1 minute read

6. GOING FORWARD

6. SUMMARY

Potential Application to Design: Conservation:

Advertisement

- Leaving the ruin as-is after demo and clearing away of debris

Excavation:

- Excavated earth, rock, and debris can be relocated to site of former O2 for Phase 1 of construction

Tunneling:

- Swedish Sound-wall Blasting at sandstone level allows an organic finish for interiors from ~18 m on down.

Case Study Typologies:

-Site allows for a variety of typological spaces

Ventilation and Access:

- Stairs and Lifts should be designed so every level has its own way out - Ventilation should be a combination of natural and mechanical, with emergency systems