PORTFOLIO 2013 - 2014
Chong Woo Shin
Chong Woo Shin experience
arktonic architect seoul, korea architectural design 2011-2013 www.arktonic.com
Gansam Architects & Partners seoul, korea office building construction team internship july-august 2010 www.gansam.com
NIDP national institute for disaster prevention; soeul, korea national emergency management agency structural safety research team july-august 2008
education
University of Toronto John H. Daniels Faculty of Architecture, Landscape, and Design toronto, ontario canada master of architecture condition:2-yr attending
Ryerson University toronto, ontario canada school of architecture bachelor of architectural science completed: 2012
Bishop ridley college ontario, canada september 2004-June 2007
3
CONTENTS 2013
• project_01 collider activity center
• project_02 DDP_ Dongdaemun Design Plaza
2014
• project_03 dufferin redux_revitalizing block
• project_04 community common_synthesis
5
project 01 collider activity center program activity play center category competition year Feb. 2013 location mladost 3, Bulgaria team member Sangwook Park, Chongwoo Shin
6
site plan 1:2000
7
PROGRAM MASS
PROGRAM ARRANGEMENT
VIEW INTERACTION
Collider activity center is going to be multifunctional cultural place
namic interaction among the active people who has various backgroun other programs like office or restaurants etc. enclose the area as
what kind of view of harmonization with the context is very important
it provide to the building the concept of new landmark. In other word
The program layout is like courtyard but transparent mass of which b of several layers; outdoor space, interior space and semi-outdoor spa people visiting the center. In other words, the concept of double ga as visual connection. In addition, the plan layout waive construction
First, climbing wall and funtopia is located on the center and lobby a southern west side in order to expose green toward residential area ern east side with terrace for view toward
8
VItosha Mountain.
VENTILATION FOR CLIMBING HALL
RESPOND TO VIEW AND SUNDIRECTION
ENTRANCE
design process
e.
This proposal maximizes the mix-program harmonization. The most important concept was how we provide dyThe first, climbing area is located on the center of building mass and glass wall like glass showcase. The building is going to be landmark contrasting to existing context so that t. Architectural transparency inspire people’s interest of activity on the place more than building itself. So ds, the contents of collider activity center is going to be the landmark through architectural transparency.
nd, visiting the collider activity center.
both side consists of glass window wall generates various visual connections.
ace for interior activities.
This visual connections consists
This visual continuity through the layers creates dynamic environment for all active
alls wall provides the climbing area environmentally energy efficiency in terms of temperature control as well area of the building that means the cost effective massing.
and locker room and shower room is arranged on southern east side for accessibility.
And green house is on and the road. The green house is opened to above top floor. Restaurant and roof top bar is located on south-
9
south elevation 1:750
east elevation 1:750
ground plan 1:750
2nd floor plan 1:750
section A-A’ 1:750
10
north elevation 1:750
west elevation 1:750
3rd floor plan 1:750
top floor plan 1:750
section B-B’ 1:750
11
office
offic
office
roof
office
offic
fitness
rest
office
greenhouse
mul
future commercial area cafe climbing area
greenhouse
funtopia
lobby residential area
12
lock
ce
f top bar
ce
taurant
ltifunctional hall
ker room and shower room
future commercial area
exploded diagram
13
project 02 DDP // Dongdaemun Design Plaza program children’s fab lab category competition_3rd place year Jun. 2013 location seoul, Korea team member Sangwook Park, Chongwoo Shin
14
inside of children’s fab lab
15
play
free of movement, tools and space
16
pre school STEAM program for play
active program for inventive thought
fabrication
future generation design tool experience
unity
Program in the area is chosen for children’s pre-school STEAM program with fab lab(3d print, laser cut, etc). Children starts to play around the area with variety volume. Explore, building the material, role play on their fab lab, and finally exhibition of their work. These will provide children to think and tell their infinite creative idea with expressing fresh and pure approach. On
this design, each fabrication area is a strory telling space. all the other space will
be filled with pre-school
STEAM program for play. The narrow space between STEAM
program and fabrication, it will produce a circulation of path that represents play free.
17
6.
11. 9.
7.
8. 12. 13.
5. 4.
10.
3. 2.
14.
1. 16. 15. 17.
N
plan 1:500
1. Fab play - material room 2. Fab play - light design 3. STEAM class - tasty design 4. STEAM class - scent design 5. Fab play - tall design 6. Fab play - fast design 7. Fab play - tall design 8. STEAM class - sound design 9. Fab play - clean design 10. STEAM class - walking design
18
11. STEAM class - shiny design 12. storage 13. art shop 14. Fab lab 15. reception desk 16. lounge 17. management office
mezzanine bridge 1:250
entire building/ program location
19
Fab.Play
STEAM class
Fab.Play
Fab.Play Fab.Play STEAM class STEAM class STEAM class
Mezzanine STEAM class Storage wall Fab.Play
Rest area
Fab.Lab Fab.Play
Art Shop
sec
tion
Ticket Bo
oth
line
Office
Group General-Individual Staff
Separate path
detail drawing 20
circulation digagram
perspective diagram
section elevation 1:500
detail drawing 21
play design- space for creativity
22
fab play- space for design
23
STEAM class - space for learning
24
fab lab - space for reality
25
lounge - resting area for parents
26
art shop - memory of recollection
27
2F
N
project_03 dufferin redux // revitalizing block program urban development category M.Arch 2nd year year Dec. 2013 location toronto, Canada supervisor Mauricio Quiros
28
3F
4F
5F
6F
8F
9F
11F
14F
floor area per each floor
29
existing plan
proposed plan
N
Dufferin st.
Dufferin st.
Bloor st.
context plan 1:25000
Dufferin grove redux is a urban development project. Start with researching and site analysis, there were discontinuity street, park, residential, semi-detached house and close to core downtown. Neighbor hood of Dufferin had a long history. Since 1800s, the site had developped various different program; garden, park, rail, and track. The goal of this project is to make a harmony of the city via key terms of continuity, neighbor, link, share, park, open space and human. peter eisenman memorial, 2005
30
existing street scape
proposed to use major street
existing street connection on the site
proposed a new connection
street connection was one of proposed key idea for new develop site.
Firstly, major streets has been found via site analysis. Throughout this major street and district division, site area has divided by passing through the street. These all different size of site area will produce the relationship of other various size of block(district) and balanced the neighbour hood with clear circulation of vehicular only path.
31
Bloo
r st.
t.
ns
eri
ff Du
1. Extension & Connection
2. Block & Structure
Chosen program
Bloor st. 2,822m
2
3,432m
8,082m2
5,519m2
6,718m2
3,912m2
10,440m2
7,177m2
8,665m2
856m2
3,312m2
3,188m2
3,879m2
Bloor st.
Commercial: 35,000 m2 + existing 61,755 m2 = 96,755 m2
2
2,976m2
3. Parks &
Office: 15,000 m2 Residential: 150,000 m2
4,877m2
876m2
1,386m2
1,690m2
2,429m2
2,374m2
1,330m2
2,100m2
2,557m2
3,676m2
3,611m2
2,253m2
2,745m2
3,936m2
2,174m2
2,651m2
3,741m2
1,179m2
1,855m2
2,595m2
1,778m2
Area_individual block
Dufferin st.
1,427m2 1,379m2
tree condition 54% of good
Community: 10,000 m2
Recreation: 10,000 m2
2,626m2
Park: 56,094 m2 (proposed)
1,276m2
Parking: 1600 space (underground) Institution: 30,300 m2 canopy coverage of the park 43%
Area_individual block
N 0
32
100m
N 0
100m
Dufferin st.
5,239m2
4. Mass
Openspace
5. Canopy through major street
Access & Nodes commercial entrance residential entrance parking access (underground)
N
0 Existing condition / Access
100m Proposed condition / Access
33
a la Nolli plans
B
N
B
site figure plan 1:4000
0
section BB 1:4000
34
100m
Commercial Residencial
2nd floor plan 1:8000
3rd floor plan 1:8000
6th floor plan 1:8000
9th floor plan 1:8000
35
street connection + canopy + building
elevation view from Dufferin street
building & park pattern 36
under the canopy
mall & residence in the park
building & park pattern (10 years later) 37
project 04 community common // synthesis program community center category M.Arch 2nd year year Apr. 2014 location toronto, Canada supervisor Francesco Martire
38
perspective east elevation rendering
39
N
40
site figure plan 1:4000
Proposal
Focal Point leading people to the centre of the park
Vertical transition building above the existing path
Float proposed a secondary path above the existing path
Transparency clear box/ higher view point than ground
Journey staggered arrangement of plugged in boxes program pod
Anchor structure patially submerged and partially soaring
Dufferin Grove Community Centre is an arrangement of programmatic spaces that anchor themselves to a long corridor spine, hovering over the existing swale of the park and functioning as an extension of the existing pathway. While programmatically rich, the current Dufferin Grove Park lacks the infrastructure to fully exploit the creative potential of the community. The proposal functions as a means to fuse together culture, architecture and landscape. It harmoniously ties together existing program, while creating space for new and interchanging activities. for the
Conceptually, each program box jets out of the main corridor and is arranged in staggered confirmation. This allows for a balance of light entering through the glazed corridor space, as well as a dynamic division of space within the corridor, since the volumes of both the corridor and boxes overlap at joining moments. At the north-east end of the building, the gymnasium is partially submerged underground; the cafe or resting area at the south-west end cantilevers out facing Dufferin Street. These contrasting elements provide stability and lightless and allow for the structure to appear as if it is soaring out from the ground in the centre of the park. the building and into the park itself.
This design is meant to create a smooth journey for pedestrians into
41
1
2
4
3
N
42
site plan 1:6000
1. ice skating rink 2. parking + shipping & receiving 3. baseball diamond 4. soccer field
physical model 1:250
main entrance from the dufferin street
inside of staggered corridor
The building’s main entrance is on the busiest street of the park, Dufferin Street, which leads pedestrians into the building. This is also a pathway leading into the park, as the exit or secondary entrance opens up into the centre of the park. Formally,
Community Centre is a combination of wood-cladded programmatic boxes jetting out of a transparent, glazed space. The long, glazed corridor hosts public programming such as lounge and cafe spaces, and also functions as a means to connect the various programs. The two different types of spaces, open corridor and closed box sets up a journey for the pedestrian from outdoors, to glazed interior, leading into the program areas. The central corridor portion of the structure sits on columns and allows for pedestrians to move beneath along the existing paths, and frames the building with two mounds on either side. the
43
24
10 9
25 11
8
b
b
12
7
13 9 b
b
14
23 22 21
19 20
7
18
16 5
17
6 15
ground plan
N
44
floor plan 1:1000
upper plan
5. entrance stair 6. elevator with glass vestibule 7. exit stair 8. gym 9. storage 10. studio 11. female and male change room 12. stairs to upper level 13. elevator 14. finess
15. platform 16. admission office 17. storage 18. multipurpose room 19. cafe 20. washroom 21. mechanical room 22. meeting room 23. foyer 24. zamboni room 25. skate change
north elevation 1:1000
south elevation 1:1000
ice skating
Park Path
Park Path
Sidewalk
Dufferin St.
Sidewalk
Dufferin Mall
section b-b
45
axonometric drawing 1:500
gypsum board W6"x9" vertical steel stud
mullion
window jamb detail 1:20
46
z-girt insulation
1
Summer Solstice
Equinox
2%
Winter Solstice
69.9o 46.9o 23o
environmental control_ rain and sun shade
3
inside of multipurpose room 4
wall detail 1:50 1. 50mm sedum Roof membrane root barrier water vapour board insulation vapour barrier 13mm plywood 76mm depth metal decking w12”x53” I-beam
3. 30mm wood cladding sheathing Z girts (z600) 25 mm air ventilation (cavity) monolithic liquid applied(kemper systems) 130mm Insulation vapour barrier 13mm sheathing W6”x9” vertical steel stud 13mm plywood 30mm interior wood finish (glue fasten)
4. 30mm wood cladding z girts(z600) 25 mm air ventilation (cavity) monolithic liquid applied 130mm Insulation vapour barrier 13mm sheathing W12”x53 I-beam 76.2mm(3”) depth metal decking 150mm concrete slab 30mm interior wood finish
47
standing plat form at the end of corridor
48
Portfolio 2013-2014 edited by_ Chong Woo Shin shinchongwoo@hotmail.com
49