Maungawhau CLG presentation May 2023

Page 1

Community Liaison Group Meeting 10 May 2023
Maungawhau Station

1. Communications & Engagement

– Community events & initiatives

2023 Events programme

2. Eke Panuku Development Auckland

3. Environment

4. Construction updates

– Maungawhau Station main site and Mined Tunnels

– Architecture

– North Auckland Line and Tunnels Fit-out

– Systems and Track

5. Questions & Answers

2
Agenda

Helga Sonier

Maungawhau Station Community Manager

3

Communications & Engagement Highlights

Events & initiatives

• Porters Avenue Bridge blessing and lift opening on May 1

• 2023 Eating and social guide released

• Mother's Day promotion

• New hoarding/scrim artwork around site

• Quarterly stakeholder feedback – more personal stories, more visuals of the future work

• Upcoming videos – Tunnels, Waterwall, Timelapse of the Porters Bridge, Boston Roundabout and Vent Building

4

2023 Events Programme

• June 22 Quarterly Info Hub

• Perimeter tour last Saturday and first

Tuesday

• Return to dual tracks celebration

• September Branch Out Uptown Spring

Festival

• Backfill event

• Movies in Basque Park in December

• December Block of Line initiatives including community favourites – ice cream and kawhe

5

Kate Cumberpatch

Eke Panuku Development Auckland

6

Maungawhau N

Ten development blocks (A-J).

750 homes

20,000sqm of shops, eateries and offices

Public park

Better connections from station

Development staging

Phase 1 – 2027-2029

Phase 2 – 2030+

Non-time
dependent –2027+

Lorena Vigoya & Jayden Tabani

Maungawhau Station Environmental team

9

Environmental Update – Noise and Vibration

Works are managed according to our Construction Noise and Vibration DWP

• Assess/plan the works

• Notify residents about works –Communication team

• Undertake works within permitted or agreed hours

• Before an activity starts, put in place required noise mitigation measures (eg. noise mats)

• Undertake noise and vibration monitoring if it is required

10

Project Noise and Vibration Standards

Noise Limits

Daytime Noise Limits (Mon-Sat 7 am- 10pm)

75 dB (average for 30-minute period)

Cosmetic Vibration Limits

Commercial Building

Peak Particle Velocity (PPV) – 10 mm/s

Night time Noise Limits (Mon-Sat 10 pm- 7am, and

Sundays)

60 dB (average for 30-minute period)

Residential Building

PPV – 5 mm/s

Historic/Sensitive Receiver

PPV – 2.5 mm/s

11

Noise and Vibration Mitigations

Planning is the first mitigation; then we implement the best practical options

12

Erosion and Sediment Controls

Works are managed according to our Construction Erosion and Sediment Control

DWP

• Assessmentand Planning of the works

• Review DWP and see if current controls are fit for purpose

• Install new controls if needed.

• Auckland Council inspect controls monthly

13

Water Treatment Plants

14

Water Treatment Plants

15

Catchpit Protection

16

Water diversion bunds

17

Silt Fences – Basque Park

18

Wheel Wash

19
20
Richard Taylor Maungawhau Station Construction Manager

Maungawhau Site - Construction Update

Cut and cover tunnel progress

Backfilling portal

Station building escalators, stairs, and lifts installed

City Rail Link platform and overpass structure

Ventilation building scaffolding removed

Mined tunnelling activity to be completed by July

21

Maungawhau Site

22

Maungawhau Site

23

Maungawhau Site

24

Maungawhau Site

25

Maungawhau Site

26

Mined Tunnels

27

Maungawhau/Mount Eden Station

Architecture Project Manager

28
Nicholas Powell

Maungawhau Architecture Update

• Completed surveying and installation is underway for canopy bullnose on Western Line platform

• Building internal walls and painting - Ventilation building

• Completed louvres on Ventilation building

• Glass panels installed on CRL overpass mid this year

Framing back of house internal walls – Station building

29

Maungawhau Architecture

30

Maungawhau Architecture

31

Maungawhau Architecture

32
33
Nick Adams Construction Manager – North Auckland Line & Tunnels

North Auckland Line (NAL) - Construction Update

• Temporary services bridge removed during Easter BOL.

• Porters Avenue Bridge opened to public on 1 May 2023.

• Porters Avenue streetscape works nearing completion.

• Haultain Street/FentonStreet streetscapeworks have commenced.

• Urban realm work on Boston Road (west) and Normanby Road nearing completion.

• Reinstatement of eastern side of Mt Eden Road to commence shortly.

34

North Auckland Line (NAL)

35

North Auckland Line (NAL)

36

North Auckland Line (NAL)

37

Tunnels Fit-out - Update

• Fit-out works inside CRL platform commenced.

• Fit-out works include pouring first stage and third stage (shoulder) concrete.

38
39
Laurent Illoz Systems Manager – Linear Asset Installation

Systems and Track Building - Update

• Trains switched to newly built section of Western Line track during Easter BOL

• Dual track operations on Western Line expected to recommenceby mid 2023

• Track building continues in the first CRL tunnel and first eastern tunnel.

40

Systems and Track Building

41

Systems and Track Building

42

Systems and Track Building

43

Systems and Track Building

44

Questions & Answers

45

Stay in touch with questions or feedback

• Email the Maungawhau Station at mteden@linkalliance.co.nz

• 0800 CRL TALK – choose option 5 for Maungawhau Station

• City Rail Link website www.cityraillink.co.nz

46