Miramichi Multiplex Project

Page 1

Miramichi Multiplex Project Renewing for our future


MIRAMICHI MULTIPLEX DESIGN DEVELOPMENT DECEMBER 5, 2023

Ideal Collaboration

+


MIRAMICHI MULITIPLEX

+1. INTRODUCTION - WHERE WE ARE MJMA + TEAL PROJECT TIMELINE Project Start Date:

24

2024

2023

Months from start:

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Schematic Design Design Development Construction Documents CM + Construction Authorities Having Jurisdiction TP1 (Early Earthworks) TP2 (Refrigeration, Bleacher, Elevator) TP3 (Pool) TP4 (Structural: Concrete + Steel) TP5 (Envelope, Elec, Mech, Finishes, Misc Mtl, Land)

WE ARE HERE

Ideal Collaboration 4

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+

Oct


+1. INTRODUCTION - DESIGN DEVELOPMENT

SIMPLE, COMPACT BUILDING GOOD DESIGN OPTIMIZED MASSING

RATIONAL STRUCTURE EFFICIENT CONSTRUCTION Ideal Collaboration

6

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


PROCESS - REVIT

MECHANICAL ARCHITECTURAL

STRUCTURAL

Ideal Collaboration MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+1. INTRODUCTION - AHJ DISCUSSIONS

Ideal Collaboration 8

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+1. INTRODUCTION - TENDER PACKAGE #1

Ideal Collaboration 9

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+1. INTRODUCTION - TENDER PACKAGE #2

Ideal Collaboration 10

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+2. LANDSCAPE & EXTERIOR - LANDSCAPE

Ideal Collaboration 14

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+2. LANDSCAPE & EXTERIOR - SITE PLAN SITE BOUNDARY SITE BOUNDARY

STAFF & HOME TEAM PARKING

FUTURE ARENA 30M SETBACK

0

A LIMIT)

15M SETBACK (WAW

0

MCEWEN BROOK

-1000

-1000

-1000

-1000

-562

0

SITE BOUNDARY

MIRAMICHI COMPLEX

-600

OOK

UNDARY

SITE BO

MAINTENANCE YARD

MCEWEN BR

DN

-600

0

REFER TO ARCHITECTURAL DRAWINGS -600

0

0

0

-600

POOL MAINTENANCE

0 -600

0

0

-600

N

-600

-1000

DROP-OFF

-500

MAIN ENTRANCE COURTYARD

B/F PAKING

BUS SITE BOUNDARY

12

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

TERRACE

0

Ideal Collaboration

+


+2. LANDSCAPE & EXTERIOR - MAIN ENTRANCE VIEW

Ideal Collaboration 19

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+2. LANDSCAPE & EXTERIOR - POOL NORTH VIEW

Ideal Collaboration 20

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+3. BUILDING LAYOUT - GROUND FLOOR

STAFF & JUNIOR TEAM PARKING

SITE BOUNDARY

FUTURE ARENA WETLANDS 0

30M SETBACK

STOR. 0

-1000

GENERATOR TRANSFORMER WASTE

-1000

-1000

JUNIOR TEAM ROOM

TEAMS CORRIDOR

-1000

TEAM ROOMS

-562

UNIVERSAL CHANGE ROOMS

0

LAP POOL

TEAM ROOMS

MECH. GYM

STOR.

ADMIN

STOR.

-600

SITE BOUNDARY

STOR. STAFF

DN

LEISURE POOL MAINTENANCE YARD

RESURF.

ICE RINK

-600

RECEPTION

MIRAMICHI COMPLEX

0

REFER TO ARCHITECTURAL DRAWINGS

PLAY

-600

0

FILTRATION STOR. LOBBY REFRIG. PLANT -600

MECH. UNITS

VEST.

-600

0

MECHANICAL

-600

MULTI-PURPOSE

-600

STORAGE

STAFF

TEAM & REFEREE ROOM -1000

0

0

0

CONCESSION -500

KITCH.

WC

ELEV. 0

MAIN ENTRANCE

MULTIPURPOSE TERRACE

Ideal Collaboration WETLANDS

DROP-OFF

22

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

0

+

ACCESSIBLE PARKING BUS DROP-OFF


+3. BUILDING LAYOUT - UPPER FLOOR

SITE BOUNDARY

0

30M SETBACK

0

-1000

-1000

-1000

CONCOURSE / TRACK

-1000

-562

0

BLEACHER SEATING MECH. WC

SITE BOUNDARY

-600

DN

CONC. -600

MIRAMICHI COMPLEX

OPEN TO BELOW

MEDIA

REFER TO ARCHITECTURAL DRAWINGS

0

LOBBY

0

-600

0

TICKET

WC

0

-600

CONC. -600

BLEACHER SEATING

0 0

0

ELEV. -600

-600

CONCOURSE / TRACK -1000

-500

0

Ideal Collaboration 23

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+3. BUILDING LAYOUT -ARENA VIEWING GALLERY & HALL OF FAME

Ideal Collaboration 26

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+3. BUILDING LAYOUT -ARENA UPPER LOBBY VIEW

Ideal Collaboration 28

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+3. BUILDING LAYOUT - ARENA VIEW

Ideal Collaboration 29

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+

+3. BUILDING LAYOUT - POOL HALL

LOCKERS

CHANGE

CHANGE

LOCKERS

• Safety zone within p

01

Features:

LAP POOL

• Can be customized to mount d

01 CLIMBING WALL

ORILLIA RECREATION CENTRE

WC POOL STORAGE

AQUATICS HALL

LIFEGUARD OFFICE

LIFEGUARD

LEISURE POOL

30

MMP_ POOL EQUIPMENT OPTIONS NOV. 09, 2023

03 BASKET HOOP

02

04

FAN JETS

Orillia Recreation Centre

University of British Columbia Aquatic Centre 8

MMP_ POOL EQUIPMENT OPTIONS NOV. 09, 2023

10

03 MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

MMP_ POOL EQUIPMENT OPTIONS NOV. 09, 2023

RAMP

LEISURE POOL

VIEWING GALLERY VIEWING GALLERY

SPECTATORS

backboards are also available

• Will take up more pool deck sp

11

LOBBY

WATERFALL

4. 02 EXTRA FEATURES

9

STORAGE

SWIMMERS

+

• Clear backboards are standard Atlas Tube Recreation Centre

• Constructed of 304L Stainless 16’ clear climbing walls are $26,000.00 per 4’ section. They also have a new model now with a powder coated frame and 4x4 panels that have the ability to change the climbing course and offer more climbing area per Constraints: panel. Those are $35,000.00 per 4’ section.

RAMP

WC WC WC

• Transparent back p • Colour coded climb

Basketball Net • Pool depth

POOL BENCH

LOCKERS

4. EXTRA FEATURES

LAP POOL

CHANGE

VANITY

CHANGE

POOL BENCH

SHOWERS

• Constructed of 304 • Use on average - 70

Constraints:

SHOWERS

CHANGE

+

AQUATIC SHOWERS

SHOWERS

• Mounted to pool wa ratio of total width

STORAGE

CHANGE ROOMS

CHANGE ROOM CORRIDOR

CHANGE

Features:

VANITY

LOCKERS

Climbing wall

POOL STORAGE

WC

RETURN SHAFT

WC WC WC WC

4. EXTRA FEATURES + 4. EXTRA FEATURES

04

MMP_ POOL EQUIPMENT OPTIONS NOV. 09, 2023

Ideal Collaboration

+


+3. BUILDING LAYOUT - POOL HALL

Ideal Collaboration 31

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+3. BUILDING LAYOUT - GYM

RETRACTABLE BLEACHER

STORAGE

STORAGE

CHANGE ROOM CORRIDOR

GYMNASIUM DIVIDING CURTAIN

ROOF ACCESS

RETRACTABLE BLEACHER

PLAYERS SPECTATORS

32

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

LOBBY

LOBBY

Ideal Collaboration

+


+3. BUILDING LAYOUT - GYM VIEW

Ideal Collaboration 33

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+3. BUILDING LAYOUT - MULTIPURPOSE ROOM

LOBBY

WC

AV

KITCHEN

WARMING KITCHEN

MP #1

MOVABLE PARTITION

PUBLIC WASHROOMS

WC

MOVABLE PARTITION

UNIV. WC UNIVERSAL

MULTIPURPOSE

MP #2

STORAGE

STORAGE

MP #3

MULTIPURPOSE TERRACE

Ideal Collaboration 34

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+3. BUILDING LAYOUT - MULTIPURPOSE ROOM

Ideal Collaboration 35

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


+3. BUILDING LAYOUT - MULTIPURPOSE ROOM

Ideal Collaboration 36

MMP_ DESIGN DEVELOPMENT PRESENTATION DECEMBER 04, 2023

+


Project Update Completed Works March 2022

June 2022

Procurement of AE Design Team

Engagement of AE Design Team

August 2022 Validation and Optimization of Existing Design begins

September 2022

December 2022

May 2023

June 2023

September 2023

Stakeholder meetings

Presentation to Council

Funding Announcement

Funding Presentation to Province

Project Schedule Revised

Procurement of the Construction Manager

Design Presentation to Council including Project Cost Update

Schematic Design Begins

Engagement of Construction Manager

Since Last Update September 2023 Design Development + Pre Construction Services Begin Indigenous engagement finalized

October 2023 Revision and refinement of the design and construction schedules

November 2023 TP1 Development and Issuance Pool Contractor Engagement TP2 Development and Issuance

December 2023 TP1 contractors on site to begin work


Construction Update TP1 – Site Preparation Awarded to local contractor North Shore TP2 – Elevator, Ice Plant & Pre Cast Bleacher Currently out for pricing with the market, expecting engagement in January 2024 Pool Contractor Limited specialized contractors able to implement a project of this scale and quality. Significant demand, so early engagement was critical to ensuring your project achieves the desired construction timelines. Engagement within next week


Multiplex Project Cost Estimate – Dec 4, 2023 Element

Description

1

CONSTRUCTION

$

76,185,080

89.7%

1.1

Building

$

67,270,586

79.2%

1.2

Overall Site Development

$

4,205,553

5.0%

1.3

Construction Contingency

$

4,708,941

5.5%

2

PROFESSIONAL FEES

$

4,593,050

5.4%

2.1

A&E Professional Fees

$

3,943,000

4.6%

2.2

Project Specific Insurance

$

250,050

0.3%

2.3

Owners Advisors/Legal Fees

$

400,000

0.5%

3

FF&E

$

650,000

0.8%

3.1

FF&E

$

650,000

0.8%

NET PROJECT COST ESTIMATE

$

81,889,912

95.9%

4

TAX

$

3,490,824

4.1%

4.1

HST

$

12,214,220

14.4%

4.2

HST Rebate

$

(8,723,396)

-10.3%

$ 84,918,954

100.0%

TOTAL PROJECT COST