6. SUMMARY Potential Application to Design: Conservation: - Leaving the ruin as-is after demo and clearing away of debris Excavation: - Excavated earth, rock, and debris can be relocated to site of former O2 for Phase 1 of construction Tunneling: - Swedish Sound-wall Blasting at sandstone level allows an organic finish for interiors from ~18 m on down. Case Study Typologies: -Site allows for a variety of typological spaces Ventilation and Access: - Stairs and Lifts should be designed so every level has its own way out - Ventilation should be a combination of natural and mechanical, with emergency systems