Georgia 04 2016

Page 1

441

59

75

GEORGIA STATE EDITION

Cornella 19

A Supplement to:

Rome 85 27

Athens 441

Atlanta

20

Madison Augusta

85

20

Griffin 1

129

Milledgeville

75

La Grange

Macon

301

185 19

16

Dublin

Swainsboro Oak Park

Columbus

Statesboro

341 441 16

Lyons Americus

February 17 2016 Vol. XVIII • No. 4

301

1

82

Dorchester

341

Cuthbert

75

Albany

84

Douglas Tifton

82

95

82

Blakely

Pearson

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Savannah

McRae Cordele

27

27 84

Moultrie

19 319

Bainbridge

84

Valdosta Thomasville

Waycross Brunswick 82

1 441

Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479

Crews Reach Milestone on Northwest Corridor Job By Lori Tobias CEG CORRESPONDENT

Construction crews recently reached another milestone in Georgia’s Northwest Corridor Express Lanes project, completing the placement of five 155-ft. (47.2 m) concrete beams over Delk Road. The beams are part of a 2,311 ft. long (704 m) bridge that will span this section of the project. Once completed, the Express Lanes bridge over Delk Road will include 68 beams, each weighing more than 110,000 lbs. (49,895 kg). The bridge, which is being constructed to carry vehicles traveling in the dedicated Express Lanes, is designed to reach a height of more than 23 ft. (7 m) to the top of the new bridge deck over Delk Road. “The primary purpose of the Northwest Corridor Express Lanes is to provide an additional travel option for motorists,” said John Hancock, assistant state innovative delivery engineer of GDOT. “They will have the choice to use the Express Lanes when needed, but the general purpose lanes will always remain open for travel without a toll. In addition, individuals using transit and registered vanpools will be able to travel in the lanes without paying a toll. The NWC project is a critical piece of a strategic transportation plan to provide options for more reliable travel times with benefits to both transit and registered vanpool customers in one of the region’s busiest thoroughfare. “The Northwest Corridor Express Lanes will be a part of a larger Georgia Express Lanes system, geared toward improving connectivity and mobility in the region for commuters, transit riders and the logistics industry, bringing an economic benefit to the Atlanta area and the entire state.” The project, which will add 29.7 mi. (47.8 km) of toll lanes in the I-75/I-575 corridor and from Akers Mill Road to Hickory Grove Road and along I-75/I-575 to Sixes Road, is the largest project the Georgia Department of Transportation has undertaken and the first P3 — Public Private Partnership — in the state. Archer Western Contractors and Hubbard Construction are the contractors on the project. Parsons Transportation Group is the design subcontractor. “One of our biggest challenges is this being a see DELK page 6

Construction crews recently reached another milestone in Georgia’s Northwest Corridor Express Lanes project.


Page 2 • February 17, 2016 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

%80%2)%.#% %80 0%2)%.# #%

%8#!6!4/2 %8#%,,%.#% %8#% % 8# #%,,%. % .#% #% The latest M-Series excavators feature new improvements – and smooth hydraulics – that enable you to dig your way out of extremely tough jobs.

Bobcat of Atlanta

STOP BY YOUR LOCAL DEALERSHIP FOR A DEMO AND CHECK OUT THESE FEATURES: Fuel-saving, communication-improving auto idle Effortless auto downshift Efficient two-speed drive motors Productive angle blade The industry’s only clamp-compatible extendable arm Protective, triple-duty rear counterweight and access panel Bobcat ®, the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Bobcat Company in the United States and various other countries. 14-B267

0 0!243 s 3%26)#% s 3!,%3 s 2%.4!, !243 s 3%26)#% s 3!,%3 s 2%.4!,


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • February 17, 2016 • Page 3

Quality Road Building and Maintenance Equipment

Call Today! 404-361-1593 Asphalt Paving & Maintenance Products Since 1977 µÕ « i ÌÊUÊ*>ÀÌÃÊUÊ-iÀÛ ViÊUÊ,i Ì> Ã Ê Ê Ê Ê Ê Ê Ê

Ê

Ê

Ê

Ê

Ê

ÊÊ

ÊÊ

www.ReynoldsWarren.com


Page 4 • February 17, 2016 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • February 17, 2016 • Page 5


Page 4 • February 17, 2016 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • February 17, 2016 • Page 5


Page 6 • February 17, 2016 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Crews Place Five Concrete Beams Over Delk Road DELK from page 1

P3, it’s new for everyone,” Hancock said. “It’s a lot of education we have to do for all the stakeholders involved. It’s a design-build project and the contractor is responsible for 10 percent of the funding for the project. The contractor has to be totally committed to the project one year from substantial completion. This is a very large project. The funding sources we have coming in are not all available up front. The stop gap financing is to get us through and also to make them more of a stakeholder in the project, too.” Crews used a 110-ton (99.8 t) crawler crane and 330-ton (299 t) Liebherr crane to lift the beams and forms into place, Hancock said. The bridge is 2,311 ft. (704.4 m) long, but not the longest on the project. The longest is 5,971 ft. (1,819.9 m), making it not only the longest on the project but also the third longest in the state. “One of the things we are trying to do is not disturb the existing intersection,” Hancock said. “This way we have the bridge going over it and it doesn’t impact the ramps or the highway. When completed the express lanes will be separated by barriers and part of an overall system of express lanes around Atlanta. The lanes will be reversible, running northbound away from

the city in the evening and southbound into the city in the morning. “The project began in about 2001 and it was an HOV extension that grew at one time into $4 billion project,” Hancock said. “The project we have now we came up with in 2009, when we scaled back the budget. Right now, it’s a $834 million project. “One of the great things is we’ve got a

good partnership with the joint venture. We’re making fantastic progress. We have several different crews — bridge crews, wall crews, drainage and roadway crews. They’ve been working on the northern section of the project. We’ve gotten a few comments with bridge being thrown over Delk Road. It’s an eye opener. People see that the project is here and they are seeing the effect.

The bridge on Delk Road is actually going up in August/September We have to tie it in the roadway. The completion date for entire project is 2018 and we have a lot more to go.” (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG

Once completed, the Express Lanes bridge over Delk Road will include 68 beams, each weighing more than 110,000 lbs. (49,895 kg).


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • February 17, 2016 • Page 7


Page 8 • February 17, 2016 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.