ALABAMA STATE EDITION
231
65
72 Florence
2
Huntsville
20 Decatur
72
565 59
43
A Supplement to:
231
431
31
5
Gadsden
78 59 Anniston
20
Birmingham Bessemer
82 Tuscaloosa
65 280
20 82 Auburn
80
85
Selma
Phenix City
Montgomery
82
October 16 2013 Vol. XXV • No. 21
65
231
43 84 431 331
84
84 52 31
45
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Dothan
65 98
Mobile
10
Your Alabama Connection • Rich Olivier, Atlanta, GA • 1-800-409-1479
Millbrook Celebrates Step to Tornado Recovery By Cindy Riley CEG CORRESPONDENT
Described as one of the fastest growing communities in Alabama, the city of Millbrook is celebrating the completion of a $4 million police and judicial complex. As a testament to the city’s resilience, the new courtroom features pews from a church sanctuary that was destroyed by a powerful tornado that ripped through the area in April 2011. “The building is a single-store steel and masonry frame structure with wood roof trusses,” said Richard Kirkland, project manager of Russell Construction in Alabama. “The envelope utilizes a masonry wainscot with EIFS, horizontal metal panel and a snap-lock metal roof. We worked closely with the owner and architect to make design revision in a design and assist process to achieve the budget that was suitable for the city.” Construction on the facility began last June and was completed in March. “We went through a refinement process to reduce the cost of the initial capital investment and yet prepare for future expansion as the city continues to grow,” Kirkland said. “This design and assist process resulted in multiple meetings to review reductions in systems, security analysis, staffing requirements, operations or other elements to assure the needs were met in the most economical means possible. We subcontracted all major trades and supervised the entire installation from permitting through close-out.” The new complex is home to the Millbrook police department headquarters and includes police dispatch operations, an officer briefing and training area, security holding cells, police offices and conference rooms. The Millbrook municipal court department is housed in the facility and features a large courtroom, attorney offices and meeting space and court administrative office spaces. The courtroom will serve as the city council chambers and as the location for all city council meetings and work ses-
sions. Kirkland said the new building, described as long overdue, was not without its share of challenges. “As the project started, we uncovered buried drainage for the former ball field, as well as an underground concrete structure to be removed. We quickly addressed this issue, so as to maintain a very quick-paced schedule. We chose to work with the various subcontractors who were qualified to do this type work, could meet the performance requirements and maintain a suitable installation. “The mechanical rooms are always a key component of building operations. When we simplified the systems from a chilled water system to gas furnaces, we had to address size requirements to fit all the equipment in the rooms. We had to fulfill fresh air requirements, venting and still provide adequate space to service the equipment. The fabrication of sheet metal, typically overlooked to join separate air handler into twin units, is not new, but was put together professionally in tight confines.” As part of the site construction, and to provide room for future expansion, crews maintained the original civil design. As a result the retention pond is located on the property perimeter. This required storm water piping on all sides. “Using a 16,000 pound excavator permitted us to quickly install the storm water system and move on to the project utilities,” said Kirkland. “The excavator is a key component to a good pipe crew, with a top-notch operator to correctly install all the key pieces required for the building that included firewater, domestic water, roof drainage, storm drainage and sanitary sewer. Crews installed 350 linear ft. (106.7 m) of reinforced concrete pipe. The project included 200 linear ft. (60.9 m) of 3-in. copper for domestic water and approximately 80 linear ft. (24.4 m) of 6-in. ductile iron for the firewater installation. The building included two separate sewer taps and 160 see MILLBROOK page 2
As part of the site construction and to provide room for future expansion, crews maintained the original civil design.
Page 2 • October 16, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Population Growth Stresses Need for New Judicial Complex MILLBROOK from page 1
linear ft. (48.8 m) of 6-in. schedule 40 PVC sewer pipe according to Kirkland. The new 18,000 sq. ft. (1,672.3 sq m) building, located on Grandview Road, is across the street from the municipal building the city had been using. “Since 1996, our city has experienced exponential population growth which led to commercial and residential development,” said Millbrook Mayor Al Kelley. “This led to our police and municipal court departments expanding. When I took office there were approximately 12 police officers; today, there are 31 officers, plus support staff. The old building has been redesigned so many times. “Problems existed with flooding issues and equipment had to be replaced because of leaks. It seemed we were constantly trying to patch, repair and replace with no noticeable improvements,” said Kelley. Kelley said the old building has served numerous tenants through the years. “Initially, it was a Baptist church where I was baptized at the age of 16. A medical clinic was opened at this location during the late 1970’s and operated for several years. Initially, Millbrook City Hall shared some space with the medical clinic. After the clinic closed, the city utilized the entire building, encompassing all of the various departments. In 2000, we had an opportunity to purchase a building which currently houses the administrative offices of the city of Millbrook. This left the old building for the police and municipal court departments operations with approximately 50 employees.” The new building was paid for with a bond issue in 2010. City officials will make payments on the bond for the next two decades. According to Johnny Veres, Associate AIA with the architectural firm 2WR Inc. of Montgomery the design team worked closely with the client to determine their exact programming needs for this project. Challenges included marrying two distinct programs into one cohesive building, allowing access to common spaces while still maintaining separation where needed. “The city of Millbrook needed new facilities for each respective party, said Veres.” “In essence, the complex separates buildings adjoined by administrative offices. By consolidating the needs of the court officials and police department into one building, we were able to fulfill more of our client’s needs for less cost to them. “Both the Millbrook Police Department and Municipal Court deserved better facilities for the services they provide to the community,” said Veres. “Through this project, we were able to give them facilities they can
be proud of, and a building that represents a city that is growing and prospering,” said Veres. Along with a large work session room, the new building features an expanded courtroom where city council meetings can now be held. The courtroom is officially named the “The City of Millbrook Benjamin E. Pool Courtroom” to honor the municipal judge who has served the city for more than 35 years. Boones Chapel Baptist Church in Autauga County also was recognized for donating pews that provide seating in the court and its lobby. The largest city in Elmore County, Millbrook is located just north of Montgomery on I-65 and is home to roughly 15,000 residents. With plenty of available land adjoining the interstate, the city looks forward to additional retail and commercial development. For now, however, the new complex is its focus. “A public invitation was sent for a grand opening and ribbon cutting for the new facility, and the response was tremendous,” said Kelley. The morale of the police and municipal court employees has been greatly enhanced with this new facility. Response from the public has been phenomenal.” (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG
Crews work to install a manhole at the Millbrook job site.
Crews pour concrete at the Millbrook job site.
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • October 16, 2013 • Page 3
YOU’RE ABOUT UPTIME, FUEL EFFICIENCY AND COMFORT. THAT’S SMART.
Smart Works. Birmingham, AL 205-841-6666 Mobile, AL 251-633-4020 Montgomery, AL www.nussgrp.com 334-262-6642
BURNSVILLE, MN (800) 552-1189 ROCHESTER, MN (800) 562-1505
Huntsville / Decatur, AL MANKATO, MN 256-350-0006 (800) 862-6225 Oxford, AL ROSEVILLE, MN 256-832-5053 ST. CLOUD, MN FL (800) 704-0935 Pensacola, (888) 310-6225 850-479-3004
DULUTH, MN (800) 835-6225
www.cowin.com TOOLS THAT MAKE YOUR BUSINESS WORK™
Volvo Construction Equipment
Page 4 • October 16, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • October 16, 2013 • Page 5
Page 4 • October 16, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • October 16, 2013 • Page 5
Page 6 • October 16, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Montgomery • Jefferson • Talladega • Calhoun • Russell • Walker • Lawrence • Dekalb • Morgan • St. Clair • Tuscaloosa • Morgan • Shelby •Alabama… Bibb •Hale • Fayette • Marion • Winston • Cullman • Shelby • Chilton • Chambers • Covington • Baldwin • Clarke • Monroe • St. Clair • Chilton • Escambia• Montgomery • Jefferson • Russell • Fayette • Conecuh • Coffee • Geneva • Montgomery • Jefferson • Talladega • Bibb • Coffee • Calhoun • Russell • • Walker• Lawrence• Dekalb • Morgan • St. Clair • Tuscaloosa • Bibb• Hale • Fayette • Monroe • Clarke • Winston • Cullman • Shelby • Chilton • Chambers • Covington • Baldwin • Clarke • Monroe • Montgomery • Jefferson • Talladega
‘The Yellowhammer State’ Highway Project Lettings
The Alabama State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Morgan Contract ID: 20130426014 Project: Constructing the bridge replacement and approaches on CR-1137 (Wilhite Road) over Flint Creek north of the Cullman County Line. Distance: 0.15 mi. Contractors and Bid Amounts: • Miller & Miller Inc. — $911,688 • Riley Bridge Company Inc. — $949,796 • Dement Construction Company LLC — $1,048,086 • McInnis Construction LLC — $1,180,770 County: Butler Contract ID: 20130426020 Project: Constructing the bridge replacement on SR-106 over Pigeon Creek at MP 22.977 east of CR-45. Distance: 0.26 mi. Contractors and Bid Amounts: • Newell & Bush Inc. — $1,815,965 • Murphree Bridge Corporation — $1,969,808 • McInnis Construction LLC — $2,070,717 • Gulf Equipment Corporation — $2,184,248 County: Jefferson Contract ID: 20130426060 Project: Constructing additional lanes, (grade, drain, base, and pave) and traffic stripe on Coalburg Road from CR107 to Corridor X. Distance: 2.0 mi. Contractors and Bid Amounts: • W. S. Newell & Sons Inc. — $7,554,713 • Carcel & G. Construction LLC — $7,814,934 • Russo Corporation — $8,100,497 • Dunn Construction Company Inc. — $8,481,862 • Good Hope Contracting Company Inc. — $8,756,425 • Wright Brothers Construction Company Inc. — $10,325,836 County: Marion Contract ID: 20130531003 Project: Constructing the grade, drain, base, pave, and bridge replacement and removal on SR-74 (U.S.-278) at the Buttahatchee River in Hamilton. Distance: 1.38 mi. Contractors and Bid Amounts: • Wright Brothers Construction Company Inc. — $10,442,888 • Scott Bridge Company Inc. — $11,169,254 • Dement Construction Company LLC — $11,674,739 • Riley Bridge Company Inc. — $12,804,022
County: Morgan Contract ID: 20130531015 Project: Constructing the bridge replacement and approaches on CR-41 (Danville Road) over the west fork of Flint Creek northeast of Neel. Distance: .5 mi. Contractors and Bid Amounts: • Wiregrass Construction Company Inc. — $2,942,630 • Reed Contracting Services Inc. — $2,946,605 • Riley Bridge Company Inc. — $3,010,651 • McInnis Construction LLC — $3,231,825 • Scott Bridge Company Inc. — $3,690,076 • Dement Construction Company LLC — $4,057,730 County: Mobile Contract ID: 20130531023 Project: Constructing the I-65, Frontage Road relocation and the roadway improvements (grade, drain, base, pave, and signals) on SR-158 in Saraland. Distance: .95 mi. Contractors and Bid Amounts: • John G. Walton Construction Company Inc. — $4,439,490 • Frank Turner Construction Company Inc. — $4,763,724 • W. S. Newell & Sons Inc. — $4,811,128 • Hosea O. Weaver & Sons Inc. — $5,066,637 • Summit Industries LLC — $5,130,315 • McInnis Construction LLC — $5,337,141
County: St. Clair Contract ID: 20130531025 Project: Constructing the bridge replacement and approaches on SR-4 (U.S.-78) over Wolf Creek northwest of Pell City. Distance: 0.274 mi. Contractors and Bid Amounts: • McInnis Construction LLC — $1,513,487 • Alabama Bridge Builders Inc. — $1,576,226 County: Dallas Contract ID: 20130531026 Project: Constructing the grade, drain, base, pave, and bridge replacement on SR-22 over Valley Creek in Selma. Distance: 0.15 mi. Contractors and Bid Amounts: • Newell & Bush Inc. — $2,153,245 • McInnis Construction LLC — $2,403,321 • Murphree Bridge Corporation — $2,461,161 • Alabama Bridge Builders Inc. — $2,653,608 • Scott Bridge Company Inc. — $3,237,934 County: Lauderdale Contract ID: 20130531076 Project: Constructing the grade, drain, base, & pave on Railroad Avenue and bridge replacement on Hermitage Drive over the Tennessee Southern Railroad in Florence. Distance: 0.20 mi. Contractors and Bid Amounts: • B. H. Craig Construction Company Inc. — $1,719,511 • Riley Bridge Company Inc. — $1,898,644 • Dement Construction Company LLC — $2,538,655
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • October 16, 2013 • Page 7
www.jcbofalabama.com
Comfort: Industry’s largest cab; up to 46% more cab space
Cost of Ownership: 16% more fuel efficient than the competition
Safety: First and only skid steer with a side door entry with 270° total visibility; 60% better than competition
Productivity: 21% more productive than other skid steers in performance tests
Serviceability: Up to 24% better SAE rating with industry leading access to service points
Ask your JCB dealer about a Demo so you can join the REVOLUTION!
SMALL PLATFORM
Skid Steer Loaders 1350lbs - 2050lbs 612kg - 930kg
LARGE PLATFORM
Compact Track Loaders 1500lbs - 2050lbs 681kg - 930kg
LEEDS 8920 Weaver Ave. Leeds, AL 35094
www.jcbofalabama.com
(205) 699-2699
Skid Steer Loaders 2250lbs - 3295lbs 1021kg - 1495kg
MONTGOMERY 791 Anderson Rd Monthgomery, AL 36110 (334) 262-8104
Compact Track Loaders 2250lbs - 3200lbs 1021kg - 1452kg
ANNISTON 30 Plunkett Ave Anniston, AL 36201 (256) 312-4639 3335
Page 8 • October 16, 2013 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide