CDB ENGINEERING SPA Single source Engineered solutions
|
AGENDA
About us Company Profile Our activity Products & Services Our commitment Final highlights
2 febbraio 2018
| 2
CDB COMPANY PROFILE
CDB is a global provider of customized products, turn-key solutions and services for the Oil& Gas, Petrochemical and Power Generation industries. OUR BUSINESS UNITS
Strainers and
Process equipment
steam line
and packages
2 febbraio 2018
| 3
Plug valves
CDB OVERVIEW
Location Milan Area - Italy
2 febbraio 2018
| 4
Total number of staff 102
CDB FACILITIES LAYOUT
Total built over area 25.000 square meters Total factory area 10.000 square meters Max manufacturing capa. per month ~80 tons
2 febbraio 2018
| 5
CDB FACILITIES LAYOUT | BUILDING 1
2 febbraio 2018
| 6
CDB FACILITIES LAYOUT | BUILDING 2
2 febbraio 2018
| 7
CDB FACILITIES LAYOUT | BUILDING 3
2 febbraio 2018
| 8
CDB COMPANY PROFILE
2 febbraio 2018
| 9
CDB ORGANIZATION CHART BOARD OF DIRECTORS G. Maino, V. Sgariboldi, S. Simunno MANAGING DIRECTOR V. Sgariboldi ADMINISTRATION STAFF
FINANCE MANAGER HR MANAGER OPERATION MANAGER H.S.E. MANAGER
INSPECTION AND TEST STAFF QC STAFF
QUALITY CONTROL MGR.
PURCHASING MGR.
PRODUCTION PLANNING MGR.
WAREHOUSE MGR.
WORKSHOP MGR.
BUYERS / EXPEDITERS
PACKING STAFF
WAREHOUSE SUPERVISOR
PRODUCTION SUPERVISORS
WAREHOUSE STAFF
WORKSHOP STAFF
IT & ERP MANAGER MANAGEMENT REPRESENTATIVE QUALITY ASSURANCE MGR.
QA STAFF
PRODUCT CERTIFICATION MGR.
PROCESS EQUIPMENT & PACKAGE DIVISION
PIPING & VALVES DIVISION COMMERCIAL DIRECTOR
MANAGER
LEAD PROJECT MANAGER
PROJECT MANAGER/ ENGINEERS
DOCUMENT CONTROLLER
PROCESS ENGINEERS
2 febbraio 2018
ENGINEERING MANAGER
DISCIPLINE LEAD ENGINEER
MECHANICAL ENGINEERS
| 10
ENGINEERING MANAGER PIPING AND VALVES
PROCESS DIVISION SALES DIRECTOR
VALVES LINE SALES MANAGER
STRAINERS & STEAM LINE SALES DIRECTOR
PROPOSAL & SALES MANAGER
SALES STAFF
SALES STAFF
LEAD ENGINEER
LEAD MECHANICAL ENGINEER
PROJECT MANAGERS
PROJECT ENGINEERS
MECHANICAL ENGINEERS
DOCUMENT CONTROLLER
PROPOSAL ENGINEERS
ELECTRICAL & INSTRUMENTAL ENGINEERS
EXPEDITING AND INSPECTION MANAGER
PAINTING ENGINEER
WELDING ENGINEER
CDB ORGANIZATION CHART
PROCESS EQUIPMENT & PACKAGE DIVISION COMMERCIAL DIRECTOR
MANAGER
LEAD PROJECT MANAGER
ENGINEERING MANAGER
PROCESS DIVISION SALES DIRECTOR
PROPOSAL MANAGER
DOCUMENT CONTROLLER
PROJECT MANAGERS/EN GINEERS
PROCESS ENGINEERS
2 febbraio 2018
DISCIPLINE LEAD ENGINEER
MECHANICAL ENGINEERS
| 11
PROPOSAL ENGINEERS
ELECTRICAL & INSTRUMENTAL ENGINEERS
EXPEDITING AND INSPECTION MRG.
CDB QUALITY SYSTEM
All activities are carried out in conformance with our Quality System:
ISO 9001:2008
2 febbraio 2018
ISO 14001:2004
| 12
OHSAS 18001:2007
CDB QUALITY / PRODUCT
ASME “U” STAMP
2 febbraio 2018
ASME “U2” STAMP
| 13
PED 97/23/EC
TS TR 010/2013 TS TR 032/2013
CDB COMPANY PROFILE Process equipment and packages division CDB Process Division deliver fully assembled and tested process equipment & packaged units, taking single-point responsibility of all aspects of turn-key supplies: • Full process and detailed engineering (including structural, mechanical, electrical and instrumental) • Project management throughout the design and construction cycle • Selection and qualification of sub-vendors; material procurement • Fabrication and assembly in our facilities • QA/QC monitoring; inspection & testing, expediting • Commissioning & start-up
2 febbraio 2018
| 14
CDB PRODUCTS & SERVICES
PROCESS EQUIPMENT FILTERS •
Process Filters (Basket, Cartridge, Coalescer, Bag, Automatic type)
SEPARATORS •
Gas Separators (Vane, Demister, Cyclone)
•
Gas Filter Separators (Double Stage)
• Duplex Basket Filters • Activated Carbon Filters
2 febbraio 2018
•
| 15
Three-Phase Separators
HEATERS •
Indirect Heaters (Water Bath Heaters, Intermediate Fluid Heaters)
•
Electric Heating Sys.
PIG TRAPS •
Pig Launchers & Receivers (Scraper Traps)
CDB PRODUCTS & SERVICES
PACKAGES GAS TREATMENT
METERING
•
Fuel Gas Systems (for Gas Turbines – Power Generation plants)
•
Process Dehydration Units (Molecular Sieve / Alumina / Silica gel)
•
Catalytic Purification Units
•
Gas Pressure Reducing Stations
2 febbraio 2018
•
| 16
Metering & Analyzer Units (Custody Transfer and Fiscal)
UTILITY •
Electro-Chlorination Systems
•
Sample systems
CDB PRODUCTS & SERVICES
STRAINERS AND STEAM LINE
STRAINERS
STEAM LINE - OTHERS
•
Duplex Basket Strainers
• Steam Separators
•
Tee type Strainers
• Steam Traps
•
Y type Strainers
• Sight Flow Indicators
•
Conical type Strainers
• Forged Manifolds & Trap Station
2 febbraio 2018
| 17
CDB PRODUCTS & SERVICES
PLUG VALVES LUBRICATED STANDARD TYPE
LUBRICATED PRESSURE BALANCED TYPE
•
Manual operated
•
Manual operated
•
Actuated (Pneumatic, Hydraulic, Electric, Electrohydraulic)
•
Actuated (Pneumatic, Hydraulic, Electric, Electrohydraulic)
2 febbraio 2018
| 18
CDB PRODUCTS & SERVICES
2 febbraio 2018
| 19
CDB PRODUCTS & SERVICES
We have extensive experience in cooperating with the major Oil & Gas Companies, EPC Contractors, Engineering firms and OEMs.
OIL&GAS COMPANIES
EPC CONTRACTORS
OEMs
2 febbraio 2018
| 20
CDB APPROVALS CDB is registered and approved at the major Middle East Oil&Gas Companies. KUWAIT
Kuwait Oil Company •
KNPC • • • •
Filtration Units
Process Filters Strainers Steam traps Sight glasses
UAE •
Abu Dhabi National Oil Company
• • • • •
Filtration Systems and Cartridges (for Process) Heater Package - Indirect Fired Fuel Gas Package Coalescers, Separators, Gas Scrubbers Strainers Traps – Steam
SAUDI ARABIA Saudi Electricity Company •
2 febbraio 2018
| 21
Fuel Gas Treatment Packages
Saudi Aramco • •
Filters Strainers
CDB ONGOING PROJECTS Process Filters
HP/LP Fuel Gas Heaters
NIS / GAZPROMNEFT – CB&I
TANAP – WORLEY PARSONS
Serbia - Pančevo
Activated Carbon Adsorber Pkg.
Turkey - TANAP
TAKREER – INTECSA Abu Dhabi – BeAAT
Cartridge and Bag Filters PETRONAS - TECNIMONT Malaysia – RAPID P7 & P27
Export Gas Fiscal Metering, Cartridge Filters DE NOVO ENERGY - EUROTECNICA Trinidad&Tobago – Gas Processing Unit Electrochlorination System
Process Filters
PETROBEL
SAUDI ARAMCO - SAIPEM
Egypt
2 febbraio 2018
| 22
Saudi Arabia – Jazan Project
CDB PRODUCTS PROCESS PACKAGES Bag Filters Tecnimont – Petronas – Rapid Project (Malaysia)
2 febbraio 2018
| 23
CDB PRODUCTS PROCESS PACKAGES Indirect Fired Heaters Worley Parsons – TANAP – Compressors and Metering Stations TANAP (Turkey)
2 febbraio 2018
| 24
CDB PRODUCTS PROCESS PACKAGES Indirect Fired Heaters Worley Parsons – TANAP – Compressors and Metering Stations TANAP (Turkey)
2 febbraio 2018
| 25
CDB PRODUCTS PROCESS PACKAGES Natural Gas Reducing and Metering station Tecnimont – KIMA (Egyptian Chemical Co.) – Ammonia & Urea Plant (Egypt)
2 febbraio 2018
| 26
CDB PRODUCTS PROCESS PACKAGES Natural Gas Reducing and Metering station Tecnimont – KIMA (Egyptian Chemical Co.) – Ammonia & Urea Plant (Egypt)
2 febbraio 2018
| 27
CDB PRODUCTS PROCESS PACKAGES Gas Dehydratation Packages Saipem – Saudi Aramco & Sumitomo – Rabigh II Petrochemical Plant (Saudi Arabia)
2 febbraio 2018
| 28
CDB PRODUCTS PROCESS PACKAGES Gas Dehydratation Packages Saipem – Saudi Aramco & Sumitomo – Rabigh II Petrochemical Plant (Saudi Arabia)
2 febbraio 2018
| 29
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | 3D model Samsung Engineering – Kelar CCPP 500 MW project (Chile)
2 febbraio 2018
| 30
CDB PRODUCTS REFERENCES Fuel Gas System Samsung Engineering – Kelar CCPP 500 MW project (Chile)
2 febbraio 2018
| 31
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | Filtration & Separation Units Samsung Engineering – Kelar CCPP 500 MW project (Chile) – FUEL GAS SYSTEM
2 febbraio 2018
| 32
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | Water Bath Heater Units Samsung Engineering – Kelar CCPP 500 MW project (Chile) – FUEL GAS SYSTEM
2 febbraio 2018
| 33
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | Reducing Units Samsung Engineering – Kelar CCPP 500 MW project (Chile) – FUEL GAS SYSTEM
2 febbraio 2018
| 34
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | Metering Units Samsung Engineering – Kelar CCPP 500 MW project (Chile) – FUEL GAS SYSTEM
2 febbraio 2018
| 35
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | Analyzers units Samsung Engineering – Kelar CCPP 500 MW project (Chile) – FUEL GAS SYSTEM
2 febbraio 2018
| 36
CDB PRODUCTS PROCESS PACKAGES
Samsung Engineering – Letter of appreciation
2 febbraio 2018
| 37
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | Filtration & Separation Units Ansaldo Energia – Tirreno Power – Combined Cycle Power Plant – FUEL GAS SYSTEM (Italy)
2 febbraio 2018
| 38
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | Metering Unit Ansaldo Energia – Tirreno Power – Combined Cycle Power Plant – FUEL GAS SYSTEM (Italy)
2 febbraio 2018
| 39
CDB PRODUCTS PROCESS PACKAGES Gas Purification Unit
2 febbraio 2018
| 40
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | Filtration & Separation Units Siemens – SCOP – Fao Depot Power Generating Units – FUEL GAS SYSTEM (Iraq)
2 febbraio 2018
| 41
CDB PRODUCTS PROCESS PACKAGES Fuel Gas System | Metering, Heating & P. Reduction Units Siemens – SCOP – Fao Depot Power Generating Units – FUEL GAS SYSTEM (Iraq)
2 febbraio 2018
| 42
CDB PRODUCTS PROCESS PACKAGES Fuel Gas Conditioning Skids Renco EPC – Compra Energy S.A. – Neft Dashlari Ph. II (Azerbaijan)
2 febbraio 2018
| 43
CDB PRODUCTS PROCESS PACKAGES Gas Multi-Cyclones Separator Saimexicana – Fermaca – Compressor Station El Encino (Mexico)
2 febbraio 2018
| 44
CDB PRODUCTS PROCESS PACKAGES Gas Multi-Cyclones Separator | View of internals Saimexicana – Fermaca – Compressor Station El Encino (Mexico)
2 febbraio 2018
| 45
CDB PRODUCTS PROCESS PACKAGES Activated Carbon Absorber Petrofac – Petronas – Rapid Project (Malaysia)
2 febbraio 2018
| 46
CDB PRODUCTS REFERENCES Pig launcher / receiver Saipem – IGS project (Underground Gas Storage - Italy)
2 febbraio 2018
| 47
CDB PRODUCTS PROCESS PACKAGES Three-Phase Separator Package Agoco – NAFOORA GOSP 102D (Libya)
2 febbraio 2018
| 48
CDB PRODUCTS PROCESS PACKAGES Electro-Chlorination System Petrobel – Onshore production plant – Port Said (Egypt)
2 febbraio 2018
| 49
CDB FINAL HIGHLIGHTS
Dedicated team of engineers with Consolidated experience in process design.
Financially solid and trustable. Aiming to become long-term partner in your challenging Oil&Gas projects.
Fabrication and assembly facilities. Advanced testing machineries
Committed to support you after the delivery.
2 febbraio 2018
Well balanced clients’ portfolio.
| 50
Providing efficient technical assistance And complete range of site services.
CDB ENGINEERING
Thank you for your attention cdbengineering.com
2 febbraio 2018
| 51