CLG Karangahape Station Minutes 25 May 2021

Page 1

MINUTES

DATE

25 May 2021

TIME

5-7 PM

LOCATION

The Mercury Plaza, Cross Street

STAKEHOLDERS

Muy Chhour, Grady Elliott, Michael Richardson, Miriam Croucher, Kate Woodruffe, Spencer Moris, Philip Jones, Adriana Christie, Sarah Trotman, Kerrin Leoni.

LINK ALLIANCE ATTENDEES

Simon Mitchell, Community Manager; Deirdre Fitzgerald, Communications & Engagement Adviso; Jonathan Hill, Project Manager; Adam Stilges Senior Project Engineer; Michael Coup, Senior Project Engineer; Jeremie Lore, Senior Project Engineer

SUBJECT

May CLG

Agenda 5:00 – Networking – coffees to order and light snacks 5:30 – Brief welcome – Simon Mitchell, Community Manager 5:35 – Project introduction - Jonathan Hill, Station Manager Karangahape Station 5:45 – Tunnels update – Jeremie Lore - Senior Project Engineer 5:55 – Mercury Lane update – Eva Brosius, Site Engineer 6:05 – Beresford Square update – Michael Coup, Senior Project Engineer 6:15 – Business Support – William Keung, Business Support 6:30 – Questions 6:40 – End


Minutes: •

Introduction

Simon Mitchel welcomed everyone and introduced the meeting agenda and venue. •

Project overview –Jonathan Hill, Construction Manager

Mined Tunnels – Jeremie Lore - Senior Project Engineer

Southbound tunnel top heading (223-metres) is complete and adits of the tunnel under way. •

Mercury Lane overview – Eva Project Engineer Mercury Lane

Steel-fixing and concrete for B1 slab complete, start to excavation beneath B1 slab. •

Beresford Square – Michael Coup, Project Engineer

Steel-fixing and concrete for B1 slab underway, excavation below B1 underway, Samoa House Lane repair works underway. •

Communications - Simon Mitchell, Community Manager

Went through key issues of stakeholders through the month: vibration; parking; access; lighting. Then went through key focus areas: Beresford Square market; a graffiti jam wall; site tours; STEM school initiatives; recycled laptop for local journalist. •

Business Support - William Keung, Business Support

Went through the small business and funding programme and the eligibility criteria for business support for businesses in the Karangahape area. Questions

Answers

Where does the spoil go?

To Woodhill at the moment and some gets reused from there. Spoil from the tunnel goes to Three Kings.


Can you store and reuse the spoil at the

Not at the moment as there is not space on site to

station?

store it and the spoil is mainly rock which can not be reused here.

Can we open the left-hand side of Pitt Street

This has been considered numerous times. There

where the site is?

is not enough room to allow pedestrians safely cross on that side due to truck movements and the minimal space that is free. However it will be considered again towards the end of the project.

Can a pedestrian crossing be put in across

Again, this has been considered but sue to truck

Pitt Street near Red Bar?

movements and the fire and ambulance services in this location it’s not allowed. We will look again at this towards the end of the project.

What is the loud vibration and banging

This is from concrete breaking under the slab and

coming from underneath the slab in

it falling to the ground.

Beresford Square?