April 13, 2009

JN: 06187-02 AE:CH:lr





















1


2


3


4


5


6


7


8


9


10


11


12


13


14


15


16


17


18


19


20


21


22


23


24


25


26


27


28


29


This Page Intentionally Left Blank

30


31


32


33


34


35


36


37


38


39


40


41


42


43


44


45


46


47


48


49


50


51


52


53


54


55


56


57


58


59


60


61


62


63


64


65


66


67


68


69


70


71


72


73


74


75


76


77


78


79


80


81


82


83


84


85


86


87


88


89


90


91


92


93


94


95


96


97


98


99


100


101


102


103


104


105


This Page Intentionally Left Blank

106


107


108


109


110


111


112


113


114


115


116


117


118


119


120


121


122


123


124


125


126


127


128


129


130


131


132


133


134


135


136


137


138


139


140


141


142


143


144


145


146


147


148


149


150


151


152


153


154


155


156


157


158


159


160


161


162


163


164


165


This Page Intentionally Left Blank

166


167


168


169


170


171


172


173


174


175


176


177


178


179


180


TABLE 8-2 FUTURE INTERSECTION IMPROVEMENTS AND LOCAL MITIGATION

Intersection

Main St. (NS) & Lakeshore Dr. (EW)

Total Improvements Required by Total Improvements Required by Total Improvements Required by Total Improvements Required by 2012 2014 2016 GP Buildout

None

Install Signal

Local Mitigation Project % for (Improvements not covered Local by TUMF/TIF) Mitigation

TUMF Improvements

TIF Improvements

N/A

N/A

Install Signal, 1.SBL, 1.EBT, 1.WBT

11.40%

None

8.30%

None

1.SBL, 1.EBT, 1.WBT

N/A

Signal Installation, 1.NBL, 1.NBT, 1.NBR with Overlap Phasing, 1.SBL, 1.SBT, 1.EBL, 2.EBT, 1.EBR, 2.WBL, 2.WBT, 1.WBR with Overlap Phasing

Auto Center Dr. (NS) & Franklin St. (EW)

Intersection Does Not Exist

Intersection Does Not Exist

Intersection Does Not Exist

Signal Installation, 1.NBL, 1.NBT, 1.NBR with Overlap Phasing, 1.SBL, 1.SBT, 1.EBL, 2.EBT, 1.EBR, 2.WBL, 2.WBT, 1.WBR with Overlap Phasing

Auto Center Dr. (NS) & Old Franklin St. (EW)

Intersection Does Not Exist

Intersection Does Not Exist

Intersection Does Not Exist

1.NBT, 1.SBL, 1.SBT

N/A

1.NBT, 1.SBL, 1.SBT

None

18.30%

I-15 SB Ramps (NS) & Franklin St. (EW)

Intersection Does Not Exist

Intersection Does Not Exist

Intersection Does Not Exist

1.SBT/L, 1.SBR, 2.EBT, 1.EBR, 1.WBL, 2.WBT

Included in Railroad Canyon Interchange Reconstruction

N/A

None

8.00%

I-15 NB Ramps (NS) & Franklin St. (EW)

Intersection Does Not Exist

Intersection Does Not Exist

Intersection Does Not Exist

1.NBT/L, 1.NBR, 1.EBL, 2.EBT, 2.WBT

Included in Railroad Canyon Interchange Reconstruction

N/A

None

6.40%

Install Signal

None

None

1.SBL, Restripe SBT/R as SBR, 2.EBT, 2.WBT, 1.WBR

N/A

Summerhill Dr. (NS) & Railroad Canyon Rd. (EW)

1.EBT, Overlap Phasing EBR

1.SBL, 1.SBT

1.WBL

1.NBR with Overlap Phasing, 2.WBR with Overlap Phasing

N/A

I-15 NB Ramps (NS) & Railroad Canyon Rd. (EW)

None

1.NBL, Free Right for NBR, 1.WBT

None

2.NBL, Free Right for SBR, 2.EBL, 1.EBR

Interchange Reconstruction

TBD

None

6.23%

I-15 SB Ramps (NS) & Railroad Canyon Rd. (EW)

1.WBL

1.SBR, 1.EBT

None

1.NBR, 1.SBL, 2.WBL, 2.WBR with Overlap Phasing

Interchange Reconstruction

TBD

None

3.45%

Auto Center Dr. (NS) & Diamond Dr. (EW)

None

1.WBT

1.EBL

1.NBL, 1.SBL, 1.SBR, 1.EBR, 1.WBR

1.WBT

1.NBL, 1.SBL, 1.SBR, 1.EBL, 1.EBR, 1.WBR

None

16.20%

Diamond Dr. (NS) & Lakeshore Dr. (EW)

None

1.NBL, 1.EBL, Overlap Phasing WBR

1.SBR with Overlap Phasing

1.NBT, 1.NBR, 1.SBT, 1.SBR with Overlap Phasing, 1.EBT, 1.WBT

1.SBT, 1.SBR with Overlap Phasing

1.NBL, 1.NBT, 1.NBR, 1.EBL, 1.EBT, 1.WBT, Overlap Phasing WBR

1.SBR with Overlap Phasing

16.70%

Diamond Dr. (NS) & Campbell St. (EW)

1.NBL, 1.EBL/T/R, Restripe WBR as WBT/R

Install Signal, 1.EBL

None

1.SBR, 1.EBR with Overlap Phasing

N/A

N/A

Install Signal, 1.NBL, 1.SBR, 1.EBL, 1.EBL/T/R, 1.EBR with Overlap Phasing, Restripe WBR as WBT/R

44.20%

Diamond Dr. (NS) & Sylvester St. (EW)

None

None

Install Signal

None

N/A

Install Signal

None

29.80%

Mission Trail (NS) & Campbell St. (EW)

Install Signal, Restripe for 1.EBL and 1.EBT/R, 1.WBL

None

None

1.NBL, 1.NBT, 1.SBL, 1.SBT, 1.EBL, Overlap Phasing on EBR

1.NBT, 1.SBT

N/A

Install Signal, 1.NBL, 1.SBL, 1.EBL, Restripe for 1.EBL and 1.EBT/R, Overlap Phasing on EBR, 1.WBL

7.00%

Mission Trail (NS) & Malaga Rd. (EW)

None

None

None

1.NBL, 1.NBT, 1.NBR, 1.SBL, 1.SBT

1.NBT, 1.SBT

1.NBL, 1.NBR, 1.SBL

None

28.30%

Mission Trail (NS) & Elberta Rd. (EW)

Install Signal

None

None

1.NBL, 1.NBT, 1.SBT, 1.EBL, 1.EBT/R, Restripe WBR as WBT/R

1.NBT, 1.SBT

N/A

Install Signal, 1. NBL, 1.EBL, 1.EBT/R, Restripe WBR as WBT/R

18.90%

Install Signal, 1.EBL, 1.WBL

None

None

1.NBL, 1.EBT

None

Install Signal, 1.NBL, 1.EBL, 1. EBT, 1.WBL

None

15.90%

Install Signal, 1.SBL

None

1.WBL, Restripe WBL/T/R as WBR

None

None

Install Signal, 1.SBL, 1.WBL, Restripe WBL/T/R as WBR

None

13.10%

Mission Trail (NS) & Bundy Canyon Rd. (EW)

None

1.SBL, 1.EBL, 1.WBL, Overlap Phasing WBR

None

1.NBL, 1.EBT, 1.EBR, 1.WBL, 1.WBT

1.NBL, 1.SBL, 1.EBL, 1.EBT, 1.EBR, 2.WBL, 1.WBT, Overlap Phasing WBR

N/A

None

7.10%

I-15 SB Ramps (NS) & Bundy Canyon Rd. (EW)

None

None

None

1.SBL, 1.EBT, 1.EBR, 1.WBL, 1.WBT

Interchange Reconstruction

N/A

None

2.00%

I-15 NB Ramps (NS) & Bundy Canyon Rd. (EW)

None

None

1.NBR

1.NBL, 1.EBL, 1.EBT, 1.WBT, 1.WBR

Interchange Reconstruction

N/A

None

1.90%

Avenue 6 (NS) & Lakeshore Dr. (EW)

Mission Trail (NS) & Olive St. (EW) Mission Trail (NS) & Lemon St. (EW)

Install Signal, 1.SBL, Restripe None SBT/R as SBR, 2.EBT, 2.WBT, 1.WBR 1.SBT, 1.SBL, 1.EBT, Overlap 1.NBR with Overlap Phasing, Phasing EBR, 1.WBL, 1. WBR with 1.WBR with Overlap Phasing Overlap Phasing

__________________________________________________________________________________ Diamond Specific Plan Traffic Impact Analysis City of Lake Elsinore, CA (JN: 06187-02RIV) U:\UcJobs\_06100-06500\_06100\06187\Excel\06187-02RIV\Table 8-1

181

10.80% 13.90%


This Page Intentionally Left Blank

182


183


184


185


186


187


188


189


190


191


192


193


194


195


196


197


This Page Intentionally Left Blank

198


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.