Georgia 26 2015

Page 1

441

59

75

GEORGIA STATE EDITION

Cornella 19

A Supplement to:

Rome 85 27

Athens 441

Atlanta

20

Madison Augusta

85

20

Griffin 1

129

Milledgeville

75

La Grange

Macon

301

185 19

16

Swainsboro

Dublin

Oak Park

Columbus

Statesboro

341 441 16

Lyons Americus

December 23 2015

Dorchester

341

Cuthbert

75

Albany

84

Douglas Tifton

82

95

82

Blakely

Pearson

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

301

1

82

Vol. XVII • No. 26

Savannah

McRae Cordele

27

27 84

Moultrie

19 319

84

Bainbridge

Valdosta Thomasville

Waycross Brunswick 82

1 441

Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479

Prototype School to Open in Roswell, Ga., in 2016 By Cindy Riley CEG CORRESPONDENT

Considered the next generation of the new, multi-story elementary school prototypes designed for the Fulton County Board of Education, the replacement Esther Jackson facility in Roswell, Ga., will open its doors in August 2016. Construction continues at a steady pace. “It’s an exciting project for us, because we are able to offer a state-of-the-art educational facility that’s beautiful and equipped with the latest in technology and energy-efficiency elements,” said Susan Hale, Fulton County Schools media relations manager. “The school where students are temporarily housed is identical in design, and students, parents and staff have been extremely pleased with it. They’re enjoying the 'rental' of that space , but will be equally excited to move into the new Esther Jackson building that's completely their own.” The school district purchased property on Highway 9, in order to construct a new elementary school serving as temporary quarters for students and teachers from Esther Jackson. The new structure serves as a ‘swing school,’ while the facility at the Martin Road site is being rebuilt. “The school they are in now will be renamed and will reopen to a new population of students next fall,” said Hale. “We are currently in the redistricting process to create that new student body and balance enrollments among other elementary schools in the area. The old Esther Jackson building was not only aging, but it was too small to house its student body. The opening of the new Esther Jackson Elementary School, and the soon-to-be-renamed West Roswell/Highway 9 elementary school site, will help alleviate overcrowding and balance enrollments among the area’s schools.” The prototype was created to address the limited availability of large land parcels within the county. The compact plan organization offers the same programmatic spaces and site amenities found in other Fulton County elementary school prototypes, but within the constraints of a smaller footprint. The school is organized in a linear east-west direction with K-5 classrooms stacked within the east wing,with the core functions — media center, music, gymnasium, cafetorium and administrative suites — at the west end of the building. This creates a vertical column of core spaces which can be isolated from the classroom spaces for afterschool and community-use functions. The layout of the school is less confusing to young children, and provides good opportunity for visual observation for administration and staff. It also allows for natural light within the corridors and in each classroom. The exterior

material selections include brick veneer, metal and cast stone trim, which provides long-term durability against the effects of weather, while offering a building that is low in maintenance. The school is being constructed through the one-penny education sales tax known as eSPLOST, which was approved by voters in November 2011. The tax is expected to raise $912 million for Fulton County school improvements over its five-year lifetime. A formal groundbreaking ceremony for the replacement school took place in October 2015. Esther Jackson’s approximately 15-acre site can support a full-time equivalent (FTE) of 850 students, with a core designed to allow expansion to an FTE of 1,000 pupils. The new school, serving a diverse population, will offer 54 regular classrooms, 11 special-purpose classrooms (including a specialized com-

puter lab and art classroom), five computer outlets in every class, two age-appropriate exterior play structures, a 10,000 sq. ft. (929 sq m) concrete play pad, state-of-the art fire alarm, energy management and computer network systems and an IP classroom television system. Carroll Daniel Construction Company of Gainesville, Ga., is the general contractor for the project. According to Henry Irvin senior project manager, the project is a fastpaced tear down and rebuild of approximately 130,000 sq. ft. (12,077 sq m). “The tear down of the existing school and replacement with a new facility is a lot to accomplish in one calendar year. “Demolition took place right after school let out for summer,” said Irvin. “It lasted approximately 40 days. Track see SCHOOL page 4

Collins Cooper Carusi Architects photo

Carroll Daniel Construction Company of Gainesville, Ga., is the general contractor for the project.


Page 2 • December 23, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

WGTC, CIS Celebrate Partnership With Showcase in Waco West Georgia Technical College (WGTC) and Crane trend,” said Dugan. He cited the importance of the State’s Event Highlights Industry Services LLC (CIS) held a program showcase and Move On When Ready program, but said cooperative efforts The ceremonial ribbon was held by two crane hooks in open house on Dec. 2 to celebrate their partnership through between government, institutions and private industry will honor of the Centered on Safety Training Center’s purpose the College’s Economic Development Division. likely have the biggest impact. to provide crane, rigging and construction craft training. The The ceremony took place at the Centered on Safety Those thoughts were echoed by WGTC President Steve event included crane operation and rigging demonstrations. Training Center on the Murphy Campus in Waco, Ga., Daniel, who welcomed Crane Industry Services. “It takes Cliff Dickinson, president of Crane Industry Services, which showcased hands-on, job specific training for the employers, educators, and private business working together enlisted volunteers from among the guests to demonstrate crane and rigging industry. in order to provide the expertise and types of technical traintypical rigging tasks, such as how to turn a load, finding load Approximately 40 people, including Mike Dugan, center of gravity, and proper hand signals. Terry Norris and Georgia state Sen. attended. Other guests included Angela ing that the industry seeks,” he said. Gary Lloyd, Crane and Rigging Specialists Royal of the Georgia Department of Labor; Vann Pelt, vice president of Aubrey Silvey for Crane Industry Services, demonstrated Enterprises, which provided the cranes for basic crane operation. the Showcase; representatives from busiCourses delivered by CIS’s certified ness development group Carroll Tomorrow, instructors are essential to construction, Carroll and Haralson County chambers of utilities, power generation, manufacturing, commerce, as well as contractors, utility and mining and refining. Courses include companies and union representatives. basic and advanced rigging; rigging inspecThe availability of expanded technical tor; crane operator training, certification courses comes at a time when construction and qualification for mobile, overhead and starts are growing in Georgia, while the labor supply fails to meet to the demand. tower cranes; crane inspector; crane site “Our entire state is experiencing shortsafety management; and power line safety ages of skilled laborers. Many were lost to for utility workers. Additional courses are other forms of employment during the in development. Custom courses and open Great Recession. But there is also a genera- (L-R): Daniel Jackson and Andy Camp, both of Carroll Tomorrow; Georgia Sen. Mike tion that has lived through a heavy empha- Dugan; Steve Daniel, WGTC president; Cliff Dickinson, CIS president; Debbie Dickinson, enrollment options are available. (This story also can be found on sis on attending traditional four-year uni- CIS CEO; G.W. Rogers, WGTC; Laura Gammage, WGTC; and Tara Chapman, Haralson Construction Equipment Guide’s Web site at versities rather than learning a trade. In Chamber of Commerce, attend the Dec. 2 program showcase and ribbon cutting cerewww.constructionequipmentguide.com.) Georgia, we are working hard to reverse the mony.


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • December 23, 2015 • Page 3

Quality Road Building and Maintenance Equipment

Call Today! 404-361-1593 Asphalt Paving & Maintenance Products Since 1977 µÕ « i ÌÊUÊ*>ÀÌÃÊUÊ-iÀÛ ViÊUÊ,i Ì> Ã Ê Ê Ê Ê Ê Ê Ê

Ê

Ê

Ê

Ê

Ê

ÊÊ

ÊÊ

www.ReynoldsWarren.com


Page 4 • December 23, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Carroll Daniel Construction Company photo

Considered the next generation of the new, multi-story elementary school prototypes designed for the Fulton County Board of Education, the replacement Esther Jackson facility in Roswell, Ga., will open its doors in August 2016. Construction continues at a steady pace.

Crews Make Effort to Stay Ahead of Winter Challenges SCHOOL from page 1

hoes were used for the structure demolition.” Approximately 60,000 cu. yds. (45,873 cu m) of dirt/material will be moved on the project. Currently, structural steel erection of the café and administration areas is taking place, along with roof decking over the three-story section, MEP rough ins on the first and second floors, exterior sheathing, wall layout on the third floor and prepping and pouring the exterior site retaining walls. Finishes, glass and glazing and roofing are among the tasks that have yet to be carried out. Equipment at the site includes scissor lifts, which are

being used to install overhead systems. Lulls and forklifts are required to unload trucks and bring materials to the building. Cranes are being utilized to erect steel and set materials on the roof, while skidsteers and dozers are needed to maintain the site. Excavators were used for underground utility installation, and concrete pump trucks are on hand for slab pours. Some of the main materials being used include structural steel, concrete, metal studs and sheathing/drywall. Irvin said crews have made a special effort to stay ahead of the challenges that come with winter conditions. “We try to get asphalt binder down before the rainy cold months to stage the project from. We are trying to roof and

James Cagle/ Collins Cooper Carusi Architects rendering

A rendering of the completed Esther Jackson facility.

sheath the building before the cold weather really sets in.” Workers made a point of placing as much concrete as possible in advance of the wet season. “We tried to install as much of the underground utility infrastructure as possible early on in the project. This allows for the placement of asphalt and concrete. We can then stage the project off these surfaces instead of fighting mud that comes from the rainy season at the end of the year,” Irvin said. The most time-consuming part of the job has involved making sure that all the pieces of the project are approved, fabricated, delivered and installed at the time they are needed, as the schedule allows for no room for slippage. Reviewing submissions, checking shop drawings, sequencing work and subcontractors in the most efficient manner possible have all been integral and crucial parts to maintaining the schedule. The remediation of some soils was an unforeseen condition that also had to be addressed. Assistant project manager Jay Wilhoite said, “hitting unsuitable soils delayed the project, and was mitigated by working extra hours, nights and weekends to pick back up to remain on schedule.” Crews have already completed grading of the new site, as well as underground detention, curb and gutter and the pouring of slab on grade. “Once we have a roof on the building, weather will no longer be able to dictate working days and we’ll begin transitioning into installing glass and glazing, hanging drywall, installing ceilings, flooring and swinging doors,” said Wilhoite. Although officials have chosen not to pursue any thirdparty certification, the new school would likely qualify for a LEED Silver or higher rating. Some of the notable sustainability components include high efficiency mechanical syssee SCHOOL page 8


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • December 23, 2015 • Page 5


Page 6 • December 23, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

LET US MAKE YOUR DOWN PAYMENT. IT’S LIKE PUTTING MONEY IN YOUR POCKET.

00

$4,496

NOT IN THE MARKET FOR OR A MINI EXCA AV VATOR? ATOR? CHECK OUT THESE OTHER DOWN OWN P PA AYMENT OFFERS:

$6,58900

$9,53200

$9,73300

Albany 800.768.2892

Brunswick 800.299.5010

Dacula 800.545.2945

Savannah 800.755.8382

Washington 888.678.3211

Augusta 800.446.5131

Calhoun 800.752.9804

Macon 800.633.5180

Statesboro 888.764.6506

Waycross 888.948.2443

Austell 800.282.1562

Columbus 800.633.5240

McDonough 855.901.0100

Valdosta 800.755.6841

$13,36600

www.Y YanceyBros.com anceyBros.

*Offer valid from October 1, 2015 to January 31, 2016 on select new models, financed by Cat Financial, manufactured by Caterpilla Caterpillarr Inc. Building Construction Products Division. Offer available only at participating Cat dealers. Offer is available to cust customers omers in the USA and Canada only and cannot be combined with any other offers. Offer subject to machine availability availability.. Models shown here do not necessarily reflect the exact model and configuration to which the promotion applies. Offer down payments aare re based on a predetermined amount applied to the sale price. Remaining balances must be financed through Cat Financial and ar are e subject to credit approval through Cat Financial. Required down payment for credit approval may differ based on creditworthiness. The Equipment Protection Plan (EPP) applies to select models and is provided through Cat Financial for use at par participating ticipating Cat dealers. Prices do nott include taxes, freight, set-up, delivery, deliveryy,, document fees, inspections, additional options, or attachments. Final machine prices are subject to change. Offer may change without prior notice and additional terms and conditions may apply apply.. Contact your YYancey ancey Bros. Co. Machine Sales Representative for full details. Model and configuration used for promotional down payment calculation: 302.7D Micro Mini Excavator with long stick, cab with heat, straight blade, 12” bucket. bucket. © 2015 Caterpillar Caterpillar.. All Rights Reserved. CA CAT, T, CA CATERPILLAR, ATERPILLAR, TERPILLAR, BUIL BUILT LT FOR IT, IT T,, their respective logos, “Caterpillar “Caterpil Yellow,” Yellow w,” the “Power Edge” trade dress, as well as corporate corporat and product identity used herein, are trademarks of Caterpillar and may not be used without permission.


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • December 23, 2015 • Page 7


Page 8 • December 23, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Equipment on Site Includes Scissor Lifts, Lulls, Forklifts SCHOOL from page 4

tems and energy recovery, low VOC finishes and carpet that’s part of the “closed-loop” recycling program and LED light fixtures. Building envelope improvements such as continuous insulation on the walls and roof and pray foam insulation in wall cavities and spray applied air barrier systems were also incorporated into the design, along with large windows in every classroom for day-lighting and green spaces for outdoor instruction and play. Jeffrey Juliano, AIA, Collins Cooper Carusi Architects Inc., said the firm’s vision for this project was clear from the beginning. “We wanted to develop a solution that addressed Fulton County Schools’ programmatic requirements, and at the same time provide the flexibility to adapt to various teaching methodologies and accommodate current and future technological changes needed for students to learn and achieve. “The single most difficult challenge was the site size,” Juliano said. “Although it would become a design opportunity, the site was smaller than what we were accustomed to for an elementary school of this size. A portion of the site was designated wetlands, and much of the buildable area was dedicated to parking and outdoor play spaces, so we were limited to where and what we could build on the ground floor. As it would turn out, the small footprint pushed us to consider and eventually build a three-story solution. This provided the opportunity to create classroom and collaboration spaces on multiple floors which provided a variety of views and experiences.” Juliano said creating just the right space was no small task. “Schools in particular can have a profound impact on a student’s ability to learn, especially elementary schools,

Collins Cooper Carusi Architects photo

Approximately 60,000 cu. yds. (45,873 cu m) of dirt/material will be moved on the project.

Multivista photo

The school is being constructed through the one-penny education sales tax known as eSPLOST, which was approved by voters in November 2011. The tax is expected to raise $912 million for Fulton County school improvements over its five-year lifetime.

since this is likely their first experience in a structured environment that is not day-care or pre-school. The quality of this environment can set the foundation for future learning and achievement. Chief among our concerns is the creation of an environment where the student feels safe and secure. We paid special attention to the materials used in the construction of the building, how the building will maintain a healthy environment for future generations and how the physical arrangement of spaces allow students to explore their surroundings.

“There really isn’t a particular feature we can single out, but more an overall experience of the entire building. We are interested in seeing how the various collaborative spaces will be used. We can plan a space for a particular use, but it's interesting to see how the staff then interprets the use into a whole new thing that we did not think of,” said Juliano. For Juliano and the rest of the team, having the school blend in with the community also was important. “The surrounding neighborhood is primarily residential. We didn’t want to reconstruct a big house, but we did want

to fit in materially. The new school is mostly brick veneer with stucco. In addition, we have gabled roofs with large overhangs. “In general, schools are different from other projects. During the formative years, a child will spend as much time in school as they will at home, and the experience can have a profound impact. First and foremost, the student should feel safe and secure. This will set the environment for a student to be open to learning. From there it's about opportunities for interaction between staff and fellow students. We think a lot about the 'in-between' spaces where students talk and make friends, such as the small corners of a hallway or scaled areas within a larger space. We provide the structure to enhance the experience of learning.” Approximately 85 percent of our work is in the educational market,with a little more than 50 percent of that in the public and private K-12 sector, so we have a very good understanding of how schools work and, just as important, how students learn. We know now that hands-on activities have a much greater impact and lasting impression than traditional teaching methods. We also understand students learn best when they are comfortable, safe and have experiences that touch all their senses. We try to provide these kinds of experiences through color, daylight, variety of classroom/collaboration spaces, including outdoor classroom opportunities, and the proper selection of furnishings.” As for what students, teachers, parents and visitors should take away from the new facility Juliano said, “our hope is that they recognize there is something different in their experience of this school — that it makes for an environment they want to be in and be a part of. Our goal is to provide an environment that enhances the learning process.” (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • December 23, 2015 • Page 9

%80%2)%.#% %80 0%2)%.# #%

%8#!6!4/2 %8#%,,%.#% %8#% % 8# #%,,%. % .#% #% The latest M-Series excavators feature new improvements – and smooth hydraulics – that enable you to dig your way out of extremely tough jobs.

Bobcat of Atlanta

STOP BY YOUR LOCAL DEALERSHIP FOR A DEMO AND CHECK OUT THESE FEATURES: Fuel-saving, communication-improving auto idle Effortless auto downshift Efficient two-speed drive motors Productive angle blade The industry’s only clamp-compatible extendable arm Protective, triple-duty rear counterweight and access panel Bobcat ®, the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Bobcat Company in the United States and various other countries. 14-B267

0 0!243 s 3%26)#% s 3!,%3 s 2%.4!, !243 s 3%26)#% s 3!,%3 s 2%.4!,


Page 10 • December 23, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Jefferson • Morgan • Pike • Warren • Burke • Lamar • Fannin • Walton • Fayette • McIntosh • Jenkins • Laurens • Lowndes • Coweta • Georgia... Calhoun • Quitman • Glascock • Walker • Tattnall • Ben Hill • Colquitt • Lumpkin • Randolph • Oglethorpe • Columbia • Gilmer • Bryan • Effingham • Putnam • Murray •Peach • Jefferson • Morgan • Pike • Warren • Burke • Lamar • Fannin • Walton • Fayette • McIntosh • Jenkins • Laurens • Lowndes • Coweta • Calhoun • Quitman • Glascock • Walker • Tattnall • Ben Hill • Colquitt • Lumpkin • Randolph Jefferson • Morgan • Pike • Warren • Burke • Lamar • Fannin • Walton • Fayette • McIntosh • Jenkins • Laurens • Lowndes • Coweta • Calhoun •

‘Peach State’ Highway Project Bids

The Georgia State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. Counties: Appling and Pierce Proposal Number: 001 - B14993-15-000-0 Location: On CR 305 over Big Satilla Creek and over Big Satilla Creek overflow. Project: 0.464 mi. of construction of two bridges and aproaches. Contractors and Bid Amounts: • Tic-The Industrial Company — $5,254,014 • Southern Concrete Construction Company Inc. — $5,352,447 County: Camden Proposal Number: 009 - B14973-15-000-0 Location: On SR 40 beginning at U.S. 17/SR 25 and extending west of Kings Bay Road. Project: 2.811 mi. of milling and plant mix resurfacing. Contractors and Bid Amounts: • East Coast Asphalt LLC — $1,481,071 • Plant Improvement Company Inc. — $1,569,289 County: Camden Proposal Number: 010 - B14979-15-000-0 Location: On SR 40 beginning west of City Smitty Drive and extending to East and West Church Street and on SR 40 Spur beginning at SR 40 and extending east of Douglas Drive. Project: 3.568 mi. milling and plant mix resurfacing. Contractors and Bid Amounts: • Plant Improvement Company Inc. — $1,700,365 • East Coast Asphalt LLC — $1,721,571

County: Cobb Proposal Number: 014 - B14970-15-000-0 Location: On SR 120 beginning at Bridgegate Drive and extending to the Fulton County line. Project: 5.407 mi. of milling, inlay and plant mix resurfacing. Contractors and Bid Amounts: • Baldwin Paving Company Inc. — $2,346,311 • C. W. Matthews Contracting Company Inc. — $2,545,164 • E. R. Snell Contractor Inc. — $3,064,431 • Stewart Bros. Inc. — $3,255,760

County: Chatham Proposal Number: 012 - B14968-15-000-0 Location: On SR 204 (Abercorn Street) beginning east of Gateway Boulevard and extending west of Pine Grove Drive. Project: 3.175 mi. of milling and plant mix resurfacing. Contractors and Bid Amounts: • Preferred Materials Inc. — $1,569,443 • Reeves Construction Company — $1,738,975 • Carroll & Carroll Inc. — $2,069,954

County: Forsyth Proposal Number: 018 - B14998-15-000-0 Location: On Bethelview Road (CR 455) beginning at Castleberry Road (CR 8) and extending to SR 20; also includes construction of a bridge and approaches over Big Creek. Project: 5.152 mi. of widening and reconstruction. Contractors and Bid Amounts: • CMES Inc. — $36,914,437 • Baldwin Paving Company Inc. — $37,271,531 • C. W. Matthews Contracting Company Inc. — $37,500,703 • G.P.’s Enterprises Inc. — $38,907,901

County: Chatham Proposal Number: 013 - B14978-15-000-0 Location: On U.S. 80/SR 26 beginning at Gray Creek and extending east of Bull River Bridge. Project: 5.203 mi. of milling and plant mix resurfacing. Contractors and Bid Amounts: • Preferred Materials Inc. — $2,190,416.30 • Carroll & Carroll Inc. — $2,444,444 • Reeves Construction Company — $2,573,587

County: Fulton Proposal Number: 020 - B14881-15-000-0 Location: On SR 140 at Hembree Road (CR 186). Project: Construction of a roundabout. Contractors and Bid Amounts: • Baldwin Paving Company Inc. — $4,470,204 • C. W. Matthews Contracting Company Inc. — $4,555,005

• CMES Inc. — $4,614,690 • Vertical Earth Incorporated — $5,058,020 • Astra Group Inc. and Affiliates — $5,986,888 County: Houston Proposal Number: 023 - B14990-15-000-0 Location: On SR 247 connector beginning west of Houston Lake Road (CR 535) and extending to U.S. 129/SR 247. Project: 5.005 mi. of milling and plant mix resurfacing. Contractors and Bid Amounts: • C. W. Matthews Contracting Company Inc. — $2,933,166 • Reeves Construction Company — $3,115,675 • Georgia Asphalt Inc. — $3,143,625 Counties: McDuffie and Wilkes Proposal Number: 026 - B14908-15-T00-0 Location: On U.S. 78/SR 10/ SR 17 beginning at Smith Mill Road (CR 6) and extending south of the Washington Bypass; also includes construction of 2 bridges and approaches over Little River. Project: 9.699 mi. of widening and reconstruction . Contractors and Bid Amounts: • Reeves Construction Company — $41,417,000 • E. R. Snell Contractor Inc. — $41,775,946 • Pittman Construction Company — $44,325,156 • G.P.’s Enterprises Inc. — $47,547,049 County: Monroe Proposal Number: 028 - B14906-15-000-0 Location: On SR 18 at U.S. 23/SR 87. Project: Construction of a roundabout. Contractors and Bid Amounts: • Georgia Asphalt Inc. — $3,251,274 • C. W. Matthews Contracting Company Inc. — $3,449,921 • Reeves Construction Company — $3,584,747


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • December 23, 2015 • Page 11

Hitachi ZX50U w/NPK GH3 Hammer

Please Call For Pricing!


Page 12 • December 23, 2015 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.