Karangahape main works CLG Presentation 25 February 2020


Overview of Karangahape Station

2


Mined platforms connecting entrances / exits

3


Monitoring Environmental, groundwater and settlement monitoring, attended and fixed, is ongoing for both Beresford Square and Mercury Lane.

4


Traffic Management Utilities Mercury Lane • Cross Street reversal

5


Mercury Lane demolition

6


Temporary shaft and mined tunnels • Temporary shaft excavation within the Mercury Lane CSA • Noise enclosure constructed over temporary shaft, including the spoil area • Mining of cross adits and platform tunnels from base of temporary shaft • Mining undertaken up to 24 hours a day within noise enclosure.

7


Station box excavations – Mercury Lane • • • •

Hoarding Guide walls Construction Support Area Diaphragm wall set up

8


Diaphragm wall (D-wall) construction

9


Diaphragm wall equipment

10


Traffic Management – Beresford Square Pitt Street Stage 1 • Traffic on Pitt Street will be reduced to one lane for northbound traffic as the utilities work continue. • Localised diversions within Beresford Square to maintain private accesses. • Hoarding • Guide wall

11


Construction Support Area Establishment Beresford Square

12


Table Layout Table and topic

Specialists

Table 1 Mercury Lane General

Adam Stilges

Table 2 Beresford Square General

Dan Trotman Manura De Silva

Table 3 Tunnels

Cam Butcher Jonathan Dudman

Table 4 Traffic Management

Fang Lim

Table 5 Environmental monitoring

Claire Drewery Jon Payne

13