Porters Avenue and Wynyard Road
No New
rt
d R h
Level crossing closure
rt Po
Rd
ers e Av
orth N New
n St
o Fent
RAIL LEVEL CROSSING CLOSED
Dom inion
ood ntw
Ave
Bre
Rd
Rd
u Ha
St
d yar yn W
n ltai
Pedestrian access bridge Akirahoover St willopen via stair access only for a few months from 12 August.
eW Sylvan Av
KEY
Maungawhau Station (Mt Eden) construction zone Pedestrian bridge
Horo p
ito S t
This map is indicative only. Dates and activities subject to change.
Accessible detour route Western line
The Porters Avenue level crossing will permanently close on 12 August 2022 On August 12 at 7am, Link Alliance will permanently close the rail level crossing between Porters Avenue and Wynyard Road. The level crossing closure enables the next stage of construction to occur for excavation of the rail trenches for four new rail tracks at this location, including the new CRL rail lines that the new tunnels. Once the level crossing closes, people will be able to cross the rail lines via the stairs on the new Porters Avenue bridge, or by the signposted accessibility route along Dominion Road and Brentwood Avenue. The Porters Avenue Footbridge will replace the level crossing which is due to be completed and fully opened in November 2022.
The current level crossing between Porters Ave and Wynyard Road.
An impression of the Porters Avenue overbridge.
Prioritising public safety We recognise that the closure will be inconvenient for people but it is the only way to ensure pedestrian and worker safety during and after construction. Once the new tracks are completed, four rail lines will pass Porters Avenue with two dedicated CRL tracks lowering into a trench that will lead to the new tunnels. This complex layout means that it is not possible to maintain a safe rail level crossing between Porters Avenue and Wynyard Road. The closure of this level crossing signifies the last of the rail level crossings to be removed for Maungawhau Station (Mt Eden) construction area. Level crossings create an unnecessary safety hazard, where vehicles and pedestrians have the potential to come into contact. Alternative design options to get across the rail corridor were considered during the planning phase of the project and was put out for community
consultation by AT in late 2017. The footbridge was confirmed as the safest, most practicable option. You can read more about the outcomes of Auckland Transport feedback process here: at.govt.nz/projects-roadworks/portersavenuelevel-crossing/ The accessible detour route will be via Brentwood Avenue and Dominion Road. If you require support with other accessible options, or for more information about the accessible route, please contact us via our email mteden@linkalliance.co.nz to discuss with a member of our friendly community team.
Need more information? Sign up to the monthly Maungawhau Station (Mt Eden) newsletter by emailing: mteden@linkalliance.co.nz If you have any questions or concerns about the Maungawhau Station works please contact the Link Alliance Maungawhau Station team:
The Link Alliance will design, construct and deliver the CRL’s twin rail tunnels, two new underground stations and a new Mt Eden station building. The Link Alliance includes seven companies with a wealth of experience in delivering large-scale infrastructure projects in New Zealand and overseas. The companies in the Link Alliance are: Vinci Construction Grands Project S.A.S, Soletanche Bachy International NZ, Downer New Zealand Ltd, Tonkin & Taylor, AECOM New Zealand Ltd, WSP, City Rail Link Ltd.