Centrifugal Fans Reference List

Page 1

Sheet 1

CENTRIFUGAL FANS REFERENCE LIST FINAL CUSTOMER/ PLANT

CUSTOMER

YEAR

LOCATION

Snamprogetti

1980 National Fertilizer

Pakistan

Acciaierie di Cornegliano

1980 Acciaierie di Cornegliano

Italy Genova

Ansaldo

1980 Ramagundam/NTPC

India

31/12/2011

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

1

154,7

2,2

217

980

442

Sinter Exhauster

1

261,0

15,7

150

990

4650

Final Fluid Bed Cooler

6

210,3

3,7

146

720

978

3

147,0

6,8

50

740

1233

18

27,3

11,1

275

1480

372

SERVICE

Italsider

1980 Taranto

Italy Taranto

Sinter Exhauster

1

236,0

13,7

160

990

3900

Acciaierie di Cornegliano

1981 Acciaierie di Cornegliano

Italy Genova

Sinter Exhauster

1

333,4

13,2

165

980

5800

Italimpianti

1981 MSC Mobarrakeh Steel Co. Iran

EAF Exhauster

4

293,0

7,1

130

960

3166 3500

Italimpianti

1981 C.S.T. Steel Plant

Brasil

Converter Exhauster

2

109,0

19,3

120

1780

3000

Ansaldo

1982 E.E.A. Power Station

Egypt Gas Recirculation Shoubra El Kheima

6

118,9

4,4

352

740

2715

Enel

1982

Italy Brindisi

Primary Air

8

146,5

19,8

30

1485

3370

Forced Draft

8

331 5 331,5

61 6,1

30

740

2570

1

92,0

10,5

45

990

1089

1

121,0

3,7

150

990

536

10

22,9

17,4

121

1480

515

4

248,0

4,8

50

990

1410

Snamprogetti

Enel Brindisi Sud

1986 Indogulf Fertilizers

India

Ansaldo

1987 Enel

Italy Milazzo

Ansaldo

1987 Farakka/NTPC

India

Primary Air

NOTE

Impeller only

Impeller only


Sheet 2

CENTRIFUGAL FANS REFERENCE LIST

31/12/2011

FINAL CUSTOMER/ PLANT

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Acciaierie di Terni

Italy

Converter Exhauster

1

53,0

17,8

75

1480

1130

1988

India

Exhauster

1

45,5

7,2

350

1485

486

Ilva

1989 Taranto

Italy Taranto

Sinter Exhauster

2

416,0

14,0

160

990

6577

Danieli

1990

Iraq

EAF Exhauster

6

125,6

5,7

130

985

925

Danieli

1990 Aceros de Mexico

Mexico

Gas Exhauster

2

115,6

4,1

65

1180

900

Enel

1990

Italy Bastardo

Induced Draft

2

74,9

3,9

190

980

630

Ilva

1990

Italy y

S.S.S. Secondary Ventilation System

4

208,4

6,6

60

990

1885

Insteam

1990 Chihuahua Energy Division Mexico

Forced Draft

2

60,8

8,8

38

1780

630

Italcementi

1990 Salerno

Italy Salerno

1

69,0

11,5

90

980

909

Italimpianti

1990 C.S.T.

Brasil

LD Converter Exhauster

4

125,0

20,5

70

1780

2920

Siv

1990 S. Salvo

Italy S. Salvo

Tempering Plant

2

20,9

20,0

35

1500

500

Snamprogetti

1990

1

56 0 56,0

12 5 12,5

40

990

840

1

93,0

8,2

150

990

902

CUSTOMER

YEAR

Italimpianti

1987

Polcons Cement Ind.

Ashtar Khor Al Zubair

Power Plant Bastardo

Nagarjiuna g j Fertilizers & Chemicals Kakinada

India

Ansaldo Gie

1991 Chang Shan Power Plant

China

Primary Air

6

26,3

15,1

275

1480

526

Danieli

1991 Talleres Y Aceros

Mexico

Fumes Exhauster

2

88,9

4,0

50

1180

591

Falk

1991

Italy

EAF Exhauster

3

111,2

6,0

15

980

763

NOTE


Sheet 3

CENTRIFUGAL FANS REFERENCE LIST

31/12/2011

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

1991 C.S.T.

Brasil

Fumes Exhauster

2

83,4

5,4

135

1180

530

Termokimik

1991 T.E.K. Power Plant

Turkey

Induced Draft

1

55,6

3,9

150

1480

325

Danieli

1992 Hylsa

Mexico

EAF Exhauster

3

119,2

4,8

125

880

765

Enel

1992

Porto Corsini Power Plant

Italy Porto Corsini

Forced Draft

2

106,0

3,8

25

740

490

Foster Wheeler

1992

Tamoil WHB Collombey

Switzerland

1

87,1

2,6

205

985

284

Idrotermici

1992

Agip Thermal Boiler Porto Marghera

Italy Porto Marghera

1

37,4

7,4

36

1490

347

Iritecna

1992

Sahavary Boiler

Thailand

Combustion Air

3

37,0

13,2

30

1485

580

Snamprogetti

1992

Chemical Fertilizers & Chemicals Gadepan

India

Combustion Air

1

131,6

4,4

150

990

686

Flue Gas

1

84,0

7,5

35

990

725

Combustion Air

1

70,9

7,5

36

990

614

Flue Gas

1

135,6

4,0

200

990

647

1

131 6 131,6

44 4,4

150

990

686

Flue Gas

1

66,8

4,4

980

400

Combustion Air

1

32,9

5,4

1480

250

CUSTOMER

YEAR

Italimpianti

Snamprogetti

1992

FINAL CUSTOMER/ PLANT

Tata Chemicals Babrala

Chambal Fertilizers & Chemicals-Gadepan

Snamprogetti

1992

KTI

1993 Mangalore

India

India India Mangalore

AFS

1993 Trieste

Italy Trieste

Sinter Fume Exhauster

1

93,0

13,2

190

1480

1600

Ansaldo

1993 A.E.M.

Italy

Gas Recirculation

1

42,8

5,7

361

990

357

NOTE


Sheet 4

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

FINAL CUSTOMER/ PLANT

Enel Power Plant Units 1-2 Montalto di Castro

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Forced Draft

2

45,7

7,0

75

985

410

Italy Gas Recirculation Montalto di Castro

4

173,4

8,0

370

740

2260

Saudi Arabia

4

108,0

11,5

50

1180

1470

LOCATION

Ansaldo

1993

Ansaldo

1993 SWCC Desalination Plant

Idrotermici

1993

Super Octanos Jose Edo Ans.

Venezuela

1

50,0

6,5

40

1180

470

Macchi

1993

NIOC Refinery Bandar Abbas

Iran Bandar Abbas

4

47,3

6,2

47

990

358

Snamprogetti

1993 Supermethanol Plant

Combustion Air

1

124,2

5,7

34

900

845

Flue Gas

1

214,8

5,0

170

900

1268

Chlorination

1

4,7

4,8

500

3000

60

Regeneration

1

6,0

4,8

500

3000

60

Italy Trieste

Sinter Fume Exhauster

1

93,0

13,2

190

1480

1600

Snamprogetti

1993 Tupras Izmir Refinery

Venezuela

Turkey Izmir

Forced Draft

AFS

1994 Trieste

CEI

1994

Edison Power Plant Bussi

Italy Bussi

Forced Draft

1

198,0

3,5

15

740

863

Enel

1994

Enel Power Plant Units 1-2 Montalto di Castro

Italy y Forced Draft Montalto di Castro

4

341 0 341,0

77 7,7

30

740

3220

Enel

1994

Enel Power Plant Units 3-4 Montalto di Castro

Italy Forced Draft Montalto di Castro

4

336,3

5,4

30

740

2420

Enichem

1994 Ravenna

Italy Ravenna

1

14,0

7,9

50

2150

136

Iritecna

1994

Agip Petroli

1995 Priolo

Ilva Stockhouse

Italy

Exhauster

3

120,0

4,8

20

990

770

Italy

Gas Recirculation

1

54,0

1,7

360

730

155

NOTE


Sheet 5

CENTRIFUGAL FANS REFERENCE LIST

31/12/2011

FINAL CUSTOMER/ PLANT

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

1995

Enel Power Plant Brindisi

Italy Brindisi

Induced Draft

4

604,9

9,1

125

745

6200

Enel

1995

Enel Experimental Facility S.ta Gilla

Italy S.ta Gilla

Induced Draft

1

66,0

4,2

190

990

326

Italimpianti

1995 Outokumpu

Finland

EAF Exhauster

2

69,0

6,5

120

990

595

Italimpianti

1995

Italy Taranto

Exhauster

4

86,0

9,5

65

985

1000

Krupp Uhde

1995 Qafco III Urea Plant

Qatar

Air Fan

1

80,0

10,5

36

1490

920

Air Fan

1

26,0

4,0

11

1480

118

Air Fan

1

64,0

3,4

42

990

252

Fumes Exhauster

1

121,0

6,3

45

990

875

Fumes Exhauster

1

97,0

3,9

35

990

460

Qatar

Atomization Air

1

16,0

64,6

42

2973

1090

India

Flue Gas

1

111,0

4,6

150

990

620

Combustion Air

1

76 0 76,0

89 8,9

65

990

820

Flue Gas

1

111,0

4,6

150

990

620

Combustion Air

1

76,0

8,9

65

990

820

Flue Gas

1

111,0

4,6

150

990

620

Combustion Air

1

76,0

8,9

65

990

820

CUSTOMER

YEAR

Enel

Ilva Casthouse

Krupp Uhde

1995 Gas Mixing Booster

Larsen & Toubro

1995

Larsen & Toubro

Larsen & Toubro

1995

1995

IFFCO Aonla Ammonia Plant

IFFCO Phulpur Ammonia Plant

NFL Vijaipur Ammonia Plant

India

India

NOTE


Sheet 6

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

Snamprogetti

1995

31/12/2011

FINAL CUSTOMER/ PLANT

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Urea Plant CNTIC-CNCC Hainan

China Hainan

Fumes Exhauster

1

94,0

5,9

44

1490

687

Fumes Exhauster

1

69,0

2,9

34

990

272

Air Fan

1

64,0

8,1

38

1490

718

Air Fan

1

63,0

2,5

38

990

228

Techint

1995

Siderar Casthouse

Argentina

Exhauster

3

70,0

8,2

20

990

665

Techint

1995

Siderar Cowpers

Argentina

Air Fan

2

56,0

11,2

40

990

745

Trafilerie G. Gnutti

1995 Brass foundry

Italy y

Dedusting g

3

90,0

5,5

50

990

571

KTI

1995

Poland Plock

Flue Gas

1

123,7

5,8

145

980

1000

Combustion Air

1

59,4

5,8

980

465

Hydrogen Generation Petrochemia Plock

KTI

1995

FINA Borealis Antwerp

Belgium Antwerp

Flue Gas

1

40,5

2,1

115

1480

132

KTI

1995

AIFC-Bechtel Ibn Rushd Pta & Aromatics

Saudi Arabia Yanbu

Flue Gas

1

32,6

8,1

180

1780

450

Ansaldo Energia

1996

A.E.M. Cassano d'Adda

Italy y Cassano d'Adda

Gas Recirculation

2

59 0 59,0

10 2 10,2

375

990

733

Bharat Heavy Plates & Vessels

1996

NFCL Kakinada Ammonia Plant

India

Flue Gas

1

89,0

5,2

184

990

540

Combustion Air

1

54,0

10,1

140

990

653

Italy

Induced Draft

2

200,0

5,0

200

980

1325

Italy

Combustion Air

1

105,0

2,7

35

990

386

I.S.E.

1996

Nooter Eriksen Ltd

1996

Sondel Recovery boiler

NOTE

320 MW power plant


Sheet 7

CENTRIFUGAL FANS REFERENCE LIST FINAL CUSTOMER/ PLANT

CUSTOMER

YEAR

Snamprogetti

1996 Denox/Desox R.S.U.

USF Smogless

1996

KTI

1996 Mangalore II

R.S.U. Poggibonsi

31/12/2011

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Italy Bolzano

Induced Draft

1

51,7

11,0

180

1450

700

Italy Siena

Induced Draft

2

12,3

16,5

210

1480

250

India Mangalore

Flue Gas

1

66,7

4,4

980

400

Combustion Air

1

32,9

5,4

1480

250

1480

300

Technipetrol

1996

Kwinana Ammonia Plant

Australia

Flue Gas

1

49,7

3,5

Ansaldo Energia

1997

Sisas Pioltello

Italy Pioltello

Forced Draft

1

75,0

9,6

25

1486

840

Ansaldo Energia g

1998 ASM Brescia N.1

Italy Ponti sul Mincio

Gas Recirculation

1

31,5

8,6

300

1485

348

Krupp Uhde

1998

Egypt Abu Qir

Air Fan

1

65,3

10,6

32

1490

792

Air Fan

1

41,6

3,8

32

980

172

Air Fan

1

17,5

4,9

9

1480

106

Fumes Exhauster

1

95,3

6,5

43

990

716

Fumes Exhauster

1

65 5 65,5

46 4,6

31

985

361

Atomization Air

1

13,9

63,0

32

2970

1055

Italy Busto Arsizio

Fumes Exhauster

1

40,3

9,6

135

1490

468

Urea Plant Abu Qir III

TTR Accam Waste Incinerator

Lurgi

1998

Snamprogetti

1998 Supermethanol Plant

Venezuela

Flue Gas

1

234,9

5,3

215

900

1580

Tunga

1998 Steel Plant

Turkey

Sinter Fume Exhauster

1

/

/

200

740

1220

NOTE

With hydraulic coupling


Sheet 8

CENTRIFUGAL FANS REFERENCE LIST

31/12/2011

FINAL CUSTOMER/ PLANT

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

1998

Steel Plant Melting Plant

Turkey

Exhauster

2

/

/

425

980

920

1998

Bechtel/Reliance P.ltd Jamnagar Refiney

India g Jamnagar

Induced Draft

4

90,3

3,5

980

500

Forced Draft

8

42,6

5,9

1480

355

Argentina Bahia Blanca

Induced Draft

5

35,3

1,4

1000

75

Egypt

Flue Gas

2

94,3

4,0

990

500

Combustion Air

2

45,2

4,8

990

310

Italy Ponti sul Mincio

Booster

1

49,1

5,5

410

990

327

Italy Falconara (AN)

Forced Draft

2

47,5

6,4

35

1450

404

France Couvrot

Mill Exhauster

1

230,0

11,5

120

1000

3080 3400

Italy Portoscuso (CA)

Flue Gas

2

165,0

6,9

125

990

1454

Morocco

Cement Mill Bag Filter

1

38,9

7,8

100

960

356

CUSTOMER

YEAR

Tunga Heurtey Petrochemical

DOW / PBB

1998 Ethylene Cracking Furnace

KTI

1998

Midor Refinery Alexandria

ABB Combustion

1998 ASM Brescia N.2

ABB Combustion

1998

Ciments Calcia

1998 Couvrot Cement Plant

Hamon Research

1998

API I.G.C.C. Auxiliary boiler

Eurallumina DeSox Plant

Ciments du Maroc 1999 Agadir

207

Colacem

1999

Cement Plant Sesto Campano

Italy y Sesto Campano

Final Exhauster

1

292 0 292,0

22 2,2

150

525

810

Larsen & Toubro

1999

Syngas Plant - Petronas Gas Berhad

Malaysia

Flue Gas

1

127,0

5,9

141

990

915

Combustion Air

1

87,0

7,4

55

990

773

Primary Air

1

28,4

20,7

40

1480

745 820

Secondary Air

1

11,7

13,9

40

1480

210 250

Foster Wheeler

1999 Lomellina Power CFB boiler

Italy Parona (PV)

NOTE


Sheet 9

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

Macchi

YEAR

1999

FINAL CUSTOMER/ PLANT

Technip-Bechtel ADNOC OGD II

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Induced Draft

1

68,2

11,2

144

990

955 1100

Booster

2

2,4

42,4

53

2950

158 200

Forced Draft

1

57,2

2,3

46

740

167 200

Air intake with inlet silencer and annubar

Forced Draft

2

46,5

9,5

46

1480

536 600

Air intake with inlet silencer

France Blois

Water Saturated Flue Gas

2

16,5

11,7

60

1380

234 260

Casing g rubber lining g Impeller in UranusB6 Silencer in PPH

LOCATION

U.A.E.

NOTE

Alstom

1999 Refuse Incinerator

Macchi

1999

Nodco Refinery Exp. Pr. Steam boiler

Qatar Masaieed

Forced Draft

1

20,2

5,7

48

1480

138 160

Double driver (el.motor+st. turbine)

Macchi

1999

PIM 2 Project Steam Boiler

Indonesia Ace Sumatra

Forced Draft

1

38,1

8,3

37

1480

381 420

Double driver (el motor+st turbine) (el.motor+st.

Macchi

1999

Aspropyrgos Ind. Comp. Steam Boiler

Greece Aspropyrgos

Forced Draft

1

20,7

7,8

47

1480

194 225

Inlet silencer

Techint Italimpianti

1999 Aceralia Aviles

Spain

Combustion Air

4

35,0

13,0

40

1490

539 630

Air intake with inlet silencer

Termomeccanica

1999

Italy Abbiategrasso

Induced Draft

1

9,5

10,1

95

1480

132

Wheel in Uranus-B6 Casing with Glass Flake

Snampro-Techint

1999

Granulator Scrubber Exhauster

2

91,6

5,8

41

1490

641 800

AISI 316L Jacketed shaft

Granulator Fluidization Air

2

62 9 62,9

95 9,5

30

1490

697 800

Inlet filter and silencer

Cooler Scrubber Exhauster

2

79,6

2,9

30

985

310 340

AISI 316L

Profertil Fertilizer Complex - Argentina Urea Bahia Blanca

ABB Combustion

1999

ISE-CTE 2 Rehab.of n.3 B&W Boilers

Italy Taranto

Gas Mixing Booster

3

65,3

6,6

217

990

539 600

ABB Combustion

1999

ISE Taranto

Italy Taranto

Gas Mixing Booster

3

65,0

6,8

217

990

540

ABB Combustion

1999 VP Boiler Fiat Fenice Iveco

Italy Stura (TO)

Combustion Air

1

27,2

6,3

35

1480

225 250


Sheet 10

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

FINAL CUSTOMER/ PLANT

LOCATION

Technip Benelux

2000

LHC-2 & 3 - DOW Benelux The Netherlands Terneuzen

Colacem

2000

Cement Plant Sesto Campano

Schmidhammer

Aster

2000 Waste Incineration Plant

2000

Incineration Plant Cremona 2^ Unit

Italy Sesto Campano

Italy Bolzano

Italy Cremona

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. °C C

SPEED RPM

POWER kW

Regeneration

1

5,9

6,8

513

1480 2950

64 70/80

Flue Gas

16

29,3

2,4

152

980

96 110

Raw Mill

1

65,0

6,0

90

750

492 600

Dust load 30 g/m3 Wear plates

Clinker Cooler

1

183,0

3,6

330

750

880 1000

Dust load 6 g/m3 Wear plates

Kiln

1

140,0

8,3

350

990

1680 2x1000

Dust load 25 g g/m3 Impeller in 13CrMo44 Wear plates

Separator

1

125,0

5,0

90

750

817 1000

Dust load 30 g/m3 Wear plates

Induced Draft

1

51,7

10,3

120

1450

628 700

Induced Draft

2

23,2

11,0

120

1490

350 425

Induced Draft

2

23,2

11,6

120

1485

350 425

Gas Recirculation

1

12,0

5,7

200

1490

97 110

Techint Italimpianti

2001

STAHL Werke Bremen

Germany

Combustion Air

2

30,0

13,5

30

1490

479 550

Tecnimont

2001

Urea Plant Shuaiba

Kuwait

Granulator Fluidization Air

1

85 0 85,0

94 9,4

50

1490

965

Granulator Scrubber Exhauster

1

119,2

7,5

50

1490

1065

First Cooler Fluidization Air

1

81,6

3,9

70

1490

412

Cooler Scrubber Exhauster

1

109,3

6,4

40

1490

885

Induced Draft

6

42,4

3,6

-40 ÷ 190

1200

188 224

DOW Chemical Canada Inc.

2001 LHC1 Hydrogen Plant

Canada Ft Saskatchewan

NOTE Casing in AISI 316L Impeller in Inconel 600 Des.press.4.3 kg/cm2

Casing in Sanicro 28

Air intake with inlet silencer


Sheet 11

CENTRIFUGAL FANS REFERENCE LIST FINAL CUSTOMER/ PLANT

CUSTOMER

YEAR

Termosud

2001 Madinat Yanbu Al-Sinaiyah

31/12/2011

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Saudi Arabia Yanbu

Forced Draft

2

75,0

6,2

50

1190

563

Gas Recirculation

1

119,7

3,4

396

895

580

NOTE

ABB Combustion

2001 Solvay Project

Portugal Povoa

Combustion Air

1

120,0

4,1

43

990

720

Air intake with inlet silencer

Rosetti Marino FIAT Eng.

2001 Cartiere Burgo Verzuolo

Italy Verzuolo

Combustion Air

2

131,0

3,5

15

990

627 700

Air intake

Ciments Calcia

2001 Usine de Cruas

France Cruas

Mill Exhauster

1

47,2

11,0

90

1500

650 2x500

Technip Benelux

2001

France

Induced Draft

1

52,5

1,9

160

1000

160

Air Products Technip BV

2001 Hydrogen Plant

Spain Tarragona

Induced Draft

1

77,4

4,8

170

1500

630

Outlet silencer

Forced Draft

1

38,0

5,6

35

1500

400

Air intake

Combustion Air

2

72,4

12,3

48

1190

1064 1200

Turbine driven

Flue Gas

2

112,8

5,3

143

1190

735 850

Turbine driven

Primary Air

1

10,2

15,7

40

1460

217 250

Secondary Air

1

16 0 16,0

69 6,9

40

1490

139 160

Gas Recirculation

1

8,6

14,0

165

1460

159 200

Primary Air

2

33,0

5,8

30

1490

244 280

Secondary Air

2

15,1

6,2

30

1480

115 132

Gas Recirculation

2

18,0

6,7

210

1490

151 180

Snamprogetti

Fortum

Von Roll Inova

ATOFINA Carling Four de Cracking

2001 3rd Methanol Plant

2001 Biomass boiler

2001 Issy - Les - Moulineaux

Iran Bandar Imam

Italy Cutro

France


Sheet 12

CENTRIFUGAL FANS REFERENCE LIST

31/12/2011

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

2001 Ascometal

France Le Cheylas

Fumes Exhauster

2

83,3

4,1

70 120

1025

550 600

Von Roll Inova

2001

France y Le Cheylas

Fumes Exhauster

2

83,3

4,1

70 120

1025

550 600

Raffmetal

2001 Aluminium Plant

Italy Casto (BS)

Gas Recirculation

1

27,5

2,2

560

1250

90 110

Casing/box in Aisi 3214 Impeller in Avesta 253 MA

Snamprogetti

2002 Ecolombardia 4

Italy Filago (BG)

Fumes Exhauster

1

51,3

9,5

180

1490

579 710

With 12 poles emergency motor

Tecnimont

2002

Kuwait

Granulator Fluidization Air

1

85,0

9,4

50

1490

965

Granulator Scrubber Exhauster

1

119,2

7,5

50

1490

1065

First Cooler Fluidization Air

1

81,6

3,9

70

1490

412

Cooler Scrubber Exhauster

1

109,3

6,4

40

1490

885

Atomization Air

1

13,1

62,0

48

2980

1051

Granulator Scrubber Exhauster

1

103,5

6,0

48

1490

737

Material of casing and impeller AISI 316L

Granulator Fluidization Air

1

74,4

9,6

48

1490

863

Inlet sand filter and bag filter

First Cooler Fluidization Air

1

64 7 64,7

36 3,6

48

1490

309

Inlet sand filter

Cooler Scrubber Exhauster

1

67,8

4,3

35

1490

374

Material of casing and impeller AISI 316L

CUSTOMER

YEAR

Lucchini

Snamprogetti

2002

FINAL CUSTOMER/ PLANT

Urea Plant Shuaiba II

NPC Razi Petroch. Unit - Urea

Iran Bandar Imam

NOTE

Ansaldo Caldaie

2002

Power and Desalination Plant

Oman Barka

Fresh Air

2

227,0

1,1

50

400

378 420

With speed gear reducer

ATS

2002

Termovalorizzazione R.S.U.

Italy Cagliari

Exhauster

1

24,4

12,5

110

1500

363 400

Casing with Glassflake Impeller in titanium

KTI

2002 Syncrude UE-1

Alberta Canada Mildred Lake

Forced Draft

1

56,6

4,0

36

1190

300 335


Sheet 13

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

FINAL CUSTOMER/ PLANT

Phu My Fertiliser Proj. Ammonia Plant

Technip

2002

Cemento Moctezuma

2002 Cerritos Plant

Chiyoda y Co.

2002

Ammonia Urea Complex PIDMCO

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Induced Draft

1

76,9

2,6

250

1190

275 313

Vietnam y Phu My

Flue Gas

1

123,3

4,7

162

990

718

Mexico Cerritos

Kiln

1

165,0

8,4

350

900

1768 2000

Cement Mill

2

72,2

6,4

110

1150

554 650

Raw Mill

1

97,2

5,2

100

900

679 800

Filter Exhauster

1

246,3

3,5

233

980

1040 1200

Fluidization Air

1

131,8

11,5

38

1490

1932 2500

Granulator Scrubber Exhauster

1

185,7

8,6

45

990

1957 2660

First Cooler Fluidization Air

1

116,1

3,3

48

990

517 620

Atomization Air

1

25,3

52,3

48

2980

1490 1820

Cooler Scrubber Exhauster

1

167,0

3,9

35

990

910 1070

Final Cooler Fluidization Air

1

39 6 39,6

40 4,0

9

990

223 240

Italy Granarolo (Bo)

Flue Gas

2

42,2

15,2

130

1490

820 920

Algeria

Exhauster

1

53,9

5,3

50

1490

342 400

LOCATION

Iran Bandar Assaluyeh

TM.T

2002 Incineration RSU

FCB

2002

Hamon Research

2002 Astral Coke Calciner Plant

The Netherlands

Flue Gas

1

205,0

7,9

220

1170

1975 2100

Syrian Arab Republic

2003 Homs Refinery

Syria Homs

Chlorination

2

1,4

4,8

499

2900

12 37

Ferphos j Onk Djebel

NOTE

Double driver: electric motor and steam turbine

Casing with Glassflake lining Impeller in Avesta 2205

Material Inconel 600 Casing des. pr. 3 barG


Sheet 14

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

FINAL CUSTOMER/ PLANT

Cement Plant Ragusa

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Regeneration

2

1,4

5,0

477

2900

12.3 37

Italy g Ragusa

Kiln

1

140,0

8,3

340

990

2000

LOCATION

Colacem

2003

DOW Chemical

2003 Ethylene Cracking Furnace

Texas USA Freeport

Induced Draft

9

47,7

1,6

213

1100

107 150

Kvaerner Heurtey

2003 CO Production Plant

Iran Bandar Imam

Combustion Air

1

33,4

7,5

48

1490

354 400

Flue Gas

1

53,0

5,3

140

1490

340 400

Gas Recirculation

2

125,0

3,9

297

1190

636 700

Forced Draft

1

184,4

13,2

30

1190

2881 3170

Forced Draft

2

61,2

5,0

30

1500

500

Induced Draft

2

89,2

8,6

130

1000

1100

Gas Recirculation

2

16,0

4,8

384

1000

210

Flue Gas

2

155,2

5,2

159

990

967 1100

Atomization Air

2

19 1 19,1

57 0 57,0

42

2980

1246 1400

Granulator Scrubber Exhauster

2

152,2

5,9

42

1490

1137 1260

Granulator Fluidization Air

2

111,3

10,7

42

1490

1395 1550

First Fluid Bed Cooler

2

75,6

4,2

42

990

387 450

Cooler Scrubber Exhauster

2

116,2

3,5

31

990

500 560

Alstom

Ansaldo

SP-TKP Fertilizer

2003

Planta Centro Cadafe

2003 Steam generator

2003

Ammonia Urea Complex PIDMCO

Venezuela

Cyprus Vassilikos

Oman Sur

NOTE

Material Inconel 600 Casing des. pr. 3 barG


Sheet 15

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

Enel Power

YEAR

FINAL CUSTOMER/ PLANT

2003 CFB Boiler

LOCATION

Italy Sulcis

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Final Fluid Bed Cooler

2

37,7

4,1

42

990

185 250

Primary Air

2

94,4

24,9

15

1500

2483 2900

Secondary Air

2

69,0

17,1

15

1500

1298 1500

Induced Draft

2

274,8

10,6

125

1000

3156 3600

Hulliburton KBR

2003 BP Chocolat Bayou

USA Texas

Induced Draft

5

73,4

2,8

164

1180

250 300

Technip-KTI

2003 Takreer

Abu Dhabi

Combustion Air

2

2,4

10,3

46

2980

34 45

Toyo y Eng. g Co.

2003

CCR Platforming Process Unit

Russia Yaroslavl

Regeneration g

1

3,1

9,0

508

2940

41.5 / 11 55 / 22

Macchi

2003

Mellitah Steam boiler

Lybia

Forced Draft

8

108,2

8,4

50

1480

1100 1250

IM.SA.

2004

Raldon di S. Giovanni Lipatoto

Italy Verona

EAF Exhauster

2

88,9

5,0

120

990

560

SAM

2004

Dedusting Line Riva Group

France Montereau

Induced Draft

3

139,0

5,1

100

990

1000

Booster

1

175,0

3,7

250

990

900

Italy y Gioia Tauro (RC)

Flue Gas

2

42 4 42,4

12 6 12,6

183

1490

662 740

France St. Ouen

Induced Draft

3

87,4

10,5

84

1200

1121 1200

Dilution Air

3

32,5

2,6

35

1320

106.5 132

Romania Pitesti

Exhauster

1

84,4

5,2

179

990

624 700

China Baima

Primary Air

2

83,6

30,3

41

1490

2777 3100

TM E TM.E

2004 Incineration RSU

LAB

2004

UIOM Syctom St. Ouen

Thermal oxidation unit Arpechim

Vichem

2004

Alstom

2004 300MW CFB Boiler

NOTE

Impeller Inconel 600 Casing AISI 316Ti Mech. design pr. 4.3 barG

Inlet silencer

SWSI Arrangement Scroll and wheel blades with hard surface material

Rubber lined casing Impeller in Avesta 254 SMO


Sheet 16

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

FINAL CUSTOMER/ PLANT

Cimenterie La Grave de Peille

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Secondary Air

2

86,0

15,2

41

1490

1521 1700

Fluidization Air

5

10,2

61,6

41

2980

700 800

France

Filter Exhauster

1

146,3

4,0

85

970

760 850

Kiln

1

132,1

11,0

370

990

1720 2100

LOCATION

NOTE

Vicat

2004

Cementi Zillo

2004 Fanna

Italy Fanna

KTI

2004 Sterling Chemical

USA Induced Draft Texas, Texas City

1

69,8

4,0

174

1190

334 375

Methanol Casale

2004 Toaz Methanol

Rusia Togliatti

Induced Draft

1

188,8

4,4

200

990

1030 1160

Double driver steam turbine + electric motor

Forced Draft

1

99,7

4,9

26

990

580 670

Double driver steam turbine + electric motor

Russia Novokuznetsk

Combustion Air

2

34,1

13,2

20

1490

560 630

Gonfreville France

Forced Draft

2

30,7

5,3

36

1480

212 250

Induced Draft

2

56,1

4,6

150

1480

318 355

Spain Malaga

Kiln

1

169,5

7,5

340

1000

1560 2250

Techint Italimpianti

2004

Technip Benelux

2004 SMR Total

Walking beam Furnace for Blais

CBMI

2005 Raw Mill and Burning Line

Technip KTI Technip-KTI

2005

Sohar Refinery y Hydrogen Reformer

Oman

Induced Draft

1

142 8 142,8

46 4,6

170

1480

827 950

Technip KT India

2005 Hydrogen Reformer

Oman Sohar

Flue Gas

1

142,8

4,4

170

1480

827 950

Alstom

2005

Saudi Arabia Shoaiba

Forced Draft

6

195,6

5,5

50

1180

1454 1650

Induced Draft

6

301,9

7,2

165

890

2592 2850

Gas Recirculation

6

80,9

2,9

354

1140

357 410

Shoaiba Stage II Phase 1

Mech. design 450째+Turning gear


Sheet 17

CENTRIFUGAL FANS REFERENCE LIST

31/12/2011

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

2005 Centre Multifilieres d'Ivry

France Argenteuil

Induced Draft

4

109,6

5,1

287

1480

682 750

LAB

2005 AAFSA

Algeria Ain El Kebira

Induced Draft

2

208,3

3,6

240

1000

965

Alstom

2005 CPCU St. Ouen

France St. Ouen

Forced Draft

2

53,6

4,0

40

1000

260

SET

2005

Israel Gezer Talon

Vapour Recompression

3

15,3

26,0

100

2980

465 630

Casing AISI 316 Impeller in duplex steel

Vapour Recompression

3

7,7

26,0

100

4000

235 315

Casing AISI 316 Impeller in duplex steel

Bangladesh

Main Air Blower

1

7,5

47,0

70

2980

425 525

Impeller in duplex steel

Bahrain

Induced Draft

1

231,0

1,5

200

990

909 1040

Kazakhstan

Forced Draft

3

118,0

8,9

45

1490

1272 1450

France Provence

Induced Draft

1

118,6

8,9

230

990

1226 1350

Forced Draft

2

63,0

5,1

27

990

401 450

Pressurization

1

2,4

33,4

50

3550

110 150

Recirculation

1

51 5,1

71 4 71,4

50

3560

2 x 220 2 x 250

Spain Tarragona

Forced Draft

1

46,5

7,7

92

1490

488 560

CUSTOMER

YEAR

LAB

FINAL CUSTOMER/ PLANT

Blowdown treaatment concentration unit

Bangladesh Fertilizers

2005

Technip p

2005 Bapco Hydrogen

Macchi

2005

KTI

2005 Total Raffinerie de France

Uhde

2005

180-210 TPD Sulphuric Acid Plant

Kashagan Kco Agip

SAFCO - Urea Formaldeide Plant

Saudi Arabia Al Jubail

Foster Wheeler

2005 Dow Chemical

Chiyoda Co.

2005

Das Gas y Unit Sulfur Recovery

U.A.E. Abu Dhabi

Acid Gas

1

8,5

36,0

38

2980

360 500

LAB

2005

UIOM Burgoin Jallieu

France Burgoin Jallieu

Induced Draft

1

41,2

11,4

167

1500

585 630

JSW Steel

2005

Jindal Steel Sinter Plant

India Vijayanagar

Dedusting

1

96,0

2,5

70

750

350

NOTE

With inlet silencers materials for -40째C

Inlet cartridges filter

Two fans in serie

Gastight 3.5 barG des. pr. Casing AISI 316, impeller duplex John Crane mechanical seal

Vautid wear plates


Sheet 18

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

LAB

2005

31/12/2011

FINAL CUSTOMER/ PLANT

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Centre Valorisation Energetique

France Argenteuil

Induced Draft

1

56,0

13,9

167

1500

920 2x550

Double driver - Electric motors

Induced Draft

1

31,2

14,5

163

1500

550 2x350

Double driver - Electric motors Impeller in duplex steel

NOTE

Kutch Chemicals Ind.

2005

360 TPD Sulphuric Acid Plant

Gandhidham India

Startup Blower

1

8,3

24,5

70

2980

259 315

Dow Chemical

2006

LHC-7 New Furnaces

USA Freeport - Texas

Induced Draft

5

70,9

1,0

200

890

107 150

Lurgi Lentjes

2006 Moneypoint

Ireland Moneypoint

Booster

3

513,1

7,5

80

745

4381 4850

Enel Power

2006

Centrale di Fusina FGD

Italy Fusina (VE)

Booster

1

562,3

7,0

55

742

4683 5250

Alstom

2006

Shoaiba Stage II Phase 2

Saudi Arabia Shoaiba

Forced Draft

6

195,6

5,5

50

1180

1454 1650

Induced Draft

6

301,9

7,2

165

890

2592 2850

Gas Recirculation

6

80,9

2,9

354

1140

357 410

Forced Draft

1

199,6

5,5

42

970

1330

Driven by steam turbine

Induced Draft

1

340,0

5,5

134

970

2235

Driven by steam turbine

Forced Draft

2

73 5 73,5

36 3,6

35

990

338

Induced Draft

2

164,4

3,1

172

740

632

Secondary Air

2

47,6

4,9

215

1480

306

MAN Ferrostaal

Sotramon

2006 Oman Methanol Plant

2006

C.T. Savannah Bagasse/Coal P.S.

Oman

Mauritius Isalnd Port Louis

Technip

2006

Equate II Ethylene

Kuwait Shuaiba

Induced Draft

1

40,3

1,5

138

1000

81 100

Foster Wheeler

2006

Lomellina II Power CFB boiler

Italy Parona (PV)

Primary Air

1

21,2

16,6

25

1480

432 500

Rubber lined casing Impeller in superduplex

Mounted on spring isolators


Sheet 19

CENTRIFUGAL FANS REFERENCE LIST FINAL CUSTOMER/ PLANT

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Qatargas II - Onshore Pr. LNG Trains 4 & 5

Qatar Ras Laffan

Incineration Air

4

43,0

24,2

49

1480

1245 1400

Italy g Torrevaldadiga

Induced Draft

12

254,3

13,6

120

990

3596 4000

India Kota - Rajasthan

Induced Draft

1

52,5

4,2

150

1480

271 355

CUSTOMER

YEAR

Technip Italy Chiyoda Co.

2006

Enel Power

2006 Torrevaldadiga Nord

Shriram Fertilisers 2006

31/12/2011

Feedstock Conversion Project

NOTE

Double driver st. tubine + e. motor Intake with Venturi and structure

Nem Hengelo

2006 Sohar Fertilizer project

Oman Sohar

Forced Draft

1

54,5

6,1

48

1480

409 450

Polysius

2006 Bastaver

Turkey

Kiln

2

117,5

7,7

300

1000

1068 1200

Larsen & Toubro

2006

India Panipat

Induced Draft

1

52,8

1,0

180

740

76 110

Operated by VFD and damper

Induced Draft

6

87,9

1,4

180

710

175 200

Operated by VFD and damper

Raw Mill

1

333,3

11,6

95

890

4730 5200

Kiln

2

158,9

8,5

350

890

1680 1900

Baghouse

2

225,6

3,6

169

872

958 1200

Finish Mill

1

222,2

7,4

95

1180

1890 2100

Buzzi USA

IOCL-Panipat Naphta Cracker

2007 Cement

USA St. Louis

Stone & Webster

2007

Sharq q 3rd Expansion p Ethylene Project

Saudi Arabia Jubail

Induced Draft

8

82 7 82,7

18 1,8

203

890

210 250

Babcock Power Services

2007

Sunoco Girard Point Refinery

USA PA, Philadelphia

Forced Draft

1

63,7

21,5

52

1800

1553 1700

Forced Draft

1

63,7

21,5

52

1800

1553 1700

Air Blower

2

1,6

62,8

50

3000

159 200

Air Intake - Blowoff Discharge silencer

Recycle Gas

2

7,3

31,4

158

3000

278 315

Steam tracing system

Equate Petrochem. Co.

2007

DOW/PIC OL2K Ethylene Project

Kuwait Shuaiba


Sheet 20

CENTRIFUGAL FANS REFERENCE LIST

31/12/2011

FINAL CUSTOMER/ PLANT

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

2007

Habshan Gas Expansion Project

U.A.E. Habshan

Incinerator Air

6

20,2

26,6

58

3000

657 750

2007

Ras Laffan LNG Project

Qatar Ras Laffan

Forced Draft

3

93,8

9,1

49

1480

1040 1275

Gas Recirculation

3

41,2

7,7

375

1480

389 450

CUSTOMER

YEAR

Fluor MidEast Macchi

Technip Italy Chiyoda Co.

2007

Qatargas II - Onshore Pr. LNG Trains 4 & 5

Qatar Ras Laffan

Incinerator Air

8

24,7

21,8

49

1500

715 1400

LV Europe

2007

Ciment Djouad Tahar Hamma Bouziane

Constantine Algerie

Raw Mill

1

90,3

6,9

125

990

790 850

JSW Steel

2007

Sinter Plant Jindal Iron & Steel Co.

India Toranagallu

Sinter Waste Gas

1

324,0

17,0

160

1000

6517 8000

Enel

2007 AMIS

Italy y

Gas Blower

10

3600

Air Blower

10

3600

Foster Wheeler

2007

Rabigh Refinery Hydrogen Reformer

Saudi Arabia Rabigh

Induced Draft

2

80,8

1,3

187

900

185 76

Ansaldo Caldaie

2007

Shiaibah IWPP Crude Oil Boilers 600 MW

Saudi Arabia

Forced Draft

6

337,0

11,9

44

1190

4671 5000

Booster

6

495,0

3,2

175

715

2268 2450

Gas Recirculation

6

55 2 55,2

36 3,6

231

1190

231 260

Spain Puente Nuevo

Booster

1

576,0

4,9

130

745

3635 4000

Saudi Arabia Al Jubail

Forced Draft

1

70,5

8,1

50

1180

735 815

Induced Draft

1

108,0

4,7

150

1180

640 710

Forced Draft

1

65,6

6,3

45

990

495 560

Enel - Viesco DeSox

Idreco

2007

Larsen & Toubro

2007 Methanol & Co.

Alstom

2007 CyCo Fos

France Fos sur Mer

NOTE

Air intake, discharge silencer, blowoff

Fully wear lined impeller

Munted on vibration isolator springs


Sheet 21

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

FINAL CUSTOMER/ PLANT

Robilante Reparto Forno 3

Buzzi

2007

Larsen & Toubro

2007 Jayprakash Siddhi Cement

Irasco

Enel

2007 Khorasan

2007 Brindisi Sud

Polysius

2008 Mombassa Cement

KTI

2008

Technip

Colacem

JGC/KBR/Shell Pearl Unit 5100 - Methanol

2008 IOCL-Haldia

2008 Cementeria di Caravate

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Induced Draft

1

157,0

5,5

125

990

990 1100

Gas Recirculation

1

37,4

6,6

273

1480

302 400

Italy Robilante

Kiln

1

70,1

7,5

430

1200

1000

India Gujarat

Kiln

1

115,8

6,9

290

980

1200

Kiln

1

82,0

5,2

294

980

650

Cooler Exhauster

1

170,0

1,5

320

740

350

Main Air Blower

1

57,7

21,0

25

1490

1523 1700

Ejector Stack Fan

1

95,3

10,3

25

1480

1233 1700

Booster

6

1067,0

8,2

50

582

5700

Rotor

Gas Recirculation

2

164,0

7,7

370

740

2750

Rotor

Kenia

Preheater

1

145,3

6,5

320

990

1400

Qatar Ras Laffan

Forced Draft

2

202 5 202,5

60 6,0

43

990

1528 1700

Lube Oil Unit API 614

Induced Draft

2

307,4

7,3

240

990

3562 4000

Lube Oil Unit API 614

Forced Draft

1

67,9

7,4

44

990

605 800

Induced Draft

1

137,1

5,4

170

990

925 1100

Kiln

1

135,8

8,8

320

970

2500

LOCATION

Iran

Italy Brindisi

India Haldia

Italy

NOTE


Sheet 22

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

FINAL CUSTOMER/ PLANT

1 x 120 MW Steam Generator

Ansaldo Caldaie

2008

Irasco

2008 Khorasan

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Grate Cooler

1

183,3

3,6

330

750

1000

Separator

1

125,0

4,5

130

750

1000

Cement Mill

1

83,3

6,5

95

980

1000

Panama Bahia Las Minas

Forced Draft

1

131,4

6,0

35

1185

939 1050

Iran

Main Air Blower

1

63,2

10,1

25

1490

1690 1900

Ejector Stack Fan

1

100,3

21,0

25

1480

1221 1700

LOCATION

Punjj Lloyd y

2008 IOCL-Haldia

India Haldia

Forced Draft

1

67,9

7,4

44

990

605 710

Hera

2008 Modena Incination Plant

Italy

Fumes Exhauster

1

112,1

12,0

200

1490

1607 1800

Irasco

2008 Ghadir

Iran

Main Air Blower

1

63,2

10,1

25

1490

1690 1900

Ejector Stack Fan

1

100,3

21,0

25

1480

1221 1700

Induced Draft

4

102,2

10,3

180

1190

1307 1450

KTI

2008 Pkrt Lotos SRV Unit

Poland Gdinsk

Recycle Gas

1

18 1,8

20 0 20,0

40

2970

62 90

Alstom

2008 Total Raffinerie de France

France Lacq

Booster

1

6,2

29,7

256

2980

160 200

Ansaldo Caldaie

2008

Egypt El Tebbin

Forced Draft

4

194,2

11,4

50

990

2616 2900

Gas Recirculation

4

51,2

3,0

380

990

375 670

Kiln

1

162,0

8,3

350

853

2800

Cementos Monteczuma

2x350 MW Gas/Oil Units El Tebbin Power Plant

2008 Apazapan

Mexico

NOTE

Double mechanical seal with purge panel Steam tracing


Sheet 23

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

FINAL CUSTOMER/ PLANT

LOCATION

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Filter Exhauster

1

221,7

2,6

235

980

1200

NOTE

Dyckerhoff

2008 Volyn Cement

Ukraine

Finish Mill

2

222,2

8,8

87

1108

2600

Cimalux

2008 Esch-Sur-Alzette

Luxenburg

Filter Exhauster

1

126,7

9,8

92

1000

1600

Humbold Wegad

2008 Jaypee Himachal

India

Preheater

2

163,2

8,0

270

985

2000

Ansaldo Caldaie

2009

Panama Bahia Las Minas

Primary Air

1

49,1

13,0

35

1780

764 850

Induced Draft

1

174,8

4,5

150

890

1454 1600

Forced Draft

1

239,3

6,3

27

965

1815 2070

Steam turbine driven Inlet sand traps

Induced Draft

1

423,9

5,3

195

940

2673 3000

Steam turbine driven Dual driver electric motor + steam turbine

GS Eng.&Constr. g

1 x 120 MW Steam Generator

2009 Salalam Methanol

Oman Salalam

Snamprogetti Saipem

2009 Engro Chemical

Pakistan Daharki

Flue Gas

1

239,5

11,3

165

990

3200 3800

Dyckerhoff

2009 Akbulak

Russia

Finish Mill

2

222,2

8,8

87

1108

2600

Dyckerhoff

2009 Volyn Cement

Ukraine

Kiln

2

209,0

12,5

135

1000

4000

Filter Exhauster

2

461 0 461,0

49 4,9

139

790

3000

Kiln

2

209,0

12,5

135

1000

4000

Filter Exhauster

2

461,0

4,9

139

790

3000

Smoke Gas

1

175,3

10,7

300

980

2730

Smoke Gas

1

105,8

8,0

300

980

1232

Dyckerhoff

Larsen & Toubro

2009 Akbulak

2009 Gujarat Anian Cement

Russia

India


Sheet 24

CENTRIFUGAL FANS REFERENCE LIST FINAL CUSTOMER/ PLANT

CUSTOMER

YEAR

Macchi

2009 Das Island

Heurtey Petrochemical

2009

Macchi

Snamprogetti p g

Snamprogetti

IOCL Gujarat Refinery

2009 ExxonMobil

2009

2009

Ammonia 5 & 6 QAFCO Fertilizer Complex

Urea Plant 5 QAFCO Fertilizer Complex

31/12/2011

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Abu Dhabi

Forced Draft

2

118,8

8,8

48

1450

1379 1550

India j Gujarat

Forced Draft

1

77,6

10,5

46

1490

977 1100

Induced Draft

1

133,8

6,1

159

990

1015 1150

Forced Draft

2

64,0

9,3

35

1480

709 800

Combustion Air

3

12,8

81,2

43

2980

1175 1300

Air Blower

2

2,6

73,2

43

2980

293 400

Combustion Air

2

100,4

8,9

49

990

1112 1300

Flue Gas

2

152,2

5,5

150

990

1081 1300

Granulator Fluidization Air

1

166,1

11,7

49

990

2431 2700

Intake with sand filter, chiller, separator & silencer

Granulator Scrubber Exhauster

1

231,3

6,2

44

990

1757 2000

Material of casing and impeller AISI 316L

Singapore

Qatar

Qatar

Humbold Wegad

2009 JSW Cement

India

Filter Exhauster

1

352,8

4,0

220

970

2000

Heurtey y Petrochemical

2009 Taneco Hydrogen Unit

Russia Tartastan

Forced Draft

2

84 2 84,2

79 7,9

28

1000

860 1000

Induced Draft

2

160,0

5,4

148

1000

1110 1250

Main Air Blower

1

63,2

21,0

25

1490

1690 1900

Ejector Stack Fan

1

100,3

10,1

25

1490

1281 1700

Combustion Air

1

71,7

11,0

40

980

910 1000

Irasco

Larsen & Toubro

2009 Arfa

2009

Mangalore Ref. (MRPL) Hydrogen Unit

Iran

India Mangalore

NOTE

One driven by turbine + e.m. One driven by turbine only Discharge blowoff Noise Hood Four stage Intake & discharge blowoff Noise hood

Steam turbine driven


Sheet 25

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

YEAR

FINAL CUSTOMER/ PLANT

Tecnimont

2010 Biomass Waste to Energy

Irasco

2010

Enel

2010 AMIS

Alstom

PIDEC

Irasco

2010

2010

2010

EAF/Dry Limestone MSC Mobarakeh

Shoaiba Stage III Phase 1

PIDMCO 3rd Ammonia & Urea

Shahid Kharrazi Direct Reduction Project

CTCI Ta-Lin RFCC Complex

Foster Wheeler

2010

Technip KTI

2010 3RD Ammonia Urea

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Flue Gas

1

137,7

8,1

162

980

1265 1400

Italy Olevano

Induced Draft

1

70,0

9,2

130

1490

750 900

Iran Mobarakeh

Induced Draft

4

55,6

5,9

104

990

399 450

Italy

Gas Blower

10

3600

Air Blower

10

3600

Forced Draft

6

195,6

5,5

50

1180

1454 1650

Induced Draft

6

301,9

7,2

165

890

2592 2850

Gas Recirculation

6

80,9

2,9

354

1140

357 410

Spouting Air

1

53,7

6,0

44

1490

560

Fluidizaing Air

1

222,8

6,6

44

990

2500

Dust Scrubber Exhauster

1

441,9

2,6

35

595

1850

Product Cooler Air

1

148 3 148,3

40 4,0

44

990

1050

Main Air Blower

2

115,0

22,9

41

1490

3115 3500

Ejector Stack Fan

2

198,0

8,9

41

1490

2225 2500

Taiwan Ta-Lin Kaohsiung

Forced Draft

2

92,7

17,7

37

1190

2100

N.1 Motor driven N.1 Turbine driven

Iran Shiraz

Forced Draft

1

131,3

5,9

25

1480

965 1100

Air intake Steam turbine driven

LOCATION

Saudi Arabia Shoaiba

Iran Shiraz

Iran

NOTE

Steam turbine driven


Sheet 26

CENTRIFUGAL FANS REFERENCE LIST CUSTOMER

SES Tlmace

Snamprogetti

Ascotec

Grico

YEAR

2010

2010

2010

FINAL CUSTOMER/ PLANT

Steam Generator RNEST Suape Complex

Urea Plant 6 QAFCO Fertilizer Complex

Foulad Saba Direct Reduction Pr. MME

2010 Bafgh Steel

Raffmetal

2010 Aluminium Plant

Kribhco

2011

JSW Steel

N.2 2 2011 Pellet Plant N

Ammonia-Urea Plant KBR / PDIL

31/12/2011

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Induced Draft

1

219,6

4,5

146

980

1200 1450

Forced Draft

2

115,8

4,2

40

1075

587 650

Dual driver electric motor + steam turbine

Flue Gas

2

209,4

5,3

210

890

1377 1550

Dual driver electric motor + steam turbine

Granulator Fluidization Air

1

166,1

11,7

49

990

2431 2700

Intake with sand filter, chiller, separator & silencer

Granulator Scrubber Exhauster

1

231,3

6,2

44

990

1757 2000

Material of casing and impeller AISI 316L

Main Air Blower

1

115,0

22,9

41

1490

3115 3500

Ejector j Stack Fan

1

198,0

8,9

41

1490

2225 2500

Main Air Blower

1

57,1

20,4

45

1490

1600

Ejector Stack Fan

1

104,1

20,4

45

1490

2900

Italy Casto (BS)

Gas Recirculation

1

27,5

2,2

560

1250

90 110

India Hazira

Flue Gas

2

185,7

6,4

135

1238

1409 1600

India Toranagallu

Cooling Air

1

357 0 357,0

87 8,7

25

990

3773 4150

Windbox Recuperation Fan

1

311,5

8,2

215

575

3111 3700

Fully wear lined impeller Turning gear

Updraft Drying Fan

1

342,4

8,0

274

600

3363 3700

Fully wear lined impeller Turning gear

Windbox Exhaust Fan

1

269,6

10,8

132

990

3564 3950

Fully wear lined impeller Turning gear

Hood Exhaust Fan

1

344,4

3,5

84

600

1605 1800

Fully wear lined impeller

LOCATION

Brazil Pernambuco

Qatar

Iran

Iran

NOTE

Steam turbine driven

Casing/box in Aisi 3214 Impeller in Avesta 253 MA Driven by steam turbine


Sheet 27

CENTRIFUGAL FANS REFERENCE LIST FINAL CUSTOMER/ PLANT

CUSTOMER

YEAR

Irika

2011 Persian Gulf Saba

Technip KTI

KTI

2011

2011

Jubail Export Refinery Pr. Total/Aramco

Jubail Export Refinery Pr Pr. Total/Aramco

31/12/2011

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Iran

Ejector Stack Fan

4

164,9

9,1

50

1490

1870 2100

Main Air Blower

1

95,9

23,4

50

1490

2935 3400

Forced Draft

2

100,0

5,5

47

1180

749 900

Induced Draft

2

184,4

5,0

150

1180

1118 1250

Forced Draft

2

49,6

7,1

47

1800

419 465

Induced Draft

1

67,4

3,0

149

900

239 265

Saudi Arabia Al Jubail

Saudi Arabia Al Jubail

NOTE

Forced lube oil system Airfoil venturi Pulse jet filter

Forced feed lube oil unit

Pulse jet filter

2011

Ammonia Plant KBR / AEGIS / Essar

India Panagarh

Flue Gas

1

243,2

8,1

180

990

2390 2700

Dual driver electric motor + steam turbine

SK Eng. & Constr. 2011

Ruwais Refinery Exp. Takreer

U.A.E. Abu Dhabi

Forced Draft

2

104,4

8,2

40

1480

1300

Sand trap Lube oil system

Induced Draft

2

193,9

5,9

145

1280

1600

Lube oil system

Combustion Air

3

6,6

70,9

50

2980

602 1000

Double stage

Forced Draft

1

62,4

6,6

48

1480

531 650

Induced Draft

1

94 2 94,2

72 7,2

135

1485

865 960

Matix

Larsen & Toubro

2011

GNFC Ammonia Syngas Generation

India Gujarat

Callidus Technologies

2011

Qatargas Plateau Maintenance Project

Ras Laffan Qatar

Combustion Air

2

52,9

8,3

49

1490

550 630

Petrochem

2012

Ruwais Refinery Exp. Takreer

U.A.E. Abu Dhabi

Combustion Air

4

83,3

11,4

48

1490

1166 1300

Heurtey Petrochemical

2012

OMPL Aromatic complex

India Mangalore

Forced Draft

2

30,7

3,5

38

1450

152 200

Variable speed by hydraulic coupling

Induced Draft

1

58,1

19,0

238

950

169 210

Variable speed by hydraulic coupling

Complete intake system with sand filters One driven by e. motor One driven by turbine only Intake with sand filters


Sheet 28

CENTRIFUGAL FANS REFERENCE LIST

31/12/2011

FINAL CUSTOMER/ PLANT

LOCATION

SERVICE

#

CAPACITY m3/s

ST. PRESS. kPa

TEMP. 째C C

SPEED RPM

POWER kW

Exxon Mobil Waste heat boiler

UK Fawley Refinery

Induced Draft

1

79,5

2,3

182

962

215 250

2012 MAA Refinery

Kuwait

Forced Draft

2

61,0

9,2

55

1720

682 750

LAB

2012 Waste Incineration Plant

UK Staffordshire

Induced Draft

2

58,6

5,4

154

1530

410 500

Alstom

2012

Yanbu II Power & Water Project

Saudi Arabia Yanbu

Aeration

5

68,3

23,4

50

1780

2075 2500

Macchi

2012 Barzan Onshore Project

Qatar Ras Laffan

Forced Draft

4

84,0

9,8

49

1480

1100

SK Eng. & Constr. 2012 Wasit Gas Plant

Saudi Arabia Wasit

Combustion Air

8

34,7

21,9

49

1790

937 1150

Alstom

Estonia Narva

Fluidization Air

5

8,9

63,5

45

2980

686 780

CUSTOMER

YEAR

Verga engineering

2012

Pensotti

2013 300 MW CFB Boiler

NOTE

Variable speed by hydraulic coupling


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.