City Rail Link – Karangahape Station Community Liaison Group MINUTES AND ACTION POINTS Rā: Wā: 5:00pm – 6:30pm Wāhi: The Mercury Plaza, Cross street ATTENDEES (9)
(DF)
Engagement Advisor
CLG Members
Dan Trotman
Construction Manager
Adam Stilges
Project Engineer Mercury
Glenn Elliot
Michael Coup
Project Engineer
Felix Toepfer
Simon Ferris
Mined Tunnel - Senior Project Engineer
Muy Chhour Grady Elliot
Tony Rennell Bob Frisbee
Link Alliance staff and SME’s
Page | 1
Simon Mitchell (SM)
Community Manager
Arash Barzin (AB)
Development Response Manager
Deirdre Fitzgerald
Communications &
CRLL – CLG
ITEM
UPDATE/ACTIONS
1
Welcome and introductions
SM welcomed everyone and introduced the meeting agenda and venue.
Project overview – Dan Trotman, Construction Manager
2
DT provided an introduction to the project and timeline for the two stations entrances with the BIM images. Mercury Lane overview – Adam Stilges, Project Engineer Mercury Lane
3
AS went through the specifics of what is currently happening at Mercury Lane. What the plunges columns we for and the exact location of the station and underground sections in relation to Canada Street and Mercury Lane. Q asked – will the road on Mercury Lane be reinstated – yes, when project is finished. Mined Tunnels – Simon Ferris, Mined Tunnel - Senior Project Engineer 4 SF went through what exactly was taking place in the temporary access shaft and how excavation of the tunnel was currently being carried out.
5
Hoardings - Arash Barzin, Development Response Manager AB discussed the recent installation of art work along Canada Street by Artist Paul Walsh and plans to continue with art work installation along the hoardings of both sites. 6 Beresford Square – Michael Coup, Project Engineer MC went through the particulars of the next stages of the square, in particular the plunge columns and D-Wall work.
7
Food and follow up questions When is the building finished at Mercury Lane? March 2023 Why two stations? To futureproof the station for increased population and to have an entrance on level ground. Length of escalator in Beresford Square? 40m
Page | 2
CRLL – CLG