architecture, I often use hand-made models to generate the spatial experience inside my buildings, and modify them accordingly. What’s more important, it is better than any other way to use models in which I could express myself and present my work of design to the others. It is a construction process, by which I could stay closer to the reality to design something that really makes sense. Later on in this portfolio, you are going to see more hand-made models demonstrating my works.
26
CEREMONIAL HALL CAMPUS-CINEMA Advanced Architecture Design Studio, 2010 fall. TYPE: Academic SITE: Guangzhou, Guangdong, P.R.China, 2010.11 CONSTRUCTION AREA: 7,460㎡ ROLE: Solo TUTOR: Lin Zhe, Feng Jiang
27
03
Going Deep into Detail Building Tectonics
28
STYLE CHOICE Ceremonial with a Big Slope
SURROUNDING ANALYSIS The left picture is the Original Planning Draft of Campus, with a center crossing dominating most of the buildings in campus. Therefore, the site is ceremonial. Besides, the site is surrunded by buildings with slopes.
1
Early Republic with SLOPE
2
Art-deco with SLOPE
2
3
1
5 3
Art-deco with SLOPE
4
Early Republic with SLOPE
5
4
[The geometrical analysis diagram is my original discovery]
Grammar: Premodernism with Slope ? ? ? ? ? ?
? ? ? ? ? ?
29
STAGE
CHAMBER
H≥30m
LOBBY
TYPICAL SECTION
BACKSTAGE
No matter how the exterior looks, the function of a operahouse determines the unchanging section. Therefore, I worked on section design first.
Original Natural Slope A Supposed Bulk of a common operahouse Construct a Slope and Hide most function under the Slope Fit the Auditorium and Stage in to meet Opera Function Construct a Slope Roof to Creat Ceremonial Space Smaller the Bulkiness, Lower the Bulky Pressure
35.600
SECTION 1-1 1:1000
12.800
±0.000
30
17 17 18
15
22
19
17
16
21
21 22
24
18
20
21
20
14 6 13
14
4
6 12 8
11
9
18
18 5 9
3 7
2
10
7
10 10
1 10
ENTRY FLOOR(2nd) PLAN 1:1000 STAGE FLOOR(1st) PLAN 1:1000
N
31
22
23 23
21
23 23
30
26
25
6
27
28 25
28
28 28 29
28 28 28
27 UNDERFLOOR(-1st) PLAN 1:1000
OFFICE FLOOR(3rd) PLAN 1:1000 01. Main Lobby 02. Audience Lounge 03. Balcony Lounge 04. Parterre 05. Balcony 06. Stage 07. Art Gallery 08. Second Entry 09. Small Auditorium 10. Service Office 11. Vip Entry 12. Vip Lounge 13. Yard Entry 14. Sunk Yard 15. Artist Entry
16. Dressing Room 17. Artist Lounge 18. Control Room 19. Props Room 20. Highclass Dressing 21. Rehersal Room 22. Artist Second Entry 23. Office 24. Terrace Stage 25. Staff Entry 26. Half-opened Staff Lobby 27. Roof Entrance 28. Equipment Room 29. Understage 30. Parking Lot
LMH flower rack 2nd tilling roof tilling antique-like roof parametric shading LMH
32
DETAILS- M Two types of Roof
A TILLING ROOF
B SHADING MACHINE
The back part of the house is mainly the pocket of parterre and balcony. A tilling roof meets the phonetic and space-aethetic need.
The front part of the operahouse constributes the entrance and audience lounge, which requires the space to be bright and shaded from the westward dusk sun. A parametric shading skin could meet it.
A B
33
BARS PROTOTYPE The Shading Construction comes from a series of standardised bars. With special joints designed inside, the construction can transform into different forms, giving chance to make use of sunshine.
All Shut Down Without Transformed
All Opened Without Transformed
Transformed in Low Horizonal Line
Transformed in High Horizonal Line
1st Transformed in Free-Form Curve
2st Transformed in Free-Form Curve
-SCUT GUANGZHOU, CHINA
Spring Summer Autumn Winter
HOURLY SOLAR EXPOSURE
incident
absorbed
seasonal choosed
34
direct light
indirect light
shading
DETAILS- S
292
Design in S-scale
312 238 192
586 877
239
201
445
407
616
Construction of Plank
843
68 399 983409 1181
1378 1647
415
[Data collected from Architecture Design Data Set]
Detail of the Upper Joint
FURNITURE DESIGN
With similar construction details, the parametric bars can also be used in furniture design. It can switch to meet defferent needs.
Steel with groove within Designed shading plank
Sitting and Communicating
Sitting and Working
Lying and Resting
Storing and Taking
Gathering and Meeting
Standing and coffeeing
Controller with chips inside
Detail of the Mid Joint
35
01. Ointment as sealant Metal seam cover 02. 35mm 500X500 precast reinforced concrete tiles Isolation layer of fine sand 2 degree polyurethane waterproof coating 15mm 1:3 Cement mortar 40mm C40+ fine aggregate concrete with steel reinforced 3mm zhijin cement 20mm 1:3 Cement mortar 1:6 Vermiculite concrete to find slope In-situ reinforced concrete roof structure 03. 1 non-woven layer overlay 04. Additional waterproofing Waterproofing membrane Galvanized gasket with concrete nailing 05. Yellow bevel sidings 22mmX46mm batten, c.c. 500mm 71mmX27mm framing insulation Rc=3.5 diffusion permeable mambrane 12mm Brich Plywood 06. 10mm smokedoak parquet 45+20mm screed with underfloor heating 10mm impact-sound insulation 20mm thermal insulation 100mm reinforeced concret 07. steel girder IPE 270, c.c. 3000mm 08. Handrail making 98ZJ401 09. Deformation Crack 10. 271mmX200mm reinforced concrete threshold
Detail of Roof Waterproofing 02
01
ROOF FLOOR Detail Cantilever Waterproofing
04
03
UNDERSURFACE OF CANTILEVER 05
CEILING
06 05
SECOND FLOOR FLAT
07
UNDERSURFACE OF CANTILEVER Detail of Cantilever Armor Detail of Window Installing
Detail of Window Installing Detail of Deformation Crack 08
Detail of Bulk Water as a Creek
10 09
36
DETAILS- T
Technical Details
ACOUSTIC & OPTICAL ANALYSIS To construct details of the chember, I calculate the reverberation time, line of sight direction and generate a preciese setion accordingly. Sound reflection and sight direction in section design
1400
19 X 850 = 16150
978 966 956 946 937 929 921 914 907 901 894 889 883 878 873 868 863 858 854 1100
37
Sound reflection and sight direction in plans
5050
3000
[an experiment of adjustable sound reflector blinding bars, conducted by Huang Kaiyan and me]
DETAIL EXPERIMENTS Because of the nature of material, I should also pay attention to setting and designing details so that I can ensure my illusion would be accessible. This is the process of materialising, in which I would have some study on reference constructions fisrt, taking their experience, and then improve mine. Because of my lack of actual stie experience, I would do detail experiments to collect data, and gain similar experience. Usually the experiments are conducted through modeling, hand-made or CAD virtual.
38
BABEL TOWN HYPER - RISE
04 Finalliest in the HYPER BUILDING VERTICAL CITY SC2011 SPAN-CHINA COMPETITION, 2011 spring TYPE: Professional SITE: Madrid, Kingdom of Spain, 2011.04 CONSTRUCTION AREA: 12000 ㎡ PARTNER: Huang Sixin, Hu Weiquan, Lin Yuyu ROLE: Team Leader, Chief designer
39
Bio-Simulation Town Above another Town
40
CONCEPT
Fluctuate Generation
M-40
10km
THE DISTRICT OF CHAMARTIN The site, Chamartin, is located to the North of Madrid and is home to the Chamartin train station, the second largest the second largest in Madrid. This is a project to submerge the train station, providing further space for developing within the city limits.
M-30
THE CITY OF MADRID The Planning Department has instituted a subsidized housing development program, in which three proposed sites hug the outer ring of the historic core of Madrid, and are of the last remaining parcels of open land within boundary. ENERGY STRATIGY, from which we come up with the idea of TREE
Sun Geothermal
Facade
EXHIBITION
Energy Supply
OFFICE Superheated Steams Enhanced System
Wind Wind Generater Rain
Energy Supply
Collection
Minimize Energy Cost
Energy Supply
THEATERS SHOPS HOUSIING
Limited natrual ventilation Building water cycles Watering
Snow [The background picture shows an ideal life of energy recycling in idillic area]
41
+y: REALITY IDEA 1 : ABOREAL SIMULATION
IMAGE OF DASHEEN crown SPATIAL NET
1
O
trunk
2
x: LOGIC PATH
Sieve tubes
WORMWHOLE root
WORMHOLE
UTOPIA
IDEA 2 :[ Resource from google search ] SCRIPTUAL BABLE TOWER
-y: FANTASY
MUNDANE
42
43
CONSTRUCTED BY STAGES Our project can be built on stages. Firstly a tower on the site, then one canopy, then another tower and canopy, and last the third tower. In this way can we deal with the finacial and functional problems
FUNCTIONAL PLANS +300m
FERRIS WHEEL
+220m
BABLE TOWN
life above mundane
thearter
dine
+190m
SKY MALL office
recreation
+000m
URBAN PARK
-010m
PARKING LOT
44
viewseeing residential
POCKETS AND SEIVES
This section perfectly reflects our understanding of discontinuous spaces and our concept of BabelTown, a town in the sky. Under the section we picked several world famous buildings in order to make a contrast of the height and style. For a 300m skyrise, we give up the traditional method of extruding similer plans and form a stick-like boring highrise. Because of the hyper-rise also revealing the future life style, we also design a kind of transporter, in which people can go up and down, forward or backward freely. This kind of transporter is the seives of our Babel Tree.
NORTH-SOUTH SECTION 1:1200 45
DETAILS
a piece of blank paper shred the paper into strips
tear it apart
overlap some of them
cut some of strips
role them
twist them
[idea extracted from the original form of the string linking the cloth and price tag]
THE ELEVATOR DESIGN CONCEPT COMING FROM THE SIEVES Since our idea generates from a simulational tree, we decided to build the skin according to aboreal natural texture, with steel net construction simulating the bark and lifts around it simulating the seive-tubes. Our steel net is generated through iso-structrual lines of a cloth blowed up by native Spanish wind. The tubes within set a new type of lift which does not necessarily require straightness and can be motivated by chemical water.
A
B
C
[ The net shaped simulating a cloth blowed up by native Spain Wind ]
46
THE TOWN A City beyond Mundane
A City beyond Mundane This is one of our basic concepts, the Babel Town, a town in the sky. In the Babel Town, people can walk without the fear of mechanic vehicles, can lead their lifes above the mundane city as if they are hermits, and view their city in a much higher view. This is a life of decency, a life of world-class respect, and a life that above reality but not within fantasy. Between the Bable Town and the city below, there set three wormholes transportation.
Horizonal Functional Partition
8
RIDEPATH
WALKPATH
WALKPATH
RIDEPATH
47
telepad
edge garden
commercial
center park
commercial
residential
stair stage
edge garden
Vertical Upper sky with air navigation lights 20F+ Roller costers and feris wheel 10F+ Roof gardening elevation 5F-10F Residential elevation 2F-4F Commercial elevation 1F-2F Walk and ride elevation
220m =
+50m +40m +30m +20m +10m +00m
These are the divison table and time table of our project. And as for our basic concept... How about this... Let’s see... Bang!... ... ... ... What is this? a Worm Hole again?? Or... seeds?
OMG! His concept is so inspiring!
If you give me your analysis and data on the parameters and variables, I cal generate it.
[ The dialogs were all made up, with permission of those whose images are in the picture ]
TEAMWORK Because of the complexity of the project as well as the limit of deadline, I organized a group of my friends to complete this task together. We all devoted our best passion in it. Lin, the left one on the picture, mainly contributed a series of survey dealing with technical issues. Huang, the girl, completed the fashion drawings. Hu, the boy on right, was perfect with software, offering software support. And I was the team leader, who came up with the concept and who conducted the whole team so that we could cooperate to form a unit.
48
CONTRAST - R & G GLOBALISM
05
REGIONALISM - TRADITIONALISM
- FUTURISM
49
V.S.
TRADITIONALISM & FUTURISM
50
REGIONALISM & TRADITIONALISM SURVEY AND DRAWING ON AN ANCIENT HALL
village
mountians
N
Grand Site Plan field
Vertical Ridge
10.995
Horizonal Ridge
4840
12.225
Revealing the special location of the hall, in between of three topographical elements
LUTONG Tilling Roof Under-eave
5225
Citou Decoration lost
Fabricated Red Brick Wall
Wall Made in Later years
620 320
6.165
-0.260
Indoor Floor
51
DISSECTIVE DIAGRAM In this survey program, we figured out the construction of Tenon and the whole structural system of the ancient hall. Then we use computer modelling to rebuild the whole structure.
52
DISSECTIVE DIAGRAM The front part of a structure unit
A
[ One Structual Unit ]
MANUFEST OF ALL THE COMPONENTS IN A STRUCTURAL UNIT Vertical Loadbearing
Horizontal Loadbearing x1 x1
x1
x1
x1
x1
x1
X2
x6
x2
x2
x6
x4
x12
x4 x1
x2
x2
x1
x1
x1
x1
x1
x1
x1
x1
x2
x2
x1
x2
x1 x1
x2
x2
x1
x1
x6
x1
x1
Auxiliary Structure
x2
x2
x1
x1
Tenon Connection
x1
x2
x2
x2
x2 x2 [the numbers are caculated from the Yisi Tang Ancestral Hall only, and cannot be generalised]
53
DETAILS OF TUOFENG A DECORATION A Suppoorting Component
Detail 1, Counterclockwise Flowers with multi centers
Detail 2, Blessing Animals of Kirin and Deer
Keys: a big Circle and two Symmetry Circles
Keys: a Triangle and a Centrosymmetric Curve Keys: a Big Circle and 3 Smallers
Detail 4, Clockwise Flowers with multicenters
Detail 5, Blessing Animals of Brave-Troops and Crane
Detail 6, Symmetry Flowers with Multicenters
Keys: 2 Concentric Circle and a Hexagon
Keys: a Circle and an upsidedown Triangle
Keys: 4 Symmetry Circles
54
Detail 3, Blessing Animals of Crab and Duck
GLOBALISM & FUTURISM BOUNDARY CONTROL POINT DESIGN
55
TEXTURES OF TWO CITIES
Openning Policy has given Shenzhen a great chace to develop SZ The Securities, Freight, Travalling, making the city thrive from a fishing village within 30 years. The imbalance of regional economic determines the texture in the south part metropolian-like and the north rural.
became the Asian Finance Center in late 20th. Global Securities, HK Hongkong Port, International Airlines, and Import-export politics make foreign trade the core of its economics, leading the texture around Victoria Harbor metropolian-like and the north nature-like.
SZ
SZ Hongkong
Shenzhen
HK
An inbetween of urban and suburban
HK
HK
Abstraction of texture
SZ Honkong
SZ
Reflect the texture in grand plan
SZ
SZ
Shenzhen
HK
An inbetween of city and nature texture
56
HK
Abstraction of texture
HK
Reflect the texture in grand plan
01
Essential points
02
Circultions
03
Pull up to make 3D
04
Textural network
05
06
Structrure & framework Secondary structure
PROJECT INTERPRETATION Located at the border of Shenzhen and Hongkong, the Port of Liantang Xiangyuanwei represents the most severe crash of the two absolutely different characteristics of them. Via diversity of analysis of the the functions and textures of Shenzhen and Hongkong, a series of logics plants our understanding of the sites onto the specific ground, from bones to skin and to the character finally. Simultaneously, the thriving form of our idea also represents the prosperity of the cities across the river. We utilised crosswise thinking and vertical thinking both together, so that we could cover all the aspects contributeing to the port. Based on the features of functions, we used the modeling method as Voronoi to put our concept of texture into reality. Besides, we also consider the changes of spaces experiencing, which will in turn makes the commuters feel the city characters changing while getting through the port.
57
6:00
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
16:30
17:00
17:30
18:00
18:30
19:00
20:00
On Sun-light and Human-flow This was the first time that I had ever designed a boundary control point. To get better perceptual and rational knowledge of what a terminus was, I went to a constructed boundary control point near the construction site, staying there for a whole day from dawn to dusk, collecting data of physical conditions and the changes of people’s flow. No certain results was drawn from it though.
58
SUPPLEMENTAL WORKS Academic Works Snap Shots from 2008 to 2010
SALUTE THE TRADITION
HAN JU, A LAZY HOUSE
IDYLLIC LIFE
Guangzhou, Guangdong, P.R.China
Baiyun Mountain, Guangdong, P.R.China
Jiu Xian, Guangxi, P.R.China
Architecture design studio work
Architecture design studio work
D.a.S.T. International Workshop for Architecture/Planning/Landscape
APR 2008
DEC 2008
AUG 2009
Cooperate with: NONE
Cooperate with: NONE
Cooperate with: Jiang Suo
Main Contribution: All
Main Contribution: All
LOCAL TRADITIONAL HOUSE DSIGN
MOUNTANE VILLA DESIGN
59
PRIVATE VEGETABLE GARDEN DESIGN
Main Contribution: Schematic design On-site construction Drawings
+1 4 Stratigies water system urban life main way and gate of neighborhood archi-type for dynamic changes connection between river and residents and protections
TRANSMIGRATION
RENAISSANCE
SLOPING
SCUT, Guangdong, P.R.China
13 Hongs, Guangdong, P.R.China
Mutian Yu, Beijing, P.R.China
Personal Work
ILAUD, International CHN/JAP/ITA/RSA United Workshop
Architecture internship @ Spacework Architect
JAN 2010
OCT 2010
AUG 2011
Cooperate with: Lin Xincheng Li Zhihao Fei Zhiteng
Cooperate with: Ashleigh Clare Brander Maria Herholdt Ryosuke Hirano Shintaro Inoue Xu Xuan Jianyu Hu
Cooperate with: Zhong Wenkai, Partner Zhao Zhixing, Architect Wang Youyi, Intern
Main Contribution: Schematic design On-site construction Presentaion
Main Contribution: Schematic design Related research, Diagrams, drawings
Main Contribution: Schematic design, Modeling Cmmunicating with Client
LANDSCAPE DEVICE
RECONSTRUCTION PLAN FOR 13 HONGS
60
VISITOR CENTER AT THE GREAT WALL
SUPPLEMENTAL WORKS ART WORKS Snap Shots from 2008 to 2010
PEN SKETCH
WATER COLOR SKETCH GOUACHE PAINTING
Tool: Pen Duration: 45 minutes Date: JUN, 2008 Location: SCUT, Guangzhou, Guangdong, P.R.CHINA
Tool: Water Color Duration: 1.5 hours Date: JUN, 2009 Location: Hengshan Mountain, Hunan, P.R.CHINA
61
Tool: Gouache Duration: 4h hours Date: SEP, 2009 Location: SCUT, Guangzhou, Guangdong, P.R.CHINA
+2
TRAVELLING PLACES SINCE 2000
My Footprint Coverage Places I have stayed for at least 2 days [The Background is the tickets of part of the tourists points I have been to]
PLACES I HAVE TRAVELLED TO This is the best part of this portfolio. I am proud to state that I have travelled to most cities in China and some big ones in the world. I love travelling since my Mum first took me to Beijing in 2000. In the following year at the age of 13, I travelled alone to Shanghai for 10 days. That was the first time I had felt how big the world is and as well as a great sense of freedom. In 2004, I flew alone to America to visit my father who was having further study in San Diago, Ca. In the following two months in America, I went to most big cities and set up my mind to have a study experience in the US, for my bacholar degree, or master. Thereafter, I have been travelling at least three times a year. I think the meaning of one’s life is to experince, to view more natural or artificial beauties, to taste different culture and customs, and to live in an entire unknown environment. Life is short and the world is infinite, and so is my desire to know it. One of my personal dreams is to travel all around the world, in a boat or balloon, or some similar slow ways. My next target is Erope and Tibet. Hope I will reach them soon.
62
PERSONAL INFO NAME: LAO Jingheng DATE OF BIRTH: SEP 6th. 1989 BIRHT PLACE: Guangzhou,P.R.China ADDRESS: R502, BLD11, Royal Dragon Villa, Xiangzhou District, Zhuhai,Guangdong,P.R.China TEL: +86 159-1574-5494 EMAIL: jingheng.lao@gmail.com
EDUCATION South China University of Technolodgy, School of Architecture [ 09/2007 - 06/2012(expected) ] Bachelor Degree of Architecture, in June 2012
RESEARCH EXPERIENCE Ancient buildings of Tang and Song dynasty investment, five cityies, Southeast Shanxi, China [ 07/2011-08/2011 ] Student research program on south China shading measures, Guangzhou, Guangdong, China [ 06/2010-04/2011 ] Survey and Mapping of an ancient ancestral hall, Panyu, Guangdong, China [ 01/2010 ] Survey and Research on Guangzhou local traditionl houses, Guangzhou, China [ 02/2008-04/2008 ]
INTERN AND WORKSHOP EXPERIENCE Architectural internship in Spacework Architects, A visitor center on Great Wall, Mutian Yu, Beijing, China [ 08/2011-09/2011 ] Cheif designer, involved in conceptual design, first party coordination Architectural internship in Academy of Oriental Archi-culture on Liwan Restraurant,Guangzhou, China [ 04/2011-06/2011 ] Chief designer of the front door and VIP hall ILAUD international co-workshop of CHN/JAP/ITA/RSA/HK on recovery of 13 Hongs, Guangdong, China [ 10/2010 ] Studied the diversity of how the anciant port can be renewed Assistant in Bid Organization Commitee, Zhuhai Jiuzhou Tourism Group, Zhuhai, Guangdong, China [ 05/2010 ] Involved in filling, coordinating, interprating in the bidding of Zhuhai Museum, Dongao Hotel(5-star) Survey on traditional dwellings of Donds, Sanjiang, Guangxi, China [ 07/2009 ] Cooperated with local relevant institute to help a minority people D.a.S.T China-France co-workshop on sustainable landscape and architechture, Jiuxian, Guangxi, China [ 08/2009 ] Involved in the design of an old house and a vegetable garden
AWARDS International Competetion SC2011 Hyper Building Vetical City, Finalist, the only Asian team [ 2011 ] Scholarship of Poly RealEstate Co,. Ltd. Top 3% [ 2011 ] Excellent Volunteer of Asian games, Top 0.3% of 3000 volunteers, [ 2010 ] Scholarship of Times RealEstate Co,. Ltd. Top 3% [ 2008/2010 ] Architecture Competetion of Huayang International, Second Prize, Top 10% [ 2010 ] Architecture Fast Game of 3 Schools United, Third Prize, Top 5% [ 2009 ] Academic Excellent Scholarship, highest honer, Third Prize, Peng’s Arcitecture Scholarship, Top 5% [ 2009 ] Excellent Student Scholarship, First Prize, Top 5% [ 2008 ]
63
[ 根已固者 欲求木之长尔]
[ My tree’s foundation is solid, ready for a chance to thrive uphill ]
64