ALABAMA STATE EDITION
231
65
72 Florence
2
Huntsville
20 Decatur
72
565 59
43
A Supplement to:
231
431
31
5
Gadsden
78 59 Anniston
20
Birmingham Bessemer
82 Tuscaloosa
65 280
20 82 Auburn
80
85
Selma
Phenix City
Montgomery
82
July 24 2013
65
231
43 84 431 331
84
84 52
Vol. XXV • No. 15
31
45
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Dothan
65 98
Mobile
10
Your Alabama Connection • Rich Olivier, Atlanta, GA • 1-800-409-1479
Predicting Hurricane Intensity Remains Challenge By Michael Finch II AL.COM
We’re due for a big one, some say. Every year now since 2004 and 2005 — the years of Hurricanes Ivan, Dennis and Katrina — the Gulf Coast has been “due” for a storm season worse than the year before. Now, one month into the official hurricane season, forecasters expect a double-digit number of storms to develop. As many as 13 to 20 named systems — storms with 39 mph winds or higher — are estimated for the coast by the National Oceanic Atmospheric Administration this year. Three to six of those may be major hurricanes, categories three or higher. If those numbers sound familiar, that’s because weather experts have been predicting more active weather patterns since the mid-1990s, said Bill Williams, director of the Coastal Research Center of the University of South Alabama. Yet, forecasting storm intensity remains a more elusive challenge.
That’s why you see so much leeway in the number of major storms predicted, Williams said. “It’s a real problem.” The factors that determine how strong a storm will be and where it will make landfall rests on shaky science. And the years between major storms offers a premature glimpse into storm outlook for the season. “Historically, every 10 years or so we’ve had a major storm,” said Jeff Garmon, meteorologist of the National Weather Service in Mobile. “Unfortunately, nature is not as predictable as that.” Weather experts look to a number of ingredients that combine to make an intense tropical storm. Wind shear and surface water temperatures are among the top factors, If not the most important indicators used, Garmon said. The rapid change in wind speed and direction that can shear off the intensity of a hurricane and warm waters can also increase it. Sometimes el nino occurs, when the Pacific Ocean warms up and wind blows from west to east, weakening hurricanes
for a short period. Not this year, which helps explain the double-digit amount of storms expected. Among the lessons learned from Hurricane Katrina is the importance of preparation. With winds as high as 125 mph, Katrina made landfall, leaving behind a wrecked Gulf Coast. And the storm seasons since 2004 and 2005 have not yielded a major storm of its size or intensity. “Just because you have a minimal year,” Williams said, cautioning residents, “it doesn’t mean you are safe from a big storm.” Last year, only one major hurricane made landfall — Superstorm Sandy. Forecasters say the number of tropical cyclones predicted this year does not mean each of them will reach land. From the time storm systems form over the Atlantic, the Caribbean and the southern Gulf of Mexico there are a myriad of factors that influence where they go, Garmon said. “Whether we [the Gulf Coast] get a system,” he said, “is just the luck of the draw.” (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.)
Phase Two of $72M Animal Hospital Project Proceeding Well Cindy Riley CEG CORRESPONDENT
Crews waterproof steel beams prior to precast installation.
Phase two of a $74 million small animal teaching hospital project is under way in Auburn, Ala. The 266,052 sq. ft. (24,717 sq m) addition will include a 208,000 sq. ft. (19,323.8 sq m) replacement hospital, a 34,079 sq. ft. (3,166 sq m) classroom addition, a 5,810 sq. ft. (539.8 sq m) research lab and an 18,163 sq. ft. (1,687.4 sq m) renovation to the existing classroom facility. The goal was to build a hospital that would accommodate growth for the next three to four decades. “The new hospital will include an enclosed dog park and designated units for each type of hospital service,” said Josh Kirkland, project manager of the Birmingham-based contractor Brasfield & Gorrie. “ Each will include an exam room, a treatment room and a seminar
room for student discussion. Support services such as diagnostic imaging, pharmacy, radiology, clinical pathology and critical care will also be included. Surgeons have designed a second floor wing with a central sterile court for all surgeries.” The Wilford and Kate Bailey Small Animal Teaching Hospital was designed to transform the Auburn veterinary campus into a place that combines education and clinical research with the latest in animal health care delivery. Focused on diagnostics and procedures only available at the level of practice associated with a university medical center, the college will be positioned to take full advantage of its position of leadership within the profession and the state. The structure is adjacent to the existing hospital on the college’s campus. The new facility will have clinical, examinasee HOSPITAL page 2
Page 2 • July 24, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Brasfield & Gorrie Leads Auburn University Project HOSPITAL from page 1
Two Terex tower cranes were erected back in May 2012 because of tight site restrictions.
Crews frame the gutter system.
tion and client-use space. Phase One of the project began in December 2010 and was completed in winter 2012, with both classroom and research facility additions. Specifically, the Phase One wing includes 34,000 sq. ft. (3,158.7 sq m) for educational use and three new classrooms. Class size will increase from the current 95 students to 120. Phase two began in the spring of 2012 and includes the main hospital construction. This phase will take about two and a half years to complete. Kirkland said the ongoing project has had its share of challenges. “The access to the existing hospital runs along the east side of the project and has to be open 24/7, 365 days a year. This allowed only a 30-foot working area along the east elevation. Existing campus buildings adjacent to the project site restricts the north side of the project. The west side of the site is adjacent to the large animal hospital facilities, only allowing approximately 30 foot of working area. The south side is restricted by Wire Road and the requirement to keep open a bike path.” According to Brasfield & Gorrie operations manager Steve Haney, two Terex tower cranes were erected back in May 2012, because of the tight site restrictions. “They were used for constructing the structure of the building and will be removed by the end of May 2013,” said Haney. “Scissor lifts are being used by virtually all trades to handle ceiling rough-ins. Boom lifts are being utilized to install various components of the exterior skin, including metal stud framing, waterproofing and metal panels.” As the construction manager of the project, Brasfield & Gorrie maintains eight management and supervision personnel. Maintaining the safety of the COVM employees, stu- Crews stock second floor with ductwork. dents and clients as they travel between the large animal and small animal existing facilities has been a priority, along with Crews erect steel assigning job responsibilities. frame using a Terex “At the start of the project, the team ran through a two-day SK 415 crane. LEAN course with all primes to do pull-planning. Each prime contractor played a significant role with scheduling to get everyone to establish a plan to take ownership and accountability. The schedule includes the entire team sitting down for 15 minutes each day to ensure everyone remains on the same page and on schedule. It has worked great in this situation.” Auburn University is one of only 37 schools of veterinary medicine in North America. This facility will have a significant impact not only in Alabama, but around the Northern Hemisphere according to Haney. Designed by Foil Wyatt Architects & Planners LLC and Jova/Daniels/Busby Architects, the new facility will be provide the latest in veterinary care and is a referral hospital to communities throughout Alabama and surrounding states. “Veterinary medicine continues to grow in scope based on new research and specialties,” said Dr. Douglas Allen, the director of the small animal hospital. “The facilities currently at Auburn University’s College of Veterinary Medicine, which were built in the 1960s and 1970s, are today dated in their function and size. The new facility will bring a new environment to the college. Pet owners will know their animal is receiving 21st century, state-of-the-art care, and students who choose Auburn will know their education is being provided in first-rate facilities.” “As the practice of veterinary medicine has changed, so has the need for new veterinarians and specialists. Auburn see HOSPITAL page 6
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • July 24, 2013 • Page 3
YOUR EXPERTISE. OUR INNOVATION AND SUPPORT.
IT’S THE RIGHT MIX.
Smart works. Ask about our complete line of paving solutions by contacting a Volvo dealer near you, or visit volvoce.com/na to learn more.
Birmingham, AL 205-841-6666 Mobile, AL 251-633-4020 Montgomery, AL 334-262-6642
Volvo Construction Equipment
www.cowin.com
Huntsville / Decatur, AL 256-350-0006 Oxford, AL 256-832-5053 Pensacola, FL 850-479-3004
Page 4 • July 24, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • July 24, 2013 • Page 5
Page 4 • July 24, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • July 24, 2013 • Page 5
Page 6 • July 24, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Auburn University Project to Significantly Impact State HOSPITAL from page 2
University strives to keep pace with the needs for clinical, classroom, and research facilities that are at the core of its teaching mission,” said Dr. William Brawner, Jr., who chairs the Small Animal Clinic Building Committee. The new facility will allow every facet of the teaching hospital to expand, according to Brawner. The new facility will be about four times larger than the current hospital. There are five surgery rooms, and there will be 10 in the new facility. As medicine continues to become more specified, facilities need to adjust. Auburn University has more than 20 specialty areas for animal treatment — from internal medicine, cardiology, neurology, anesthesiology, radiology and clinical pharmacology to oncology. Faculty space is needed to keep up with the technological and educational advances. The brick pre-cast with glass and metal roof structure was designed to qualify for silver LEED status through the U.S. Green Building Council. Once the hospital is complete, Hoerlein Small Animal Clinic will be renovated into radiology and administrative offices, and construction can get underway on the dog bone park, named because of its shape. Tuition revenue and individual and corporate donors are among the sources of funding for the projects. Private contributions include a $10 million pledge from Auburn alumni John and Rosemary Brown. The hospital operates 24/7 and includes a community practice, a critical care unit and a referral center. All the facilities remained open and accessible to the public and students. With construction beginning in January 2012 and scheduled for completion by February 2014, maintaining a regular schedule has been something of a challenge, according to Dr. Brawner. “We had to maintain full operation and access of the hospital for our clients, as well as for the educational mission of the college,” said Brawner. “The construction site is in the middle of the campus, and both the architects and our construction partners have worked really diligently to ensure the hospital was open for patients and that our students’ education was not compromised. “Both the college and the contractors have worked diligently to keep disruption to a minimum, both for clients and their owners and students, faculty and staff. Parking has been redirected for patients entering the small animal clinic, which has proven to be a minor adjustment so far. “Brasfield & Gorrie has done a great job in accommodating our needs”, said Dr. Brawner. “They used larger cranes, when smaller ones would have been acceptable, because the smaller ones are louder and would have scared horses and other large animals near the construction site. They have done a lot to accommodate us and our mission.” Rabren General Contractors, headquartered in Auburn, is one of four prime contractors on the project. “We have the general works and the concrete packages,” said Rabren project manager Drew Brown. “The general works includes all interior and exterior finishes, which also included the structural steel furnish and erection. The concrete package was the complete structural package for the foundations up, including the slabs on metal decking. The total amount of concrete is in the range of 10,000 cubic yards, with around 700 tons of reinforcing steel. The entire project consist of a finished building of around 207,000 square feet of end-user space.” The new building is scheduled for completion around
Phase two of a $74 million small animal teaching hospital project is under way in Auburn, Ala.
mid-January. Once the vet school occupies the new building, then the second phase will be to demolish some of the existing structure, renovate, and add a pedestrian bridge from the new building to Horlein Hall. This phase is scheduled to be complete in August 2014. Subcontractors included in the construction are D & J Enterprises, Bradley Plumbing and Heating, C & C Masonry of Carrollton, Ga. and Auburn Electrical Construction Co., Inc., (AECCI) . “Our contract time is 800 days, which means we have to be complete by mid-July 2014; however, the main building is supposed to be complete in time for class to start in January, said Amy Baker, project coordinator of AECCI. “There’s some other work that will follow on other parts of the vet school campus.” AECCI is responsible for the complete electrical scope of work including underground distribution, power distribution equipment such as switchboards, panel boards, transformers, architectural light fixtures, surgical light fixtures, exam light fixtures, a 600 kW emergency generator, an automatic transfer switch, lighting control systems, a cable tray, conduit rough-in for telecommunications, a complete fire alarm system, a complete lightning protection system and a complete CCTV system. Large equipment includes man-lifts, such as scissor and boom for lifting men to install work, according to Baker. A lull for off-loading material and equipment from trucks, digging equipment such as a backhoe and tamps, large conduit benders for feeder pipes were used on the job. Materials include all sizes of electrical conduit from ¾ in. to 4 in., both PVC, EMT and rigid, and boxes and fittings, all sizes of wire from #12 for branch circuit wiring up to 500MCM for the
feeder circuits, switches, including occupancy sensors and photocells, receptacles, equipment disconnects and floor boxes. Coordination between trades has been extremely timeconsuming, said Baker. “Hundreds of man hours are spent ensuring that your equipment, along with piping and wiring for that equipment, won’t conflict with that of another trade. This includes coordination drawings which were done in 3D on this project. Another big issue is scheduling. The schedule is always being re-evaluated and updated based on field conditions.” AECCI Project Manager Barry Preattle added, “The area surrounding the project has full-time veterinary services, as well as the teaching aspect. This brings clients, faculty, and students in close proximity to the construction area. The construction team is constantly aware of the need to protect these persons from the dangers of the construction site, as well as limit the impact the construction has on the day-to-day activities of the school.” As the oldest veterinary school in the South — and the nation’s seventh oldest veterinarian program —Auburn University College of Veterinary Medicine is considered one of the country’s preeminent institutions for research, teaching, diagnostics and comprehensive medical care for both large and small animals. The mission of the college is to prepare individuals for careers of in veterinary medicine, including private and public practice, industrial medicine, academics and research. The college has 125 faculty members and current enrollment of 487 DVM and graduate students. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • July 24, 2013 • Page 7
www.jcbofalabama.com
Comfort: Industry’s largest cab; up to 46% more cab space
Cost of Ownership: 16% more fuel efficient than the competition
Safety: First and only skid steer with a side door entry with 270° total visibility; 60% better than competition
Productivity: 21% more productive than other skid steers in performance tests
Serviceability: Up to 24% better SAE rating with industry leading access to service points
Ask your JCB dealer about a Demo so you can join the REVOLUTION!
SMALL PLATFORM
Skid Steer Loaders 1350lbs - 2050lbs 612kg - 930kg
LARGE PLATFORM
Compact Track Loaders 1500lbs - 2050lbs 681kg - 930kg
LEEDS 8920 Weaver Ave. Leeds, AL 35094
www.jcbofalabama.com
(205) 699-2699
Skid Steer Loaders 2250lbs - 3295lbs 1021kg - 1495kg
MONTGOMERY 791 Anderson Rd Monthgomery, AL 36110 (334) 262-8104
Compact Track Loaders 2250lbs - 3200lbs 1021kg - 1452kg
ANNISTON 30 Plunkett Ave Anniston, AL 36201 (256) 312-4639 3335
Page 8 • July 24, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
PC490LC-10 From Komatsu - The Excavator Experts
The Komatsu PC490LC-10 provides more power, improved operator comfort and reduced fuel consumption. The excavator experts at Komatsu can help you complete jobs more quickly, while lowering your fuel and maintenance costs. t Efficient Komatsu Tier 4 Interim engine and advanced hydraulic system maximize productivity while providing up to 5% lower fuel consumption. t Increased lift capacity with a larger machine design and a reinforced undercarriage t Komatsu CARE provides complimentary Tier 4 maintenance, including KDPF exchange filters. Contact your Komatsu distributor for details.
www.komatsuamerica.com www.komatsuamerica.com Alabama Dolthan 334-678-1832 334-678-1598 Birmingham 205-591-2131 205-592-7581
Birmingham 205-591-2131 205-591-1309
Montgomery 334-288-6580 334-288-6584
Alabaster 205-621-2489 205-621-2488
Decatur 256-355-0305 256-355-0311
Anniston 256-831-2440 256-835-0981
Pensacola 850-505-0550 850-505-0551
Forest Park 404-366-0693 404-366-9688
Savannah 912-330-7500 912-330-7490
Augusta 706-798-7777 706-798-3237
Columbus 706-562-1801 706-562-9897
Mobile 251-457-8991 251-457-6003
Birmingham 205-591-8327 205-592-7685
Tuscaloosa 205-752-0621 205-752-1948
Shoals Area 251-275-4159 205-383-5566
Florida Panama City 850-763-4654 850-785-3279
Georgia Kennesaw 678-354-5533 678-354-5577
Hoschton 706-654-9850 706-654-9856
Albany 229-435-0982 229-435-5259
Calhoun 706-879-6200 706-629-1134
Macon 478-745-6891 478-745-7291