41 Corporate Park, Suite 300 Irvine, CA 92606
Prepared by: Aric Evatt, PTP Charlene S. Hwang, PE
DRAFT Prepared for:
JIC-CP DIAMOND DEVELOPMENT, LLC 7777 Center Avenue, Suite 300 Huntington Beach, CA 92647
DIAMOND SPECIFIC PLAN TRAFFIC IMPACT ANALYSIS LAKE ELSINORE, CALIFORNIA
April 13, 2009
JN: 06187-02 AE:CH:lr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
This Page Intentionally Left Blank
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
This Page Intentionally Left Blank
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
This Page Intentionally Left Blank
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
TABLE 8-2 FUTURE INTERSECTION IMPROVEMENTS AND LOCAL MITIGATION
Intersection
Main St. (NS) & Lakeshore Dr. (EW)
Total Improvements Required by Total Improvements Required by Total Improvements Required by Total Improvements Required by 2012 2014 2016 GP Buildout
None
Install Signal
Local Mitigation Project % for (Improvements not covered Local by TUMF/TIF) Mitigation
TUMF Improvements
TIF Improvements
N/A
N/A
Install Signal, 1.SBL, 1.EBT, 1.WBT
11.40%
None
8.30%
None
1.SBL, 1.EBT, 1.WBT
N/A
Signal Installation, 1.NBL, 1.NBT, 1.NBR with Overlap Phasing, 1.SBL, 1.SBT, 1.EBL, 2.EBT, 1.EBR, 2.WBL, 2.WBT, 1.WBR with Overlap Phasing
Auto Center Dr. (NS) & Franklin St. (EW)
Intersection Does Not Exist
Intersection Does Not Exist
Intersection Does Not Exist
Signal Installation, 1.NBL, 1.NBT, 1.NBR with Overlap Phasing, 1.SBL, 1.SBT, 1.EBL, 2.EBT, 1.EBR, 2.WBL, 2.WBT, 1.WBR with Overlap Phasing
Auto Center Dr. (NS) & Old Franklin St. (EW)
Intersection Does Not Exist
Intersection Does Not Exist
Intersection Does Not Exist
1.NBT, 1.SBL, 1.SBT
N/A
1.NBT, 1.SBL, 1.SBT
None
18.30%
I-15 SB Ramps (NS) & Franklin St. (EW)
Intersection Does Not Exist
Intersection Does Not Exist
Intersection Does Not Exist
1.SBT/L, 1.SBR, 2.EBT, 1.EBR, 1.WBL, 2.WBT
Included in Railroad Canyon Interchange Reconstruction
N/A
None
8.00%
I-15 NB Ramps (NS) & Franklin St. (EW)
Intersection Does Not Exist
Intersection Does Not Exist
Intersection Does Not Exist
1.NBT/L, 1.NBR, 1.EBL, 2.EBT, 2.WBT
Included in Railroad Canyon Interchange Reconstruction
N/A
None
6.40%
Install Signal
None
None
1.SBL, Restripe SBT/R as SBR, 2.EBT, 2.WBT, 1.WBR
N/A
Summerhill Dr. (NS) & Railroad Canyon Rd. (EW)
1.EBT, Overlap Phasing EBR
1.SBL, 1.SBT
1.WBL
1.NBR with Overlap Phasing, 2.WBR with Overlap Phasing
N/A
I-15 NB Ramps (NS) & Railroad Canyon Rd. (EW)
None
1.NBL, Free Right for NBR, 1.WBT
None
2.NBL, Free Right for SBR, 2.EBL, 1.EBR
Interchange Reconstruction
TBD
None
6.23%
I-15 SB Ramps (NS) & Railroad Canyon Rd. (EW)
1.WBL
1.SBR, 1.EBT
None
1.NBR, 1.SBL, 2.WBL, 2.WBR with Overlap Phasing
Interchange Reconstruction
TBD
None
3.45%
Auto Center Dr. (NS) & Diamond Dr. (EW)
None
1.WBT
1.EBL
1.NBL, 1.SBL, 1.SBR, 1.EBR, 1.WBR
1.WBT
1.NBL, 1.SBL, 1.SBR, 1.EBL, 1.EBR, 1.WBR
None
16.20%
Diamond Dr. (NS) & Lakeshore Dr. (EW)
None
1.NBL, 1.EBL, Overlap Phasing WBR
1.SBR with Overlap Phasing
1.NBT, 1.NBR, 1.SBT, 1.SBR with Overlap Phasing, 1.EBT, 1.WBT
1.SBT, 1.SBR with Overlap Phasing
1.NBL, 1.NBT, 1.NBR, 1.EBL, 1.EBT, 1.WBT, Overlap Phasing WBR
1.SBR with Overlap Phasing
16.70%
Diamond Dr. (NS) & Campbell St. (EW)
1.NBL, 1.EBL/T/R, Restripe WBR as WBT/R
Install Signal, 1.EBL
None
1.SBR, 1.EBR with Overlap Phasing
N/A
N/A
Install Signal, 1.NBL, 1.SBR, 1.EBL, 1.EBL/T/R, 1.EBR with Overlap Phasing, Restripe WBR as WBT/R
44.20%
Diamond Dr. (NS) & Sylvester St. (EW)
None
None
Install Signal
None
N/A
Install Signal
None
29.80%
Mission Trail (NS) & Campbell St. (EW)
Install Signal, Restripe for 1.EBL and 1.EBT/R, 1.WBL
None
None
1.NBL, 1.NBT, 1.SBL, 1.SBT, 1.EBL, Overlap Phasing on EBR
1.NBT, 1.SBT
N/A
Install Signal, 1.NBL, 1.SBL, 1.EBL, Restripe for 1.EBL and 1.EBT/R, Overlap Phasing on EBR, 1.WBL
7.00%
Mission Trail (NS) & Malaga Rd. (EW)
None
None
None
1.NBL, 1.NBT, 1.NBR, 1.SBL, 1.SBT
1.NBT, 1.SBT
1.NBL, 1.NBR, 1.SBL
None
28.30%
Mission Trail (NS) & Elberta Rd. (EW)
Install Signal
None
None
1.NBL, 1.NBT, 1.SBT, 1.EBL, 1.EBT/R, Restripe WBR as WBT/R
1.NBT, 1.SBT
N/A
Install Signal, 1. NBL, 1.EBL, 1.EBT/R, Restripe WBR as WBT/R
18.90%
Install Signal, 1.EBL, 1.WBL
None
None
1.NBL, 1.EBT
None
Install Signal, 1.NBL, 1.EBL, 1. EBT, 1.WBL
None
15.90%
Install Signal, 1.SBL
None
1.WBL, Restripe WBL/T/R as WBR
None
None
Install Signal, 1.SBL, 1.WBL, Restripe WBL/T/R as WBR
None
13.10%
Mission Trail (NS) & Bundy Canyon Rd. (EW)
None
1.SBL, 1.EBL, 1.WBL, Overlap Phasing WBR
None
1.NBL, 1.EBT, 1.EBR, 1.WBL, 1.WBT
1.NBL, 1.SBL, 1.EBL, 1.EBT, 1.EBR, 2.WBL, 1.WBT, Overlap Phasing WBR
N/A
None
7.10%
I-15 SB Ramps (NS) & Bundy Canyon Rd. (EW)
None
None
None
1.SBL, 1.EBT, 1.EBR, 1.WBL, 1.WBT
Interchange Reconstruction
N/A
None
2.00%
I-15 NB Ramps (NS) & Bundy Canyon Rd. (EW)
None
None
1.NBR
1.NBL, 1.EBL, 1.EBT, 1.WBT, 1.WBR
Interchange Reconstruction
N/A
None
1.90%
Avenue 6 (NS) & Lakeshore Dr. (EW)
Mission Trail (NS) & Olive St. (EW) Mission Trail (NS) & Lemon St. (EW)
Install Signal, 1.SBL, Restripe None SBT/R as SBR, 2.EBT, 2.WBT, 1.WBR 1.SBT, 1.SBL, 1.EBT, Overlap 1.NBR with Overlap Phasing, Phasing EBR, 1.WBL, 1. WBR with 1.WBR with Overlap Phasing Overlap Phasing
__________________________________________________________________________________ Diamond Specific Plan Traffic Impact Analysis City of Lake Elsinore, CA (JN: 06187-02RIV) U:\UcJobs\_06100-06500\_06100\06187\Excel\06187-02RIV\Table 8-1
181
10.80% 13.90%
This Page Intentionally Left Blank
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
This Page Intentionally Left Blank
198