Karanga-a-Hape CLG Presentation 30 March 2023

Page 1

Community Liaison Group

Karanga-a-Hape Station (Karangahape)

30 March 2023

Meeting Agenda

5:30 – Welcome and community engagement update – Simon Mitchell, Community Manager

5:35 – Mercury Lane – Adam Stilges, Project Engineer, Mercury Lane

5:40 – Beresford Square – Jonathan Hill, Project Manager, Karanga-a-Hape Station

5:45 – Mined Tunnels – Pierre Daudibertieres, Method Engineer, Karanga-a-Hape Station

5:50 – Station fit-out – Matthew Hamblyn, Architectural Fit-out Project Manager, Karanga-a-Hape Station

6:00 – Urban Realm – Michael Coup, Senior Project Engineer, Karanga-a-Hape Station

6:10 – Back of house view – Jonathan Hill, Project Manager, Karanga-a-Hape Station

6:20 – Discussion and questions

6:30 – End

2

Community Engagement

3
Simon Mitchell, Community Manager

Community Engagement mid Dec –

4
March
5
Mercury Lane Adam Stilges, Project Engineer, Mercury Lane

Mercury Lane Superstructure – March '23

View from George Court building.

Current activities:

- Precast installation

- Fireproofing of steelwork

- Block wall construction.

6

Mercury Lane Superstructure – March '23

7
Level 2 fireproof steel coatings Level 1 blockwork

Mercury Lane Superstructure –

March '23

Precast "Earth Element" panels

Threshold feature panel progress

8

Mercury Lane Underground – March '23

View from B7 looking west.

Current activities:

- Ducting on B7 level

- Plunge column removal

- Internal wall construction

- B5 "OTE" slab construction.

9

Mercury Lane Underground –

Ducting install B7 level

10
March '23
B5 "OTE" slab build
11
March
Mercury Lane Underground –
'23
Stair shaft construction Plunge column removal

Beresford Square

12
Jonathan Hill, Project Manager, Karanga-a-Hape Station

Beresford Square – Above ground

13
Temporary deck removal Main entrance opening Superstructure works

Beresford Square – Underground

14
Plunge column removal Escalator slab construction

Beresford Square – Underground

B2-B1 walls

B2 blade columns

B1 columns

15

Beresford Square – Underground

OTE shoring

Tunnel portals temporary works

Tunnel portals temporary works

16

Mined Tunnels

Pierre

17
Daudibertieres, Method Engineer, Karanga-a-Hape Station

Mined Tunnels – MC31

January 23, End of Secondary Lining and dismantle of formwork

Formwork removal

18

Mined Tunnels – MC31

19
Dec 22 Mar 23

Mined Tunnels – MC30

20
Looking North to Te Wai Horotiu Station Dec 22 Mar 23 Jan 23

Mined Tunnels – MC32

Internal Structures in A5 and MC32 Complete

Dec 22

Mar 23

21

Mined Tunnels – Adit 5

22
23
23
Feb
Mar

Mined Tunnels – Adit 3

23
23
23
Mar
Jan

Mined Tunnels – Adit 2

24
23
23
Mar
Mar

Station fit-out Matthew Hamblyn, Architectural

Fit-out Project Manager, Karanga-a-Hape Station

25

Our Team

We have a team of 9 based on site and a core office team across the three stations based at New Market, offering technical, compliance and subcontractor management advice.

26

What we do

Our role is delivering the Architectural scope for the Karanga-a-Hape Station. Our team manages the follow trades and coordinates activities with the Civil, MEFH and Urban Realm teams.

Subcontractor

THERMOSASH COMMERCIAL LIMITED

Scope of Work

Façade & Internal Cladding

ROKANE LIMITED & METAL CONCEPTS Ceilings

LIVEFIRM CONSTRUCTION LIMITED

SCOTTY DOORS

PRIMA PROJECT LIMITED

THE TILE PEOPLE

ENTERPRIZE STEEL

SHEET METALS & MONKEY TOE

FLAMESTOPPERS

Wall Partitions

Entrance Security Doors

Painting

Flooring & Cladding

Secondary Steel

Metal Work

Passive Fire Protection

HARDWARE DIRECT Hardware

SIGNCRAFTSMEN

STEEL GUARD

GREENMOUNT

CONSTRUCTION SPECIALTIES (CS)

Signage and Wayfinding

Fire rated steel windows

Joinery

Louvres

HALLMARK Door Supply

27

A Look Ahead

Architectural activities start on the 14th April 2023

• Installing electrical service support posts on Mercury Lane superstructure (above ground)

• Passive Fire protection and painting to plantroom blockwork walls basement levels

• Installing partition walls on Mercury Lane

• Building a full-scale platform mockup (currently underway)

28
#1 Forming penetrations for MEFH services #2,3 Service support posts #4,5 Steel Stud

Platform Mockup

Architectural Rendering of Platform

#20 Glassfiber Reinforced Concrete (GRC) wall lining

#25 Aluminum signage Band

#27 Aluminum ceiling Battens

#28,24 Aluminum lining to Pedestrian Screen Door (PSD) bulkhead

#7-10 Terrazzo flooring and precast concrete coping edge

#33 Terrazzo skirting trims

29
30
Urban Realm Michael Coup, Senior Project Engineer, Karanga-a-Hape Station

Urban realm update – Beresford Square - Stage 1

Station drainage connections installed

31

Urban realm update – Beresford Square - Stage 2

Backfill, foundations, concrete structures and paving base construction

32

Urban realm update – Mercury Lane - Stage 1

Temporary road construction and tie in

33

Urban realm update – Mercury Lane -

Stage 2

Traffic switch, footpath construction, kerbing, drainage, utilities and street furniture works

34

Back of house view

35
Jonathan Hill, Station Manager, Karanga-a-Hape Station

Mined Tunnels – Adit 5

The graphics below show where Adit 5 meets the southbound tunnel.

36

Mined Tunnels – Adit 5

The graphics below show where Adit 5 meets Beresford Square station box.

37

Mercury Lane entrance building

38
Level 1

Mercury Lane entrance building

Ground level

39

Discussion and questions

40
41
email us if you have further questions
Thank you for attending
Please
Karangahape@linkalliance.co.nz

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.