Alabama 19 2013

Page 1

ALABAMA STATE EDITION

231

65

72 Florence

2

Huntsville

20 Decatur

72

565 59

43

A Supplement to:

231

431

31

5

Gadsden

78 59 Anniston

20

Birmingham Bessemer

82 Tuscaloosa

65 280

20 82 Auburn

80

85

Selma

Phenix City

Montgomery

82

September 18 2013

65

231

43 84 431 331

84

84 52

Vol. XXV • No. 19

31

45

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Dothan

65 98

Mobile

10

Your Alabama Connection • Rich Olivier, Atlanta, GA • 1-800-409-1479

Ready to Rumble: Crews Construct Chain Sport Center By Cindy Riley CEG CORRESPONDENT

Construction crews in Alabama are working to complete a new facility for a sporting goods chain that will move current operations from Birmingham to Alabaster. Hibbett Sports, Inc. purchased a nearly 60-acre site at Shelby West Corporate Park. Construction of a more than 400,000 sq. ft. (37,161.2 sq m) structure is underway. Work began on the Hibbett Wholesale and Logistics Center in December 2012, and should be completed later this year. The project will include the construction of a new single-story structure that will measure approximately 412,000 sq. ft. (38,276.1 sq m), and will be expandable to 88,000 sq. ft. (8,175.5 sq m). The work includes site development along with a new conventional structural steel frame and load bearing tilt-up concrete frame building. The frame includes an expandable end-wall to accommodate future expansion. In addition site work includes infrastructure work such as grading and utilities, site lighting, paving and landscaping and an air-conditioned office area. The site was undeveloped and had to be cleared and graded for the new facility,” said Robert McElroy, senior project manager of general contractor Brasfield & Gorrie. “At peak, there were over 40 pieces of heavy earth moving equipment on site to meet the project deadlines. “Completing the site work during the winter months has been the most challenging for the project,” McElroy said. “But lifting 2,682 linear feet of tilt wall panels is no small task either.” Brasfield & Gorrie superintendent Barney Lucas said crews had to maneuver 293,000 yds. (267,919.2 m) of dirt and 9,042 yds. (8,268 m) of concrete during the construction process. A 350-ton (317.5 t) crane for lifting the tilt panels was among the equipment used for site work and concrete activates. Machinery on site includes Caterpillar, Komatsu and John Deere. Brasfield & Gorrie said work is approximately 50 percent finished. Crews are working to complete the tilt panels. Roller compacted concrete paving and asphalt paving, in addition to the interior build-out have yet to be completed. “The specific services we’ve performed include architect, civil engineer, landscape architect, land surveying, geotechnical engineer and construction materials testing — a service in which the comsee SPORT page 2

Site work includes installing load bearing tilt-up concrete framing for the new building.


Page 2 • September 18, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide

Officials Estimate 170 New Jobs for Shelby County SPORT from page 1

paction of the soil is spot verified, compressive strength of the concrete is tested and welds are inspected, said Cole Williams, a civil engineer of Goodwyn, Mills, and Cawood. “We’re happy with it so far, but it’s still under construction, so the true test will be a few years down the road. As with any site design, the main challenge is to balance the owner’s needs against what the site will require to meet those needs. This included creating an efficient layout, balancing the earthwork, managing the soil material and meeting the building’s utility needs all in accordance with the local municipal building code requirements.” The Logistics Center, which will offer parking for more than 200 employees and 250 trailers, accounts for about 36 acres of improvements. “Due to the sheer size of this site,” said Williams, “one of the biggest issues is to manage the grading needs. The goal is to balance the cut to fill volumes of the earthwork within the limits of the site. It can be very costly to either haul excess material off site or to borrow material from another source and have it trucked in. Also, the Shelby West Industrial Park has some very specific landscape requirements, so the main challenge was to provide the owner an aesthetically pleasing landscape pallet that meets the parks requirements and is budget friendly.” Hibbett is spending more than $25 million on the project, located near the Shelby County Airport. “The Shelby County airport has been a good neighbor to the project site,” said McElroy. “The project team submitted to the FAA and gained their approval for activities in a timely manner.” The move will double the size of the company operations, in an effort to ultimately reach as many as 1,500 stores. The business has outgrown its current facility on Industrial Lane, but the site is landlocked so expanding at that location wasn’t an A 350-ton (317.5 t) crane lifts the tilt panels.

Crews maneuver 293,000 yds. (267,919.2 m) of dirt.

option. Hibbett’s corporate offices also were located on Industrial Lane and recently relocated to Birmingham’s Oxmoor Valley. As for the financial impact to the area, officials say the move will bring about 170 jobs to Shelby County. The current center employs about 150 people, and Hibbett plans to add jobs at the new facility. Hibbett is receiving more than $2 million in state and local tax abatements over 10 years. A number of cities competed for the Hibbett project, but the Shelby County Economic and Industrial Development Authority (SCEIDA) worked closely with the city of Alabaster and EGS Commercial Real Estate to help secure the facility by providing timely responses to information requested by the company. “This project will provide a significant capital investment of at least $40 million, and add a successful public company with a notable history of community involvement to our expanding list of new employers in Alabama’s fastest-growing county,” said James Dedes, executive director of SCEIDA. “Selection factors included the quality of the site at Shelby West Corporate Park, which provides convenient access to the Interstate 65 corridor, the availability of a skilled labor force and our success in crafting an incentive package in partnership with the city of Alabaster that provided a competitive economic advantage for Shelby County,” said Dedes. When completed, the new structure will replace the existing 180,000 sq. ft. (16,722.5 sq m) facility the company currently leases in adjacent Jefferson County. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG

Lifting the tilt wall pannels proves to be a challenging aspect of the job.


Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • September 18, 2013 • Page 3

YOUR EXPERTISE. OUR INNOVATION AND SUPPORT.

IT’S THE RIGHT MIX.

Smart works. Ask about our complete line of paving solutions by contacting a Volvo dealer near you, or visit volvoce.com/na to learn more.

Birmingham, AL 205-841-6666 Mobile, AL 251-633-4020 Montgomery, AL 334-262-6642

Volvo Construction Equipment

www.cowin.com

Huntsville / Decatur, AL 256-350-0006 Oxford, AL 256-832-5053 Pensacola, FL 850-479-3004


Page 4 • September 18, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide

Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • September 18, 2013 • Page 5


Page 4 • September 18, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide

Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • September 18, 2013 • Page 5


Page 6 • September 18, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide

Montgomery • Jefferson • Talladega • Calhoun • Russell • Walker • Lawrence • Dekalb • Morgan • St. Clair • Tuscaloosa • Morgan • Shelby •Alabama… Bibb •Hale • Fayette • Marion • Winston • Cullman • Shelby • Chilton • Chambers • Covington • Baldwin • Clarke • Monroe • St. Clair • Chilton • Escambia• Montgomery • Jefferson • Russell • Fayette • Conecuh • Coffee • Geneva • Montgomery • Jefferson • Talladega • Bibb • Coffee • Calhoun • Russell • • Walker• Lawrence• Dekalb • Morgan • St. Clair • Tuscaloosa • Bibb• Hale • Fayette • Monroe • Clarke • Winston • Cullman • Shelby • Chilton • Chambers • Covington • Baldwin • Clarke • Monroe • Montgomery • Jefferson • Talladega

‘The Yellowhammer State’ Highway Project Lettings

The Alabama State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Lee Contract ID: 20130329007 Project: Constructing the resurfacing, signals, widening, and culvert replacement on Moores Mill Road from Samford Avenue to 761 ft. east of Dean Road in Auburn. Distance: .93 mi. Contractors and Bid Amounts: • D & J Enterprises Inc. — $903,057 • Robinson Paving Company Inc. — $994,237 • Walker Patton Company Inc. — $1,064,503 County: Lamar Contract ID: 20130329010 Project: Constructing the bridge replacement (precast) and approaches on CR-49 at Hell’s Creek northeast of Kingville. Distance: .15 mi. Contractors and Bid Amounts: • Glasgow Construction Company Inc. — $958,077 • Tri-County Construction Inc. — $1,027,745 • Riley Bridge Company Inc. — $1,069,308 County: Pickens Contract ID: 20130329039 Project: Constructing the widening, resurfacing and traffic stripe on SR-159 from North Main Street (MP 0.440) in Gordo to north of CR-49 (MP 8.700). Distance: 8.3 mi. Contractors and Bid Amounts: • S. T. Bunn Construction Company Inc. — $3,052,067 • Apac Mid-South Inc. — $3,305,311 Counties: Autauga and Elmore Contract ID: 20130222004 Project: Constructing the additional lanes (grade, drainage, pavement, signal and signing) on CR-29 (Old Farm Lane) from the Prattville City Limits to SR-14. Distance: 1.6 mi. Contractors and Bid Amounts: • Newell Roadbuilders Inc. — $5,680,100 • W. S. Newell & Sons Inc. — $5,815,202 • Dubose Construction Company LLC — $5,880,720 • J.C. Brown Construction Inc. — $5,973,937 • Chilton Contractors Inc. — $6,188,072 • Southeast Cherokee Construction Inc. — $6,434,407 • Wiregrass Construction Company Inc. — $7,324,918 County: Mobile Contract ID: 20130222006 Project: Constructing the grade, drain, base, and pave on Broad Street from Michigan Avenue to 15th Street west of I-10 in Mobile. Distance: 1.0 mi. Contractors and Bid Amounts: • Hosea O. Weaver & Sons Inc. — $1,488,151

• John G. Walton Construction Co. Inc. — $1,564,266 • Frank Turner Construction Co. Inc. — $1,646,720 • Mobile Asphalt Company LLC — $1,810,311 • Asphalt Services Inc. — $1,836,393 • Summit Industries LLC — $1,837,122 • Gulf Equipment Corporation — $2,005,328 County: Tuscaloosa Contract ID: 20130222011 Project: Constructing the widening, resurfacing, and realignment on Loop Rd. from Fairmont Dr. to Woodland Road in Tuscaloosa. Distance: .56 mi. Contractors and Bid Amounts: • DRM Utilities LLC — $2,436,925 • Veterans Landscaping Company Inc. — $2,635,385 • Chilton Contractors Inc. — $2,660,475 • John G. Walton Construction Company Inc. — $2,662,072 • Camar Construction Company Inc. — $2,909,150 County: Madison Contract ID: 20130222015 Project: Constructing the Planing, resurfacing and traffic stripe on SR-53 (U.S.-231) and SR-1 (U.S.-431) at various sites in Huntsville as indicated in the plans. Distance: 5.3 mi. Contractors and Bid Amounts: • Apac Mid-South Inc. — $3,708,676 • Reed Contracting Services Inc. — $3,838,815 • Wiregrass Construction Company Inc. — $3,871,646

County: Bullock Contract ID: 20130222041 Project: Constructing the planing, resurfacing, and traffic stripe on SR-6 (U.S.-82) from the Montgomery County Line (MP 179.335) to Bowlin Creek (MP 193.578). Distance: 14.2 mi. Contractors and Bid Amounts: • Asphalt Contractors Inc. — $4,477,822 • Wiregrass Construction Company Inc. — $4,547,381 • Apac Mid-South Inc. — $6,357,865 County: Bullock Contract ID: 20130222043 Project: Constructing the planing, resurfacing, and widening on SR-110 from Montgomery County Line (MP 14.077) to CR-7 (MP 24.684). Distance: 10.6 mi. Contractors and Bid Amounts: • Wiregrass Construction Company Inc. — $2,744,791 • Asphalt Contractors Inc. — $2,822,761 County: Butler Contract ID: 20130426001 Project: Constructing the micro-milling, resurfacing, and traffic stripe on I-65 from the north end of the CR-41 underpass bridge to 0.6 mi. south of the Lowndes County Line. Distance: 7.3 mi. Contractors and Bid Amounts: • Apac Mid-South Inc. — $4,426,612 • Wiregrass Construction Company Inc. — $4,812,260


Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • September 18, 2013 • Page 7

www.jcbofalabama.com

Comfort: Industry’s largest cab; up to 46% more cab space

Cost of Ownership: 16% more fuel efficient than the competition

Safety: First and only skid steer with a side door entry with 270° total visibility; 60% better than competition

Productivity: 21% more productive than other skid steers in performance tests

Serviceability: Up to 24% better SAE rating with industry leading access to service points

Ask your JCB dealer about a Demo so you can join the REVOLUTION!

SMALL PLATFORM

Skid Steer Loaders 1350lbs - 2050lbs 612kg - 930kg

LARGE PLATFORM

Compact Track Loaders 1500lbs - 2050lbs 681kg - 930kg

LEEDS 8920 Weaver Ave. Leeds, AL 35094

www.jcbofalabama.com

(205) 699-2699

Skid Steer Loaders 2250lbs - 3295lbs 1021kg - 1495kg

MONTGOMERY 791 Anderson Rd Monthgomery, AL 36110 (334) 262-8104

Compact Track Loaders 2250lbs - 3200lbs 1021kg - 1452kg

ANNISTON 30 Plunkett Ave Anniston, AL 36201 (256) 312-4639 3335


Page 8 • September 18, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide

PC490LC-10 From Komatsu - The Excavator Experts

The Komatsu PC490LC-10 provides more power, improved operator comfort and reduced fuel consumption. The excavator experts at Komatsu can help you complete jobs more quickly, while lowering your fuel and maintenance costs. t Efficient Komatsu Tier 4 Interim engine and advanced hydraulic system maximize productivity while providing up to 5% lower fuel consumption. t Increased lift capacity with a larger machine design and a reinforced undercarriage t Komatsu CARE provides complimentary Tier 4 maintenance, including KDPF exchange filters. Contact your Komatsu distributor for details.

www.komatsuamerica.com www.komatsuamerica.com Alabama Dolthan 334-678-1832 334-678-1598 Birmingham 205-591-2131 205-592-7581

Birmingham 205-591-2131 205-591-1309

Montgomery 334-288-6580 334-288-6584

Alabaster 205-621-2489 205-621-2488

Decatur 256-355-0305 256-355-0311

Anniston 256-831-2440 256-835-0981

Pensacola 850-505-0550 850-505-0551

Forest Park 404-366-0693 404-366-9688

Savannah 912-330-7500 912-330-7490

Augusta 706-798-7777 706-798-3237

Columbus 706-562-1801 706-562-9897

Mobile 251-457-8991 251-457-6003

Birmingham 205-591-8327 205-592-7685

Tuscaloosa 205-752-0621 205-752-1948

Shoals Area 251-275-4159 205-383-5566

Florida Panama City 850-763-4654 850-785-3279

Georgia Kennesaw 678-354-5533 678-354-5577

Hoschton 706-654-9850 706-654-9856

Albany 229-435-0982 229-435-5259

Calhoun 706-879-6200 706-629-1134

Macon 478-745-6891 478-745-7291


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.