Georgia 08 2015

Page 1

441

59

75

GEORGIA STATE EDITION

Cornella 19

A Supplement to:

Rome 85 27

Athens 441

Atlanta

20

Madison Augusta

85

20

Griffin 1

129

Milledgeville

75

La Grange

Macon

301

185 19

16

Dublin

Swainsboro Oak Park

Columbus

Statesboro

341 441 16

Lyons Americus

April 15 2015 Vol. XVII • No. 8

301

1

82

Dorchester

341

Cuthbert

75

Albany

84

Douglas Tifton

82

95

82

Blakely

Pearson

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Savannah

McRae Cordele

27

27 84

Moultrie

19 319

Bainbridge

84

Valdosta Thomasville

Waycross Brunswick 82

1 441

Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479

The Lofts Projects Strengthen Renaissance in Macon As part of a renaissance taking place in Macon, Ga., crews are in the midst of building a new business and student housing development adjacent to Mercer University. Macon-based Sierra Development is building a more than $40 million project, known as The Lofts at Mercer. Another project, The Lofts at College Hill, also is coming to life. Sierra Development, which built three phases of the Lofts at Mercer Village, is overseeing these latest endeavors. The Lofts at College Hill is expected to be open by fall, while The Lofts at Mercer should be completed next year. “Mercer has experienced three straight years of growth in its entering freshman class exceeding 10 percent,” said James Netherton, executive vice president of administration and finance. “Mercer has a three-year housing requirement Maryann Bates photo and needs additional housing for undergraduates to meet this growing demand. Lofts V has an opening date of July 2016, As part of a renaissance taking place in Macon, Ga., crews are in the midst of building a new business and stuwhich is essential for meeting the anticipated undergraduate dent housing development adjacent to Mercer University. link Phase V with the main campus. The bridge is a coophousing need for that school year. “Phase IV was designed to house law, medical and grad- erative venture of Macon/Bibb County, Sierra Development uate students. It will be used primarily in 2015 to 2016 for and Mercer. The bridge will not only be functional, but undergraduates. When Phase V is finished, Phase IV will monumental, announcing arrival in Macon as the new route return to its intended use and Phase V will be exclusively for to downtown is developed.” At the July 2014 groundbreaking for Phase IV construcundergraduates.” When construction of The Lofts at Mercer is complete, tion, Mercer President William Underwood told reporters, more than 800 beds of student housing will have been added “The Lofts at College Hill is another major step toward fulto the Macon campus since 2011, with a combined invest- filling the College Hill Master Plan. In less than five years ment of more than $100 million in the five lofts projects and we have been able to attract new residents, recruit new busihotel-restaurant development. The main challenge for those nesses, and improve the aesthetics in the College Hill involved with the overall project is minimizing impact on Corridor through partnerships like the one we have with Sierra Development. It has been a very productive collabouniversity operations. “The impact of any project depends on the location and ration.” David Papageorge, project manager of general contractor nature of the project,” Netherton said. “Communication, Piedmont Construction Group, said Phase IV is moving coordination and careful planning are required to lessen the impact and keep all affected fully informed.”Netherton said forward at a steady pace, with only about 5 percent of the the projects are beneficial to Macon/Bibb County and the work performed on Phase V. “[Phase V] site work, which is being managed by the university. owner, is basically done, and we are in the process of secur“Phase IV continues the economic development of the College Hill Corridor and contributes to the ongoing revital- ing the permits and ordering the rebar, steel and post-tension ization of Macon. It will bring new energy to an important tendons,” said Papageorge. “Phase IV, building two, is roughly 90 percent complete. area of the city. Phase V will greatly enhance what is becoming the primary entrance to the Mercer campus and what will We have started our internal pre-punch list to get it ready for become, with the Second Street Project, the new primary the owner’s punch list. On building one, the siding is being completed and the elevators are being installed. All the dryentrance to downtown Macon from Interstate 75. “Both are very exciting, not just for the University, but wall is hung and finished in the apartments. Prime painting also for the city. Each represents a significant step forward is well under way, and is being followed up by door, trim in enhancing Macon, and each should provide benefits well cabinet installation, flooring door hardware and MEP trim Piedmont Construction Group photo beyond just good housing for a growing student population. out.” Crews continue to work on Phase IV. There is a signature pedestrian bridge being constructed to see LOFTS page 6

By Cindy Riley

CEG CORRESPONDENT


Page 2 • April 15, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

KOBELCO EXCAVATORS

WE ARE BACK AND ALL KOBELCO

WE ARE YOUR

DEALER Atlanta, GA (404) 696-7210 (800) 239-2694 www.cowin.com


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • April 15, 2015 • Page 3

%80%2)%.#% %80 0%2)%.# #%

%8#!6!4/2 %8#%,,%.#% %8#% % 8# #%,,%. % .#% #% The latest M-Series excavators feature new improvements – and smooth hydraulics – that enable you to dig your way out of extremely tough jobs.

Bobcat of Atlanta

STOP BY YOUR LOCAL DEALERSHIP FOR A DEMO AND CHECK OUT THESE FEATURES: Fuel-saving, communication-improving auto idle Effortless auto downshift Efficient two-speed drive motors Productive angle blade The industry’s only clamp-compatible extendable arm Protective, triple-duty rear counterweight and access panel Bobcat ®, the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Bobcat Company in the United States and various other countries. 14-B267

0 0!243 s 3%26)#% s 3!,%3 s 2%.4!, !243 s 3%26)#% s 3!,%3 s 2%.4!,


Page 4 • April 15, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • April 15, 2015 • Page 5

*Offers valid through December 31, 2015. Certain restrictions may apply. Transactions must be a minimum of $1,000 for over the counter or through Yancey shop/field service. Yancey Bros. Co. Shop Service or Field Service labor can be included in the financing only if the CA AT® Tools oo Attachments for certain Compact Construction Equipment do not qualify for these Parts represent at least 50% of the invoice. Work Tools financial offers. Must be pre-qualified by Yancey Bros. Co. and approved for financing by Caterpillar® Financial Services Corporation. Financing done through customer’s Caterpillar Commercial Credit account. Standard Commercial Account transaction fees apply. This offer is made based on current financial information and may be withdrawn, changed or altered at any time without notice.

Albany 800.768.2892

Brunswick 800.299.5010

Dacula 800.545.2945

Savannah 800.755.8382

Washington 888.678.3211

Albany 800.768.2892

Brunswick 800.299.5010

Dacula 800.545.2945

Savannah 800.755.8382

Washington 888.678.3211

Augusta 800.446.5131

Calhoun 800.752.9804

Macon 800.633.5180

Statesboro 888.764.6506

Waycross 888.948.2443

Augusta 800.446.5131

Calhoun 800.752.9804

Macon 800.633.5180

Statesboro 888.764.6506

Waycross 888.948.2443

Austell 800.282.1562

Columbus 800.633.5240

McDonough 855.901.0100

Valdosta 800.755.6841

Austell 800.282.1562

Columbus 800.633.5240

McDonough 855.901.0100

Valdosta 800.755.6841

www.Y YanceyBros.com

www.Y YanceyBros.com

CA AT, CATERPILLAR, their respective logos, “Caterpillar Yellow” and the “Power Edge” trade dress, as well as corporate and product identity used herein, are trademarks of Caterpillar Inc. and may not be used without permission.

© 2015 Yancey Bros. Co. All Rights Reserved.


Page 4 • April 15, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • April 15, 2015 • Page 5

*Offers valid through December 31, 2015. Certain restrictions may apply. Transactions must be a minimum of $1,000 for over the counter or through Yancey shop/field service. Yancey Bros. Co. Shop Service or Field Service labor can be included in the financing only if the CA AT® Tools oo Attachments for certain Compact Construction Equipment do not qualify for these Parts represent at least 50% of the invoice. Work Tools financial offers. Must be pre-qualified by Yancey Bros. Co. and approved for financing by Caterpillar® Financial Services Corporation. Financing done through customer’s Caterpillar Commercial Credit account. Standard Commercial Account transaction fees apply. This offer is made based on current financial information and may be withdrawn, changed or altered at any time without notice.

Albany 800.768.2892

Brunswick 800.299.5010

Dacula 800.545.2945

Savannah 800.755.8382

Washington 888.678.3211

Albany 800.768.2892

Brunswick 800.299.5010

Dacula 800.545.2945

Savannah 800.755.8382

Washington 888.678.3211

Augusta 800.446.5131

Calhoun 800.752.9804

Macon 800.633.5180

Statesboro 888.764.6506

Waycross 888.948.2443

Augusta 800.446.5131

Calhoun 800.752.9804

Macon 800.633.5180

Statesboro 888.764.6506

Waycross 888.948.2443

Austell 800.282.1562

Columbus 800.633.5240

McDonough 855.901.0100

Valdosta 800.755.6841

Austell 800.282.1562

Columbus 800.633.5240

McDonough 855.901.0100

Valdosta 800.755.6841

www.Y YanceyBros.com

www.Y YanceyBros.com

CA AT, CATERPILLAR, their respective logos, “Caterpillar Yellow” and the “Power Edge” trade dress, as well as corporate and product identity used herein, are trademarks of Caterpillar Inc. and may not be used without permission.

© 2015 Yancey Bros. Co. All Rights Reserved.


Page 6 • April 15, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Phase V Development to Include 400-Space Parking Deck LOFTS from page 1

Phase IV is now winding down. The elevators are being installed and cabinet, trim and molding, doors and hardware, painting counter tops and MEP trim are currently all under way and in various stages of completion. All the major storm water is installed for Phase V, the building pad is to grade and the parking structure rough grade is 60 percent complete. On both projects, Piedmont is responsible for the underground MEP inside the building footprint and the entire building and parking structure. The owner handles and manages the demolition site work, landscape hardscape, telephones, CATV, security and FF&E. “Both projects have very limited site access,” said Papageorge. “Therefore, large amounts of planning and coordination have gone into properly sequencing the activities, deliveries and the personnel access. “The construction equipment used is typical for the stick framed structures. We have been using lulls and boom trucks to stock materials and remove trash. Small Bobcattype equipment is being used to dress up around the building. Aerial lifts are being used for the exterior siding, painting, glass and light installation. There were a couple of instances where concrete pumps were used to place the concrete for the slabs on grade, retaining walls and lightweight concrete on the roof. The precast parking structure will require the use of a large boom crane.” Phase IV involved an existing building that was demolished, while Phase V was a flat site with pecan trees. Both facilities consist of wood framing with gypcrete topping over the subfloors. The units have plastic laminate flooring and the corridors have a stained concrete finish, and the walls are painted gypsum board with solid core doors in the units. The main entrance doors are hollow, metal security doors. The kitchens have aesthetically appealing cabinets with stone tops. All the units come equipped with appliances. “Phase IV is remote from the campus and has not been challenging,” said Papageorge. “Phase V is directly across the street from Mercer and will have more Mercer involvement. However, this site is not on campus, and, therefore, will not have any student access. We will, however, have a higher degree of traffic control, and limited access on the side streets while construction is under way. “We have not been adversely affected by the weather. We have been fortunate and have been able to work weekends to pick up the time so far.” A new hotel and restaurants are slated for the block adjacent to The Lofts at Mercer, across Mercer University Drive from the Hilton Garden Inn. Details about that new development will be announced at a later date.

Located in the historic College Hill Corridor, The Lofts at College Hill will feature 146 one-and two-bedroom student apartments and 12,000 sq. ft. (1,114.8 sq m) of retail space when it opens later this year. Amenities will include a 3,800 sq. ft. (353 sq m) clubhouse, a fitness center with a yoga room and an outdoor gathering area with a fire pit, water feature and al fresco dining. The Lofts at Mercer will have 313 beds in one to four bedroom units, making it bigger than the three phases of Lofts at Mercer Village combined. “The biggest focus on all construction projects is to get the structure erected, roof installed and exterior skin and windows installed. Once the building dry-in milestone is reached, it opens up a myriad of space, and allows for the finish materials to be installed with a progression to project completion.” The Phase V development will include a 400-space parking deck that will be precast with brick inlay, and will include stairs and two elevators. A 10,000 sq. ft. (929 sq m) clubhouse will house the leasing office, media room, club area with pool table wet bar and sitting area. There also is a fitness area with bicycles, treadmills, stair masters/elliptical machines and a yoga room. The terrace will have a small covered area with a counter top, sink and TV. The majority of the space will have picnic tables and lounge chairs. A total of 14,000 sq. ft. (1,300 sq m) of first-floor office space will be used to house Mercer University personnel. Currently, this portion of the project is in the planning and development stage. “Both these projects are highly prized for their revitalization of areas in Macon,” said Papageorge. “They are providing highly needed housing for students as Mercer grows and expands. Along with the housing,

Maryann Bates photo

“Site constraints and a limited construction timetable challenged our design,” said GLA Associate Michael Friedman.

other business are being developed to support and spin off from these apartments. Phase IV has a retail space that will house restaurants and shops, Phase V will have restaurants and a hotel. All these bring jobs and revitalization to the city.” Geheber Lewis Architects of Atlanta served as the design team for both phases. GLA Associate, Michael Friedman, said the firm’s vision was clear. “Phase IV Lofts at College Hill is a community revitalization project that combines residential living within walking distance of restaurants and retail. Phase V Lofts at Mercer strives to expand the reach of Mercer University, acting as a gateway to both campus and downtown. Outdoor gathering areas and a 7,000 square-foot rooftop terrace will allow students plenty of areas to socialize and enjoy their time outdoors with fellow classmates. Mercer and the neighboring restaurant/retail/ hotel redevelopment will boost commercial growth for the surrounding area.” “Site constraints and a limited construction timetable challenged our design,” said

Piedmont Construction Group photo

Crews continue to work on Phase V.

Friedman. “Concerns with designing a contemporary building around existing historic structures was also a part of the challenge.” Energy-efficient windows and appliances and the use of locally produced and manufactured materials were part of GLA’s sustainability pledge. Phase IV’s contemporary style showcases a variety of cladding materials including brick, siding, reveal panel and corrugated metal, while Phase V’s contemporary style is predominantly brick with reveal panels. “It’s very exciting to be a part of Mercer University’s growth and Macon’s revitalization. It’s rewarding to see the community come together to celebrate the growth of the city.” Officials say the mixture of uses will create a social connection between students and residents, while the location of the lofts will create a physical connection, linking the interstate to College Hill and downtown Macon. Since the inception of the College Hill Corridor initiative, more than $91 million in public and private investment has been leveraged in the roughly 2 sq. mi. (5.1 sq km) area. Established by a grant to Mercer University in 2009, the College Hill Alliance helps the community in creating positive change to the College Hill Corridor, a two sq. mi. area between Mercer’s campus and Macon’s downtown business district. Founded in 1833 by Georgia Baptists, Mercer started as a boys’ preparatory school named Mercer Institute, and originally consisted of a red clay farm and two hewed log cabins. Today, Mercer is a comprehensive center of undergraduate, graduate and professional education, with more than 8,300 students and a dozen schools and colleges. For almost twenty years U.S. News & World Report has ranked Mercer among the leading universities in the South. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • April 15, 2015 • Page 7

Specializing in Road Building Equipment

!SPHALT 0AVERS s -OTOR 'RADERS 2OLLERS #OMPACTION %QUIPMENT #RACK 3EALERS s !SPHALT $ISTRIBUTORS 2OAD 7IDENERS s "ROOMS

Call Today! 877-4LEEBOY Asphalt Paving & Maintenance Products Since 1977 ÂľĂ•ÂˆÂŤÂ“iÂ˜ĂŒĂŠUĂŠ*>Ă€ĂŒĂƒĂŠUĂŠ-iĂ€Ă›ÂˆViĂŠUĂŠ,iÂ˜ĂŒ>Â?Ăƒ ĂŠ ĂŠ ĂŠ ĂŠ ĂŠ ĂŠ ĂŠ

ĂŠ

ĂŠ

ĂŠ

ĂŠ

ĂŠ

ĂŠĂŠ

ĂŠĂŠ

www.ReynoldsWarren.com


Page 8 • April 15, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Innovative. Intelligent. Integrated. D61i-23

Scan here to see the video.

Next Generation Machine Control No Masts

No Cables

No Connections

Factory installed Intelligent Machine Control — standard on the new D61i-23. Automated dozing —1st to last pass with finish grade performance. Intelligent blade assistance minimizes track slip and improves efficiency.

Conventional Machine Control

Komatsu — Customer driven solutions.

Alabama

ALABASTER ANNISTON BIRMINGHAM DECATUR DOTHAN

www.tractor-equipment.com

MOBILE MONTGOMERY SHOALS AREA TUSCALOOSA

Georgia ALBANY AUGUSTA CALHOUN COLUMBUS FOREST PARK

HOSCHTON KENNESAW MACON SAVANNAH

Florida PANAMA CITY PENSACOLA

Since 1943

www.komatsuamerica.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.