rom the beginning, the City of Cedar Rapids and City Council have held a long-term commitment to protecting both the west and east sides of the Cedar River with permanent, comprehensive flood control, and securing the financial planning necessary to bring that commitment to reality. The City will continue advocating for flood control on both sides of the river, for all flood-impacted neighborhoods. To that end, a variety of work is underway in both the Time Check and Cedar Lake areas, the northern segment of our Flood Control System. Community amenities such as trails and gathering spaces are integrated throughout the system, as well as intentional transportation planning.
6th Street NW Extension to Ellis Boulevard NW // 2022 Extends 6th Street NW through former Mid-American site, to Ellis Boulevard NW, opening connectivity into Time Check neighborhood New connection for traffic, pedestrians, bikes, transit Includes sidewalk, bike lanes, brick pavers, raised medians, and utility improvements Integrated with permanent flood control plans in Time Check
6
OUR CR
|
M AY 2 0 2 1
6th Street NW Extension to Ellis Boulevard NW.