Earthlinks Fellowship Project Cole Giesler and Morgan Stackman
Where is
? Earthlinks
5
Federal Blvd
I-2
New Site
Colfax ave
er
e Sp d Blv
US-6
Garage Building
Garage Building
Garage Building
Garage Building
House (to be demolished)
2nd Building (to be demolished phase 2)
Corner Building (to be demolished Phase 3)
Corner Building
Site Plan Process
Site Plan Process
Site Plan Process
DECATUR STREET
13TH AVE
Site Plan Process
DECATUR STREET
13TH AVE
Site Plan Process
DECATUR STREET
13TH AVE
Site Plan Process
DECATUR STREET
13TH AVE
Site Plan Process
N
Site Plan Process
Site Plan Process
Site Plan Process
Site Plan Process
Site Plan Process | Parking
Site Plan Process | Parking and Ground Beds
Site Plan Process
<-- Drive in for drop oďŹ&#x20AC;s
Future Trellis
Garage Design Process
Garage Design Process
Garage Design Process
Phase 1 Plan
N
Phase 2 Plan
N
Corner Building Facade Design Options
Corner Building Facade Design Options
Corner Building Facade Design Options
Corner Building Facade Design Options
Garage Final Design NEW SMALLER INSULATED GARAGE DOOR WITH WINDOW STRIP
DRAINBOARD SINK
HOSE BIB
CLEANING FRUIT/VEG
INFILL BLOCK PEEP HOLE REF.
FUTURE TRELLIS
STORING FRUIT/VEG, F.B.O.
LADDER, F.B.O. INSTALLED BY CONTR.
TOILET 107 52 SF
SHELVES, F.B.O
INTERIOR PLUMBING WALL, 9' HEIGHT
FURNITURE F.B.O., TYP. COAT HOOKS (20)
PATCH HOLE PHONE
TOILET
BUILT IN TABLE
106 52 SF
SINK, F.B.O.
WATER HEATER INVERTER ABOVE WATER HEATER INTERIOR PLUMBING WALL, 9' HEIGHT
REF.
DW
102 1085 SF
CHAIR STORAGE
F.B.O.
SOAP
REF.
STOVE, F.B.O.
SHELVES, F.B.O
108 13 SF
104 30 SF
WORKSHOP / KITCHEN
BUILT IN BENCH (OPENS WITH STORAGE INSIDE)
REPLACE WINDOWS, TYP. ROLLER SHADES WITH REFLECTIVE BACKING, TYP.
PANTRY
FOOD
OVERHEAD SOFFIT
LOCKING CLOSET
SHELF, F.B.O.
WOODSHOP 103 56 SF WOOD STORAGE SHOP EQUP., F.B.O.
SOAP DRYING (UNDER)
SHOP EQUP., F.B.O.
MOVE OUTSIDE OR INSIDE
NEW INSULATED GARAGE DOOR WITH WINDOW STRIP
BROOM CLOSET
2 BURNER STOVE TOP HOSE BIB
PEEP HOLE
TAKE OUT EXISTING GARAGE DOOR, ADD WINDOWS
N
Garage Final Design
5' ‐ 0"
COAT HOOKS
2' ‐ 11 11/16"
1
A1 A2
ENTRY WALL 1/2" = 1'‐0"
10' ‐ 0"
8' ‐ 11 3/16"
2' ‐ 11 5/8"
9' ‐ 4"
Garage Final Design
7' ‐ 0"
1' ‐ 8 1/2"
9' ‐ 0" 1' ‐ 6" 3' ‐ 0"
2' ‐ 9 1/2"
HALF STOVE TOP
7' ‐ 0"
1' ‐ 8 1/2"
9' ‐ 0"
2' ‐ 6"
HOOD
2' ‐ 6"
MICROWAVE
11' ‐ 0 19/32"
2
A1 A2
KITCHEN ELEVATION 1/2" = 1'‐0"
2' ‐ 6 1/8"
1' ‐ 9"
2' ‐ 5 1/2"
6' ‐ 5"
4' ‐ 3 1/2"
3
A1 A2
WOODSHOP 1/2" = 1'‐0"
1' ‐ 8 1 2' ‐ 9 1/2"
5' ‐ 0"
Garage Final Design 2' ‐ 11 11/16"
1
10' ‐ 0"
8' ‐ 11 3/16"
2' ‐ 11 5/8"
9' ‐ 4"
ENTRY WALL
A1 A2
1/2" = 1'‐0"
11' ‐ 0 1/4"
2' ‐ 9 1/2"
1' ‐ 4"
12' ‐ 0 1/2"
BACK WALL 1/2" = 1'‐0"
MIRROR
SOAP PAPER
‐ 6"
4
A1 A2
3' ‐ 9 3/4"
11' ‐ 0 19/32"
2
2' ‐ 6 1/8"
1' ‐ 9"
2' ‐ 5 1/2"
6' ‐ 5"
4' ‐ 3 1/2"
3
KITCHEN ELEVATION
A1 A2
1' ‐ 8 1/2"
7' ‐ 0"
1' ‐ 6"
7' ‐ 0"
9' ‐ 0"
Garage Final Design
3' ‐ 0"
HALF STOVE TOP
1/2" = 1'‐0"
A1 A2
WOODSHOP 1/2" = 1'‐0"
SHELVING UNIT, F.B.O.
1' ‐ 5"
2' ‐ 9 1/2"
1' ‐ 8 1/2"
WOOD STORAGE
4' ‐ 11 7/8"
2' ‐ 9" CHAIR STACK
5
A1 A2
WINDOW WALL 1/2" = 1'‐0"
10' ‐ 8" UPHOLSTERED BENCH WITH STORAGE
8' ‐ 0"
1' ‐ 5 1/2"
2' ‐ 0 1/2"
SHELF
7' ‐ 0"
7' ‐ 1 1/2"
2' ‐ 9 1/2"
1' ‐ 4"
11' ‐ 0 1/4"
12' ‐ 0 1/2"
Garage Final Design
4
3' ‐ 9 3/4"
BACK WALL 1/2" = 1'‐0"
2' ‐ 9 1/2"
A1 A2
PAPER TOWEL 2' ‐ 9 1/2"
12' ‐ 0 1/2"
SOAP
MIRROR
3' ‐ 9 3/4" 2' ‐ 5"
4
6
BACK WALL
A1 A2
1/2" = 1'‐0"
107 TOILET‐EAST 1/4" = 1'‐0"
7
A1 A2
8
107 TOILET‐SOUTH 1/4" = 1'‐0"
A1 A2
107 TOILET‐WES 1/4" = 1'‐0"
1' ‐ 8 1/2"
7' ‐ 0"
SOAP
MIRROR
6" 1' ‐ 6"
PAPER TOWEL
6' ‐ 5"
2' ‐ 9"
2' ‐ 9 1/2"
7' ‐ 0"
9' ‐ 0"
A1 A2
1' ‐ 3"
2' ‐ 5"
107 TOILET‐EAST 36 WOODSHOP A1 A2 1/4" = 1'‐0"
A1 A2
1/2" = 1'‐0"
7
A1 A2
107 TOILET‐SOUTH 1/4" = 1'‐0"
8
A1 A2
107 TOILET‐WEST 1/4" = 1'‐0"
9
A1 A2
107 TOILET‐NORTH 1/4" = 1'‐0"
2' ‐ 3" 1' ‐ 0"
10/04/13 |
Garage Final Design
Garage Final Design
Phase 3 Plan
N
Future Building Vision
Future Building Vision
Future Building Design Process
Future Building Design Process
Future Building Design Process
Future Building Layout
N
Future Building Layout
Site Plan Sun Studies
april | 9 am
april | 2 pm
april | 4 pm
june | 9 am
june | 2 pm
june | 4 pm
N
Vision Site Plan
Garden Vision
Garden Vision
Garden Vision
Phase 1 Plan
N
Phase 2 Plan
N
Phase 3 Plan
N
Vision Site Plan