Architecture Portfolio 2018

Page 1

PORTFOLIO

by claudia melchor del Rio

Vol.1 06/18


Claudia Melchor del Rio 06.07.1992, S/C de Tenerife +49 (0) 176 31080533 Fromundstr. 31 | 81547 | Munich | Germany claudiamelchordelrio@hotmail.com http://cargocollective.com/claudiamelchor


Curriculum Vitae

Education Primary School, German School Tenerife | Spain Highschool, German School Tenerife | German High school Diploma, Abitur 2011 B.A. Architecture at the “Technical University Munich” | Germany Exchange Year at the “Arkitektskolen Aarhus” | Denmark M.A. Architecture at The “Technical University Munich” | Germany Exchange semester at the “École spèciale d’architecture” | France

1999-2002

2011-2015 2013-2014 2015-2017 2016 2003 -2011

Work Experience 03-04.2013 Internship at the architecture office “Corona y P. Amaral” | Tenerife | Spain 03.2015-08.2016 Internship at the architecture office “Ekert & Probst Architektinnen” | Munich | Germany 05-08.2017 Employee at the “A.I.T. Architektursalon Munich” | Munich | Germany 09.2017-02.2018 Internship at “Renzo Piano Building Workshop” | Paris | France since 03.2018 Freelance architect and illustrator (collaboration with artist Thomas Canto, and startup “Sursana”) 07.2018-08.2018 Volunteer for the Design Build Project “Stamping Ground” | Karsi Kunda | Gambia

Others 2011-2017 2013 2015 2016 July 2017 October 2017

Full DAAD Scholarship Holder Covering Exhibition at Rambøll | Aarhus | Denmark Freecity, Jahresausstellung Technical University Munich | Germany 3rd Price at the Student Competition “Open Church” | Burghausen | Germany Exhibition REInvent the Museum at the Architecture Museum Augsburg | Germany Exhibition Master Thesis Jahresausstellung Technical university Munich | Germany

Languages Spanish English German French Danish

Digital Skills

Photoshop AutocaD Vectorworks Indesign Rhinocerus Illustrator Archicad Word Cinema 4D Power point Excel Revit



Table of content Academic

p.1-2

The Energy Exchange Route

p.3-6

The Fog Haversting Machine

p.07-10 Dwelling

p.11-14

in Hydro Patterns

Architectural and cultural Uncertainty

Internships RPBW

p.15-18

Internship at Renzo Piano Building Workshop

Workshops

p.19-20

The inflatable city Aarhus

Miscellaneous

p.21

ReInvent the Museum Exhibition

p.22

Parcours vital


Energy Route _ Kapisillit 4th semester | Group work of 4 Done at the ‘Arkitektskolen Aarhus’ | Susan Carruth

The route between Nuuk and Kapisillit is a complicated one, more often it is made by boat to bring fuel and food to the village. The idea in creating the Energy Exchange Route is to transform the route by land into a touristic route which will not only bring visitors to Kapisillit but Energy. The Hikers (locals and tourists) start their Route in Nuuk and are given a Backpack, this Backpack will be charged in the huts along the way through renewable energy sources. Locals and tourists will learn about renewable energy along the way as well as about the greenlandic culture.

01/22

LEFT: Energy Charging Huts RIGHT: Diagrams


Unique Experience

The Exchange System:

Input: Help Energy Helping the locals

From travellers to Kapisillit: Tourists and locas, among them kids, travel the route and collect energy, which they bring to the settlement. There they help the locals with their daily doings.The energy and the helping hand are the keys to stay in kapisillit. From Kapisillit to the travellers: Tourists get and unique experience from hiking and experiencing the Greenlandic landscape. While collecting energy from renewable energy sources on the way, they learn about these technologies. In the same way the tourists learn about the greenlandic culture, by helping the locals.

Output: Knowledge Greenlandic culture Renewable energy

The local kids also get a great experience, they will learn about their cultural heritage and value the hard work and the landscape and nature.

Unique Experience

Km 0 Energy exchange point

N

The Echange Route Nuuk - Kapisisllit

Km 20 Hydropower charging station

Km 40 wind power charging station

Km 60 solar power charging station

Km 80 Energy exchange point


The Fog Harvesting Machine _ 5th semester | Group work of 2 Done at the ‘Arkitektskolen Aarhus’ | Unit D

In the first phase we conducted the research on a weather phenomenon (fog), and in the secon phase the study of lightweight structures took place. Combining two weather phenomena and a structure, we had to decide on a time scale and a placement for our Investigation to take place in. The first end product was a more arch-like structure that was placed in a foggy place catching and magnifying the effects that fog and frost have on the structure. The transportable Pavilion has an homogenous outer look but a vivid inner life, the inner membranes are placed in different positions to allow more or less light to come in and more or less condesation to form.

03/22

TOP: Frozen membrane RIGHT: Visualization



THE OASIS

_

After the first testing’s, the idea to transform the membrane pavilion into a moisture catching machine was provided. Following this thinking path, the Pavilion was transformed and redesigned to collect fog, and be transformed into a landscape changing structure that could be placed in dry places in order to collect water from the condensation that occurs at night.

05/22

TOP: Diagrams BOTTOM: Test models


THE OASIS

_

After testing how water would collect under the structure and what kind of membrane positioning allows for more water to drip, we virtually redesigned the structure in order to create different watering levels inside it, the north facing side would be covered in water while the south facing side would allow people to enter as the water level would be lower. The water recollecting cycle would continue on for years until eventually vegetation would grow and the human induced Oasis would form.

TOP: Diagrams BOTTOM: Test models


Dwelling in Hydro Patterns _ 10th semester | Group work of 3 Done at the “École Spèciale d’Architecture” | Prof. D’Arienzo

One of the most important aspects when dealing with the site was to keep the industrial character while putting in uses that are going to benefit the neighborhood. We found the surrounding area to be very fragmented.In three phases we propose to regenerate the neighbourhood. Phase 1 : The regeneration of the boulevard, by unifying it through a continuous use of pavement patterns, to create a sense of direction and identity. In Phase 2 : we connect the nodes, that we identified as important for the community. Such as sports node, university node...And our water recycling node, which we developed. We connect them by using the patterns, which follow the old railway network. In Phase 3 we regenerate and focus on the nodes.Surrounding the site we find only few public green spaces, that is why we decided to revive the existing green natural space and turn it into a form of public urban forest.

07/22

TOP: Inner visualization RIGHT: Master plan



09/22

TOP: Axo BOTTOM: Sections


Water recollection

Water consumption

Water recollection

Water consumption

Water purification

Water purification

TOP : Diagram MIDDLE: Faรงade BOTTOM: Visualization


Architectural and cultural Uncertainty _ 12th semester | Master Thesis | Solo work Chair for Spatial Arts and lighting design | Prof. Deubzer Chair for arch. history and curatorial studies | Prof. Lepik

My master thesis project is a theoretical, sociological study on conservation and urban regeneration. The goal in creatign this project was to contribute to a more democratic, fair, open and humane Architecture. An Architecture that is able to respond flexibly to the shifting cultural processes and that avoids obsolete urban structures. Uncertain architecture is conected to the cultural loss that can be found in my home island Tenerife, with more and more museums, libraries and cultural institutios closing as well as more and more buildings being abandoned. The project aims to create a participatory environment for the inhabitants to decide inside their community what they need and how they want to build it. In this case the role of the architect is restrained to the locator of the action points as well as the one who lays out the grid that enables thei nhabitants to construct their future.

11/22

TOP: Visualization RIGHT TOP: Faรงade RIGHT MIDDLE: Masterplan RIGHT BOTTOM: Section



13/22

TOP: Room Diagrams BOTTOM: Location Diagram RIGHT: Axonometries



Renzo Piano Building Workshop _ 6 month internship Fubon Tower Taipei | Joost Moolhuijzen

During this 6 months I joined team behind the Fubon Tower, the Fubon Art museum and the Energy center in Taipei, which was already at CD and DD stage, which means working on finishes and details as well has general permits. In these six months I was able to help the team with detail drawings of canopies as well as door details, the interior fur-nishing of the tower lobbys and bathrooms, section drawings, graphics work, 3D modelling for imagery as well as model making. All in all this was not a conventional internship, you are encouraged to take decissions, express them and be an active part oft he team. For me the most valuable experience was getting to know the talented professionals that make RPBW tha way it is.

RPBW

15/22

TOP: Faรงade Detail Blue Print RIGHT TOP: Canopy CD RIGHT BOTTOM: Sliding Door Detail


業主

CLIENT

富邦人壽保險股份有限公司 Fubon Life Insurance Co., Ltd.

專案營建管理

PROJECT & CONSTRUCTION MANAGEMENT

富邦建設股份有限公司

Fubon Land Development Co., Ltd.

執行建築師

ARCHITECT OF RECORD

姚仁喜 | 大元建築工場 KRIS YAO | ARTECH

設計建築師

DESIGN ARCHITECT

倫佐。皮亞諾事務所

Renzo Piano Building Workshop - Paris

結構顧問

STRUCTURE CONSULTANT

奧雅納

Arup - London

EGRESS CANOPY TYPE C 1-b

LINK CANOPY TYPE C2-b

永峻工程顧問股公司

Evergreen Consulting Engineering, INC.

空調/機電/建築物理

HVAC, MEP & BUILDING PHYSICS

奧雅納

Arup - London

林伸環控設計有限公司

IS Lin & Associates Consulting Engineers

恆開工程顧問有限公司

112

143

Heng Kai Engineering Consulatants, Inc.

景觀顧問

LANDSCAPE CONSULTANT

SWA

SWA - CA, USA

禾拓規劃設計顧問有限公司

CNHW Planning & Design Consultants

外牆顧問

FACADE CONSULTANT Thornton Tomasetti - London

260

295

宋騰添瑪沙帝 垂直運輸顧問

VERTICAL TRANSPORTATION CONSULTANT

奧雅納

Arup - London

0.00 m L-01-Lobby

燈光顧問

LIGHTING CONSULTANT

大公照明設計顧問有限公司

chroma33 Architectural Lighting Design

備註 Notes

88

150

150

150

147

147

147

147

147

147

147

147

147

147

147

147

147

147

147

147

147

1. 請勿丈量圖面,請詳標註尺寸 Do not scale drawings. Dimensions govern.

3182

SECTION 1:50@A1

2. 除另有標註,所有尺寸單位皆為公分 All dimensions are in centimeters unless noted otherwise 3. 所有尺寸在施作前需完成現場放樣. All dimensions shall be verified on site before proceeding. 4. 未經同意,不得修改圖面內任何資訊. The author shall be notified in writing of any discrepancies.

MUSEUM'S CAFE A

3182

CD PACKAGE

版次

修改項目

REVISION

MODIFICATION

23/12/2017 日期

DATE

392

113 232

富邦信義A25綜合商業大樓新建工程

FUBON XINYI A25 COMMERCIAL BUILDING COMPLEX

610

696

Museum - RQ - Tower B01&L01 Façade Construction Documents 繪圖者

AUTHOR

RPBW 232

圖名

TITLE

CANOPY TYPE C-2b LINK CANOPY TO MUSEM 檔案名稱

FILE NAME Copyright Renzo Piano Building Workshop 2017

113

A7TL-58 比例

修訂日期

SCALE

REVISION DATE

1:50@A1 1:100@A3

23/12/2017

版次

圖紙號碼

PLAN 1:50@A1

REVISION

DRAWING N°

A7TL-58

A

業主

CLIENT

富邦人壽保險股份有限公司 Fubon Life Insurance Co., Ltd.

專案營建管理

PROJECT & CONSTRUCTION MANAGEMENT

富邦建設股份有限公司

Fubon Land Development Co., Ltd.

執行建築師

ARCHITECT OF RECORD

姚仁喜 | 大元建築工場 KRIS YAO | ARTECH

設計建築師

DESIGN ARCHITECT

倫佐。皮亞諾事務所

Renzo Piano Building Workshop - Paris

FAçADE TOP BRACKET

結構顧問

STRUCTURE CONSULTANT

奧雅納

Arup - London

GLARE AND SOLAR CONTROL MOTORIZED ROLLER BLINDS

永峻工程顧問股公司

Evergreen Consulting Engineering, INC.

MU 02H: SOFFIT WITH 6MM ALU THICK PANEL

空調/機電/建築物理

HVAC, MEP & BUILDING PHYSICS

奧雅納

Arup - London

林伸環控設計有限公司

IS Lin & Associates Consulting Engineers

恆開工程顧問有限公司

Heng Kai Engineering Consulatants, Inc.

景觀顧問

LANDSCAPE CONSULTANT

320

SWA

SWA - CA, USA

禾拓規劃設計顧問有限公司

CNHW Planning & Design Consultants

外牆顧問

FACADE CONSULTANT

宋騰添瑪沙帝

Thornton Tomasetti - London

垂直運輸顧問

VERTICAL TRANSPORTATION CONSULTANT

奧雅納

Arup - London

燈光顧問

LIGHTING CONSULTANT

大公照明設計顧問有限公司

chroma33 Architectural Lighting Design

DOUBLE GLAZING ACCORDING TO WIND LOADS AND TECHNICAL REQUIREMENTS

備註 Notes

DOUBLE GLAZED MOTORIZED SLIDING DOOR

1. 請勿丈量圖面,請詳標註尺寸 Do not scale drawings. Dimensions govern. 2. 除另有標註,所有尺寸單位皆為公分 All dimensions are in centimeters unless noted otherwise 3. 所有尺寸在施作前需完成現場放樣. All dimensions shall be verified on site before proceeding.

200 mm DEEP STEEL FIN ADAPTED TO STRONG WIND CONDITIONS

4. 未經同意,不得修改圖面內任何資訊. The author shall be notified in writing of any discrepancies.

ELECTRIC BOX AND SLIDING DOOR MECHANISM UNDER THE FLOOR

290

145

STEEL UPSTAND FOR WATERPROOFING METAL FLASHING

WP DETAIL

25/01/2018

A

CD PACKAGE

23/12/2017

版次

修改項目

REVISION

MODIFICATION

日期

DATE

ELECTRIC BOX AND SLIDING DOOR MECHANISM UNDER THE FLOOR

WATER DRAINAGE FOR THE MOTOR

TRACKS FOR SLIDING DOOR

DOUBLE GLAZING SLIDING DOOR

CONCRETE POCKET FOR MOTOR

46

METAL GRAITING (openable for maintenance)

23

CONNECTION ELEMENT BETWEEN MOTOR AND SLIDING DOOR

GENERAL WATER DRAINAGE

300 mm deep STEEL FIN ADAPTED TO STRONG WIND CONDITIONS

20

14

MAIN WATERPROOFING

B

SLIDING DOOR CENTER PROFILE

DOUBLE GLAZED MOTORIZED SLIDING DOOR

METAL GRAITING (openable for maintenance)

RIGID INSULATION

DETAIL SECTION 1:10

富邦信義A25綜合商業大樓新建工程

FUBON XINYI A25 COMMERCIAL BUILDING COMPLEX

17

14

6

Museum - RQ - Tower B01&L01 Façade Construction Documents 繪圖者

PROJECTION OF STEEL FIN ABOVE

AUTHOR

RPBW

30

20

圖名

Copyright Renzo Piano Building Workshop 2017

TITLE

FACADE TYPE MU-02 NORTH VOLUME

18

25

檔案名稱

FILE NAME

145

37

290

A7M-14 修訂日期

REVISION DATE

比例

SCALE

5@A1 10@A3

02/02/18 圖紙號碼

DRAWING N°

DETAIL SECTION 1:5

FLOOR PLAN DETAIL 1:10

A7M-14

版次

REVISION

B


RPBW

17/22

LEFT: Museum Entrance Rendering Different Bathrooms Tower Lobby Renderin


Copyright Renzo Piano Building Workshop 2016

420

50

L59 Top of Screen +265.55m

420

L58 Screen +260.85m

420

L57 Screen +256.65m

420

L56 Lift Rooms R+2 +252.45m

840

L55 Lift Rooms R+1 +248.25m

30

L54 Event Space +239.85m

18 17.5

10

840

L53M MEP Mezzanine

420

L53 MEP +231.45m

420

L52 Executive +227.25m

420

L51 Executive +223.05m

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

420

L50 Rental +218.85m

420

L49 Rental +214.65m

420

L48 Rental +210.45m

420

L47 Rental +206.25m

420

L46 Rental +202.05m

420

L45 Rental +197.85m

420

L44 Rental +193.65m

420

L43 Rental +189.45m

420

L42 Rental +185.25m

420

L41 Rental +181.05m

420

L40 Rental +176.85m

420

L39 Rental +172.65m A

B

420

L38 Rental +168.45m A

B

L37 Rental +164.25m

840

L36M MEP Mezzanine

420

L36 MEP/ Storage +155.85m B

C

D

E

F

A

B

C

D

E

F

420 420

L34 Transfer/ Amenities +147.45m

E

F

E

F

E

F

E

F

E

F

E

F

E

F

E

F

E

F

E

F

E

F

E

F

420

L33 Fubon MZ +143.25m

420

L32 Fubon MZ +139.05m

420

L31 Fubon MZ +134.85m

420

L30 Fubon MZ +130.65m

420

L29 Fubon MZ +126.45m

L28 Fubon MZ +122.25m

420

28185

A

L35 Transfer/ Amenities +151.65m

420

L27 Fubon MZ +118.05m

420

L26 Fubon MZ +113.85m

420

L25 Fubon MZ +109.65m

420

L24 Fubon MZ +105.45m

420

L23 Fubon MZ +101.25m

L22 Fubon MZ +97.05m

840

L21M MEP Mezzanine

420

L21 MEP +88.65m

A

B

E

F

A

B

E

F

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

A

B

420

L20 Fubon LZ +84.45m

420

L19 Exhibition/ Gym +80.25m

420

L18 Fubon LZ +76.05m

420

L17 Fubon LZ +71.85m

420

L16 Fubon LZ +67.65m

420

L15 Fubon LZ +63.45m

420

L14 Fubon LZ +59.25m

420

L13 Fubon LZ +55.05m

420

L12 Fubon LZ +50.85m

420

L11 Fubon LZ +46.65m

420

L10 Fubon LZ +42.45m

420

L09 Fubon LZ +38.25m

420

L08 Fubon LZ +34.05m

L07 Fubon LZ +29.85m

840

L06M MEP Mezzanine

420

L06 Office/ MEP +21.45m

Terrace Railing +21.10 L05 +20.00

420

L05 Fubon LZ +17.25m

1305

L04 Fubon LZ +13.05m

-00.45

-00.60

420

-00.75

A

B

C

D

E

F

A

B

C

D

E

F

L01 Lobby +0.00m (ABS +8.40m)

+7.30

550

B01 Lobby -4.20m

400

B02 Bus Parking -9.70m

305

B03 Parking -13.70m B04 Parking -16.75m

580

580

580

580

580

580

580

580

580

580

580

580

1350

Fa1

3

4

5

1350

1350

1350

1350

1350

1350

1350

825

Fa2

6

7

8

9

12

13

14

15

16

17

18

19

20

21

22

CLIENT

Fubon Life Insurance Co., Ltd.

業主

富邦人壽保險股份有限公司

ARCHITECT OF RECORD

PROJECT & CONSTRUCTION MANAGEMENT

Fubon Land Development Co., Ltd.

姚仁喜 | 大元建築工場

專案營建管理

KRIS YAO | ARTECH

執行建築師

富邦建設股份有限公司

Arup - London

STRUCTURE CONSULTANT

DESIGN ARCHITECT

Renzo Piano Building Workshop - Paris

倫佐。皮亞諾事務所

結構顧問

設計建築師

奧雅納

Arup - London

Evergreen Consulting Engineering, INC.

永峻工程顧問股公司

HVAC, MEP & BUILDING PHYSICS

空調/機電/建築物理

奧雅納

CNHW Planning & Design Consultants

禾拓規劃設計顧問有限公司

林伸環控設計有限公司

Heng Kai Engineering Consulatants, Inc.

恆開工程顧問有限公司

LANDSCAPE CONSULTANT

IS Lin & Associates Consulting Engineers

景觀顧問

VERTICAL TRANSPORTATION CONSULTANT

外牆顧問

Arup - London

Thornton Tomasetti - London

FACADE CONSULTANT

宋騰添瑪沙帝

chroma33 Architectural Lighting Design

燈光顧問

垂直運輸顧問

LIGHTING CONSULTANT

大公照明設計顧問有限公司

奧雅納

2. 除另有標註,所有尺寸單位皆為公分 All dimensions are in centimeters unless noted otherwise

1. 請勿丈量圖面,請詳標註尺寸 Do not scale drawings. Dimensions govern.

日期

DATE

04/01/2018

11

備註 Notes

修改項目

DD DE-STACK

MODIFICATION

版次

REVISION

A

100 % De-Stack Design Development

AUTHOR

富邦信義A25綜合商業大樓新建工程

FUBON XINYI A25 COMMERCIAL BUILDING COMPLEX

繪圖者

looking north

RPBW

TITLE

圖名

A4-01

A

500@A1 1000@A3

SCALE

版次

REVISION

比例

SECTION - Songgao Rd

檔案名稱

FILE NAME

A4-01

31/05/2017 04/01/2018

修訂日期

REVISION DATE

DRAWING N°

圖紙號碼

10

4. 未經同意,不得修改圖面內任何資訊. The author shall be notified in writing of any discrepancies.

2

3. 所有尺寸在施作前需完成現場放樣. All dimensions shall be verified on site before proceeding.

1

TOP: Stacking Diagram Overall Tower Section BOTTOM: Tower Floor Plan


Instant City Aarhus _ 5th semester | Group work of 6 Done at the “Arkitektskolen Aarhus� | Unitd D

The main task in this workshop was to create an inflatable city out of plastic. The cooperation with the neighbours was of vital importance as we had already acknowledged in the previous experiment, where a scale model of the instant city in Ibiza was built. My teams structure could be added to any other and cooperate with it in forming a new building piece. The snail form allowed changes in the space sensation and dynamic, concluding in a more open space. In the end the whole mega structure with all the small components joint together was blown up to create the instant city Aarhus.

19/22

TOP: construction diagram RIGHT: process pictures



ReInvent the Museum _ 10th semester | Work in a group of 5 Chair for arch. history and curatorial studies | Prof. Lepik

After the semester Project named “ReInvent� the museum where we had to think about the how the museum of the future would look like, we where asked to curate an exhibition showcasing the end results of the Semester in the Architecture Museum Augsburg. We planed and created a system to showcase the posters and models, as well as did research on the city and history of the museums in Augsburg. The Poster trees were fabricated our of steel and made so that they could be dismounted and used for other exhibitions.

21/22


Parcours Vital _ 10th Semester | Work in a group of 7 Design Build Studio at “L’Ècole Spéciale d’Architecture”

This was an urban co-construction project. We took recycled materials from the adjacent markets and asked the inhabitants of the uarea to help us implement our idea. An urban sport spot. The euro paletts were reworked and other construction materials were used to create the bars and exercise elements. The inhabitants seemed happy with the result and still use it nowadays. Collaboration with “Les Grands Voisins”

22/22


more under: cargocollective.com/claudiamelchor Thank you!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.