NewEngland #7,2013

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

FormErly

95

202

7

®

91

9

95

93

2

95 2

93 90

90

7

March 27 2013

95 91

7

495 6 195

395

95 91

3

84 6

84

6

E

q

u

I

P

M

E

N

T

g

u

I

D

E

95

95

Vol. XlIX • No. 7

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection •  Kent Hogeboom 1-800-988-1203

2013 EZ-Screen 1200XL

Kraft Power Corporation Perkins Master Service Dealer NJ, MA & NY Engines, Parts & Service

800-969-6121 www.kraftpower.com

WE STOCK RUBBER TRACKS for Over 2,500 Models! New Option Separate 3 Products

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

$39,500 plus freight. Other Screeners Available

ArguS INDuSTrIAl CO. www.ez-screen.com

866-745-5828

Some Used Tracks Available.

BEST PRICES! • GUARANTEED TO FIT • HIGH QUALITY • FAST SHIPPING

888-888-1248

WANTED CATERPILLAR EQUIPMENT Call Lou Giza

603-595-2090 Kraft Power Corporation

Engines, Parts & Service

800-969-6121 Woburn, MA & Syracuse, NY

Authorized Deutz Distributor

www.foleyengines.com

WANTS YOUR HAMMER REPAIR

Auctioneering & Liquidation

CALL 888-81-GORILLA

www.itlauctions.us

(46745)

ITL Auctioneering Justin Lyerla (508) 824-3262

w

State DOTs Hire Influx of Contractors to Dig States Out of Snowstorm Nemo By Jay Adams

40-Plus Inches of Snow While thousands of New They didn’t have to find England towns and cities Nemo. Nemo found them. were buried, Hamden, Hundreds, if not thouConn., was one of the hardsands, of contractors were est hit in the blizzard of temporarily hired by state 2013, seeing an astonishing DOTs and municipalities as 40-plus inches of snow. private vendors in the states Hamden also is the town of Connecticut, Rhode Sweeney Excavation Inc. has been headquartered for Island and Massachusetts, 26-plus years. Sweeney was among other New England ready. states, to dig out from the “Immediately following worst single snowstorm to the storm, we placed four hit the area in 40 years. pay loaders with the town of During the 30 or so hours Hamden and soon after disthat the storm raged over patched two tri-axle dump Feb. 8 and 9, pay loaders, trucks to assist with moving dump trucks, front loaders the snow from the streets to and other snow-clearing the parks throughout the vehicles were commantown where we piled the deered by the hardest-hit snow,” said Bob Sweeney, cities and states on tempoowner of Sweeney rary contracts to remove the Excavation. “These locasnow that in some areas tions became known as came in record-breaking snow farms.” amounts. Hamden collectively Governors imposed drivhired 30 to 40 pay loaders ing bans for two days and the from private contractors and only vehicles allowed on received additional assisroads were those sporting plows. Commuter traffic Hamden collectively hired 30 to 40 pay loaders from tance from the National was ordered stalled in order private contractors and received additional assis- Guard. “The first task after the that the plows and other tance from the National Guard. storm was to simply open all heavy iron could drive snow off highways to clear paths for emergency vehicles, police, roads in town to allow two-way traffic. Once done, the roads fire, ambulance and especially power companies to restore were then opened up from curb to curb, which exposed energy to hundreds of thousands of New Englanders who drainage structures and allowed melting snow to run off into lost it; some — like in Marion, Mass. and the Cape — for up drainage systems,” added Sweeney. “Where snow needed to be removed to accomplish this, it was loaded onto dump to six days. DOTS and state governments were lauded, for the most trucks and taken to the snow farms. “Our loaders and trucks worked 24-hour cycles starting on part, for their plowing plans which worked quickly, due in large part to the hard work of the private vendors who were Feb. 11 and ending at noon on Feb. 17. Collectively, we regular guys with plows. see NEMO page 4

CEG CORRESPONDENT


Page 2 • March 27, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

THE W.I. CLARK COMPANY Brookfield, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316

1998 Deere 410E

2008 Deere 524K

c/heat, 4x4, std hoe, 2000 original hours

2006 Deere 544J

c/air, hi lift, hi- vis hyd coupler w/2.75 yd bucket, radials

2003 New Holland LS180 c/heat, gp bucket, 80% rubber, great snow machine

A/C, RC, 3rd valve hyds, JRB hyd cplr and 3 yd bucket

stk# 21372 ..........................$47,500

stk# 20889 ........................$110,500

stk# 21348 ........................$127,500

stk# 21417 ............................$24,000

Deere 450D

2007 Deere 50D

2011 Deere 270DLC

2004 Hitachi ZX270LC

ROPS, 6 way blade, 2240 original hours

ROPS, 890 hours, hydraulic thumb

c/air, 10' 6" arm, 54" bucket

c/air, 10' 8" arm, 42" pin on bucket

stk# 21370 ............................$13,500

stk# 20936 ..........................$42,500

stk# 20958 ........................$189,000

stk#21442 ..........................$126,000

IR P185WJD

1988 Deere 570B

2006 Deere 250D

2009 Carlson CP-90

Deere powered, 90% rubber, 3 to choose from

c/heat, 12’ blade, front scarifier, 80% rubber, 833 original hours

Starting at 6,000

stk# 21413 ..........................$65,000

WHEEL LOADERS 2011 DEERE 244J, C/AIR, R/C 3 VALVE HYDS, 1 YD BUCKET WITH HYD CPLR, EXCELLENT CONDITION, STK# 22179 ..............$72,500

Cat engine, 8-15’ electric screed, 416 demo hours, excellent condition

25 ton haul truck, c, air, 80% radials, tailgate, great condition

stk# 20949 ........................$146,500

stk# 20713 ........................$110,500

DOZER – CRAWLER 1984 DEERE 450D, 6 WAY BLADE, GOOD CONDITION, STK# 21370 ..............................................................................................$13,500

2008 DEERE 344J, A/C, RC, 3RD VALVE HYDS, HYD COUPLER, 920 HRS, STK#20274 ..................................................................$98,500 2004 DEERE 544J, C/AIR, RC, RADIALS, 3RD VALVE HYDS., JRB COUPLER, 2.5 YD BUCKET, STK#20904 ............................$121,000

2007 DEERE 1050J, A/C, 24" PADS, 159" SEMI-U BLADE, MS RIPPER, NEW PAINT, STK#20688 ............................................$315,000 EXCAVATOR – CRAWLER

2007 DEERE 544J, C/HEAT, HI-LIFT, 2 FUNCTION HYDS., STK#21419 ........................................................................$102,000

2004 KOBELCO SK115SRDZ, 9’8” ARM, HYD THUMB, 32” BKT,

INTERNATIONAL 530, EX-MUNICIPAL LOADER, 3 YD BUCKET, NEW ENGINE AND TRANS APPROX 4 YEARS AGO ......................$17,500

MOTOR GRADER

COMPRESSORS IR P185WJD, DEERE POWERED, 90% RUBBER, 2 TO CHOOSE FROM ..............................................................STARTING AT $6,000

BLADE, 24” PADS, LOW HOURS, STK# 21428 ....................$66,500

1988 DEERE 570B, C/HEAT, 12’ BLADE, FRONT SCARIFIER, 80% REAR RUBBER, 833 ORIGINAL HOURS, FULLY SERVICED, STK# 21413 ....................................................................................$65,000

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 27, 2013 • Page 3

MASSACHUSETTS

CONNECTICUT

251 Shaker Road, East Meadow, MA 01028 Direct: 413-525-6351 Toll Free: 800-292-6351 Parts Direct: 877-255-6351

1980 Berlin Turnpike, Berlin, CT 06037 Direct: 860-356-0840 Toll Free: 800-352-4473 Parts Direct: 860-356-0848

www.tylerequipment.com

www.tylerequipment.com

2005 VOLVO EC240B LC, Stk #: 12231, S/N: 11777, 3900 Hrs, This unit is in our East Longmeadow office. Call 1-800-352-4473 ........................$97,500

2002 VOLVO EC35, S/N: 28314849, 3475 Hrs, 2002 VOLVO MINI-EXCAVATOR, Call 1-800-352-4473 for more information! ......................................$25,000

2010 VOLVO HB1100, Hyd. 2300 ft/lb hammer, w/S6 Manufacturer Plate, New Hoses Chisel Point. 6 Month Mgf. Warranty ..............................$33,500

2006 INGERSOLL-RAND DD90HF, Stk #: 8650, S/N: 190361X, 1250 Hours, 66” Drum, Work Lights, Cummins Diesel ..............................$57,000

2007 INGERSOLL RAND DD90HF, Stk #: 8333, 1200 Hrs, 66” Drums, Cummins Diesel Eng., Work Lights, ROPS Lights and Strobe ................$57,000

2006 VOLVO EC460B LC, S/N: 80090, 7420 Hrs, Many New Parts; Track Chains, Sprockets, etc. READY TO WORK! ....................................$156,000

CHIPPERS

ATTACHMENTS

1992 MORBARK 290, S/N: 8061, 2194 hours ......................................................$6,000

2008 MSD250R Shear, S/N: 626034, Full Rebuilt by Genesis in 2012, 0 Cycles, Bracket Fits Most Brands w/a Bushing & Pin Kit, FOB Superior, WI ..............................$136,500

1990 OLATHE 986, #11957, 2309 Hrs, 12” Brush Chipper has Ford Diesel Engine and all the Parts and Service Manuals, Call Tom Tyler, VP at 203-509-0967................$6,000

EXCAVATORS

Volvo Construction Equipment

2005 SENNEBOGEN 850M, S/N: 850.0.149, 0 Hrs on Brand New Boom! ........$295,000


Page 4 • March 27, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Blizzard Challenges Include Round-The-Clock Service NEMO from page 1

worked approximately 1,000-man hours in that time span not including the hours worked by managers, fuelers and mechanics,” said Sweeney. The largest challenges vendors like Sweeney faced included getting operators plugged into shifts to allow for 24-hour, round-the-clock service to which private vendors are not accustomed. “We kept the loaders out moving on the roads. Each new crew of operators reported to our shop, we drove those operators to the pay loaders to swap out with the previous shift and then drove that off-duty crew back to our shop. We had staff to cycle to every loader to deliver fuel and grease every eight hours,” he said. “Each loader had three eight-hour shifts; there- Private vendor loaders and dump trucks spent endless hours clearing in hard-hit ares of New England. The coordination of all the venfore, we had 12 operators for four pay snow dors, not normally on 24-hour duty, was a challenge handled well by all loaders. Tri-axles worked two 12-hour involved. shifts, so we had four drivers for two dump trucks. We had one supervisor and one mechanic/fuel- ily speak with the 40 private pay loader operators. Even er on every eight-hour shift. Therefore, it took 22 people to more challenging was that a large majority of Hamden’s hired contractors were from out of town and even out of complete one 24-hour day,” he added. state. “These operators did not know the streets or how to get Other Blizzard Challenges Communication also was a challenge. Officials in towns [to] the streets at which they were needed,” said Sweeney. After some initial clearing to get major roads opened, the like Hamden were trying to direct this large workforce to all sections of their communities, but they were not able to eas- town made a decision to send two loaders with each of their

NEW ENGLAND EDITION Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Asst. Circulation Mgr. Main office

Toll Free Fax Web site Editorial e-mail Advertising e-mail

For advertising rates: Contact

Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Reckner Pete Sigmund John Pinkerton Tom Weinmann Rolf Krog Cathy Printz

470 Maryland Drive Fort Washington, PA 19034 215/885-2900 800/523-2200 215/885-2910 www.constructionequipmentguide.com editorial@cegltd.com production@cegltd.com

Edwin M. McKeon Jr.

215/885-2900 800/523-2200 215/885-2910 e-mail tmckeon@cegltd.com

Toll Free Fax

Kent Hogeboom •New York •New England 315/823-7668 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com Contact

Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2013, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.

Hundreds, if not thousands, of contractors were temporarily hired by state DOTs and municipalities as private vendors in the states of Connecticut, Rhode Island and Massachusetts, among other New England states, to dig out from the worst single snowstorm to hit the area in 40 years.

plow trucks to the specified routes that the local plow truck drivers knew very well. Plow truck drivers would then direct the loaders under their supervision. They were in constant communication with the Hamden Public Works main office to monitor progress, setbacks and challenges. “Personally, I found this to be a great solution to the problems the town was facing at that point. Hamden has some great representation in Public Works, employees such as Mike Siciliano, David Lockery and Joe Callella. These three supervisors, as well as the countless town-employed drivers and operators, really made a Herculean effort and rose to the challenges in front of them, during some extremely difficult and stressful moments,” said Sweeney. Little Rhody, Big Storm Rhode Island employed 400 private vendors during Nemo, joining 150 state employees working the roads and highways. The state used 100 DOT plow trucks, five loaders and other vehicles at 21 snow stockpile sites that were opened to accommodate the untold tons of cleared snow. The stockpiles were located in the state’s seven maintenance districts — Northwest, Providence, Bristol, Newport, Kent, Washington North and Washington South. “There were other vendors [hired], also,” said Heidi Gudmunson of the RIDOT Communications division. “We had a heavy tow plan in place, meaning four tractor trailersized tow trucks [otherwise known as heavy wreckers] were positioned around the state readily available to help, as needed. We also had tree trimming vendors mobilized throughout the storm, to clear the way for plows etc., as necessary. “The state DOT also had four front-end loaders to help dig out emergency shelters, park and ride [bus stops], highway drifts, etc.,” added Gudmunson. see NEMO page 11


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 27, 2013 • Page 5

“The RM60 crusher has been the best investment that I have made for my asphalt manufacturing plant. The low ownership costs, ease of operation and consistent production in both RAP & recycled aggregates makes the RM60 stand out. Day in and day out the RM60 gives me the highest quality material that is used in our daily productions. I have also received outstanding support from our dealer and factory. Jeff Joaquin Pawtucket Asphalt, Pawtucket, RI

See Jeff and the RM crusher at the World of Asphalt Show booth #2955 in San Antonio, TX

Sales • Parts • Service • Rentals 226 Selleck St. Suite C • Stamford, CT 06902

(203) 569-0339

A

STRONGCO Company

Chadwick-BaRoss, Inc. 15 Katrina Road • Chelmsford, Massachusetts (800) 804-0775 • (978) 256-9571 Fax: (978) 256-8802 www.chadwick-baross.com • www.cbused.com


Page 6 • March 27, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc •Maine... Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc

‘Pine Tree State’ Highway Projects Let

The Maine Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Waldo Contract ID: 016350.00 Location: Stockton Springs. Project: New and upgraded sidewalks and drainage improvements. Contractors and Bid Amounts: • R F Jordan & Sons Construction Inc. — $561,916 • Gary M Pomeroy Logging Inc. — $573,908 • Gardner Construction Enterprises LLC — $575,495 • Maine Earth — $577,357 • R A Paradis & Son — $645,000 • Sargent Corporation — $679,889 • Pratt & Sons Inc. — $684,883 • Sitewerx — $689,800 • Farley & Son Inc. – $706,777 • CPM Constructors — $717,077 • T. Buck Construction Inc. — $795,500 • Lane Construction Corporation (The) — $884,991 • Hughes Brothers Inc. — $898,100 County: Oxford Contract ID: 019292.00 Location: Bog Brook Bridge. Project: Bridge replacement. Contractors and Bid Amounts: • Nelson Communications Services Inc. — $334,302 • Wyman & Simpson Inc. — $369,533 • K & K Excavation Inc. — $383,963 • N F Luce Inc. — $399,961 • T. Buck Construction Inc. — $420,400 • CPM Constructors — $430,933 • E L Vining & Son Inc. — $458,238 • McGee Construction — Irregular County: Waldo Contract ID: 017532.00 Location: Frankfort. Project: Strut replacement. Contractors and Bid Amounts: • Gardner Construction Enterprises LLC — $229,525 • Maine Earth — $231,798 • CPM Constructors — $253,800 • Sargent Corporation — $253,807 • Farley & Son Inc. — $256,926 • R F Jordan & Sons Construction Inc. — $258,955 • Wyman & Simpson Inc. — $264,609 • N F Luce Inc. — $284,674 • Stetson & Watson J. V. — $288,081 • Sitewerx — $297,690 • Bowman Constructors — $299,180 • T. Buck Construction Inc. — $312,312 • Lane Construction Corporation (The) — $313,978 • Hughes Brothers Inc. — $319,994 County: Aroostook Contract ID: 019322.00 Location: Island Falls.

Project: Bridge scour counter measures. Contractors and Bid Amounts: • Gardner Construction Enterprises LLC — $434,361 • Sargent Corporation — $565,297 • T. Buck Construction Inc. — $588,123 • Wyman & Simpson Inc. — $594,535 • CPM Constructors — $672,527 County: Cumberland Contract ID: 012757.00 Location: Standish. Project: Intersection reconstruction. Contractors and Bid Amounts: • Shaw Brothers Construction Inc. — $497,793 • Shaw Earthworks — $524,699 • Peters Construction Inc. — $528,086 • Brown Industrial Group Inc. — $543,080 • Gendron & Gendron Inc. — $559,999 • Pratt & Sons Inc. — $572,122 • A H Grover Inc. — $588,520 • R. J. Grondin & Sons — $606,948 • T. Buck Construction Inc. — $686,197 • CPM Constructors — $695,566 County: Penobscot Contract ID: 018320.00 Location: Bangor and Brewer (Joshua Chamberlain Bridge). Project: Bridge painting. Contractors and Bid Amounts: • Olympus Painting Contractors Inc. — $2,147,353 • Gulf Coast Contracting LLC — $2,870,999 • Blastech Enterprises Inc. — $3,041,442

• Panther Industrial Painting LLC — $3,596,939 • Atlas Painting & Sheeting Corporation — $3,939,000 • Abhe & Svoboda Inc. — $4,158,240 • Odyssey Contracting Corporation — $4,236,915 • Spartan Contracting LLC — $4,277,000 • Vimas Painting Company Inc. — $4,336,505 • North Star Painting — $4,737,872 County: Hancock Contract ID: 017258.00 Location: Blue Hill. Project: New roundabout. Contractors and Bid Amounts: • R F Jordan & Sons Construction Inc. — $843,047 • Maine Earth — $883,724 • Sargent Corporation — $940,028 • Lane Construction Corporation (The) — $954,822 • T. Buck Construction Inc. — $999,300 • CPM Constructors — $1,023,245 • Pike Industries Inc. — $1,342,105 County: Piscataquis Contract ID: 019306.00 Location: Abbot. Project: Bridge rehabilitation. Contractors and Bid Amounts: • T. Buck Construction Inc. — $1,319,688 • Reed & Reed Inc. — $1,396,298 • Wyman & Simpson Inc. — $1,514,477 • CPM Constructors — $1,582,639 • Technical Construction Inc. — $1,762,433 • Lane Construction Corporation (The) — $2,078,971 • New England Infrastructure Inc. — $2,794,446


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 27, 2013 • Page 7

The N.i.c.e. Company Northeast International Construction Equipment Co., Inc.

Maximum Output

“Your Newest Source for Quality Equipment”

I Buy Machines 2009 Cat 315DL, VERY NICE!!, 2200 Hrs, Plumbed $119,000

2009 Cat 336DL, 12’10” Stick, 6000 Hrs $169,000

2008 Volvo ECR88, QC, Tilting Bucket, Rotating Grapple, 2600 Hrs $59,000

2008 JD160D, QC, Hyd Thumb, 2600 Hrs, REDUCED $99,000

2006 Terex TXC300-2, Long Reach, 3300 Hrs $99,000

2008 Komatsu D51, EROPS, Very Nice! Only $99,000

2008 Doosan DL200 Loader, Only 1000 Hrs! Only $79,000!

2006 Cat 930G, 3300 Hrs, QC Nice! $89,000

1999 Cat 950G, Runs Good, Command Control, 16K Hrs $49,000

Cat 420DIT, Very Nice Machine! $38,500 Also in Stock: 420E & 420EIT

Now Off 495 in Franklin!!! 76 Grove St., Franklin, MA

508-966-4888 508-966-4887

Call Bryn Smith at:

Fax:

Email: brynsmith@thenicecompany.com

See all of my machines at www.thenicecompany.com

A tthe At he lowest low we t west ccost ost p per er ton! Clean Chips. Microchips. Biomasss. Land Clearing. For 30 yearss, Petterrson on chippers havve led tthe ZD\³ \³ ÀQG RXW PRUH DW www ww ww.p pettersoncorp.ccom y q p 30 Birch Island Road, Webster, MA PH: 508.949.0005 www.barryequipment.com 800-269-6520 • www.petersoncorp.com • PO BOX 40490 • Eugene, OR 97404


Page 8 • March 27, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham Hampshire... •New Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham

‘Granite State’ Highway Projects Let

The New Hampshire State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. Counties: Rockingham and Strafford Project: Resurfacing District VI 16166B and Strafford 25124. Scope of Work: Roadway resurfacing. Location: N/A. Contractors and Bid Amounts: • Pike Industries Inc. — $1,676,880 • Continental Paving Inc. — $1,751,112 • Brox Industries Inc. — $1,947,175 Scheduled Completion Date: Sept. 27, 2013 Counties: Hillsborough, Merrimack and Rockingham Project: Resurfacing District V 16165B, Canterbury 25561. Scope of Work: Roadway resurfacing. Location: N/A. Contractors and Bid Amounts: • Continental Paving Inc. — $1,879,525 • Pike Industries Inc. — $2,183,375 • Brox Industries Inc. — $2,271,352 Scheduled Completion Date: Sept. 27, 2013 Counties: Cheshire and Hillsborough Project: Resurfacing District IV 16164B and Rindge 24944. Scope of Work: Roadway resurfacing. Location: N/A. Contractors and Bid Amounts: • Continental Paving Inc. — $1,604,537 • Frank W. Whitcomb Construction Corporation — $1,723,445 • Brox Industries Inc. — $1,725,700 • Pike Industries Inc. — $1,726,362 • The Lane Construction Corporation — $1,954,465 Scheduled Completion Date: Aug. 23, 2013 Counties: Belknap, Carroll and Grafton Project: Resurfacing District III, 16163B Sanbornton, 25616. Scope of Work: Roadway rehabilitation. Location: N/A. Contractors and Bid Amounts: • Pike Industries Inc. — $1,854,820 • Continental Paving Inc. — $1,918,690 Scheduled Completion Date: Aug. 23, 2013 Counties: Coos and Grafton Project: Resurfacing District I, 16161B Easton, 24037 and Milan, 25522. Scope of Work: Roadway resurfacing. Location: N/A. Contractors and Bid Amounts: • Pike Industries Inc. — $2,121,118

• Continental Paving Inc. — $2,130,100 Scheduled Completion Date: Sept. 13, 2013

• New England Infrastructure Inc. — $1,179,252 Scheduled Completion Date: Aug. 9, 2013

County: Strafford Project: Dover 16448. Scope of Work: Roadway resurfacing. Location: N/A. Contractors and Bid Amounts: • Continental Paving Inc. — $2,476,341 • Pike Industries Inc. — $2,543,125 • Brox Industries Inc. — $2,642,179 Scheduled Completion Date: Sept. 13, 2013

Counties: Belknap and Carroll Project: Statewide X-A001(284), 16416. Scope of Work: Sign upgrading. Location: N/A. Contractors and Bid Amounts: • American Flagging and Traffic Control Inc. — $232,499 • CPM Constructors — $271,242 • Liddell Brothers Inc. — $311,842 • Roadsafe Traffic Systems Inc. — $323,442 • Nelson Communications Services Inc. — $330,108 Scheduled Completion Date: Aug. 23, 2013

Counties: Hillsborough and Merrimack Project: Central turnpike resurfacing 16446. Scope of Work: Roadway resurfacing. Location: N/A. Contractors and Bid Amounts: • Continental Paving Inc. — $4,105,271 • Pike Industries Inc. — $4,645,523 • Brox Industries Inc. — $5,045,692 Scheduled Completion Date: Sept. 13, 2013 County: Hillsborough Project: Bedford 16447. Scope of Work: Median box guardrail replacement. Location: F.E. Everett Turnpike in Beford. Contractors and Bid Amounts: • F.L. Merrill Construction Inc. — $924,897 • R.S. Audley Inc. — $924,900 • Northeast Earth Mechanics Inc. — $1,047,851 • Weaver Bros. Construction Company Inc. — $1,053,867 • CPM Constructors — $1,099,972 • R.M. Piper Inc. — $1,169,227

Counties: Grafton and Caledonia Project: Littleton, N.H.-Waterford, Vt. A001(041), 15926 and A001(217), 16195. Scope of Work: Bridge rehabilitation. Location: I-93 northbound and southbound over the Connecticut River. Contractors and Bid Amounts: • Reed & Reed Inc. — $8,189,764 • SPS New England Inc. — $8,369,832 • Northern Construction Service LLC — $ 8,975,912 • Beck & Bellucci Inc. — $8,981,079 • E.D. Swett Inc. — $8,998,825 • CPM Constructors — $9,161,725 • J.P. Sicard Inc. — $9,646,277 • R.M. Piper Inc. — $10,473,840 • Winterset Inc. — $11,401,366 • MIG Corporation Inc. — $11,968,160 Scheduled Completion Date: Oct. 31, 2014


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 27, 2013 • Page 9

www.equipmenteast.com HEAVY CONSTRUCTION EQUIPMENT

SALES • RENTALS • PARTS • SERVICE

Crushing and Screening Plants as well as Keestrack/OM parts in stock.

Hydraulic Hammers for All Your Demolition Needs. Besides the eco-friendly silenced design, which fits international standards to be used in environmentally noise sensitive areas, the Ramfos TF series hydraulic hammers boast unbeatable performance. We perform complete hammer rebuilds and have a complete parts inventory in stock at our facility for all models of Ramfos hammers. 550 ft lbs - 15,000 ft lbs available

61 Silva Lane Dracut, MA 01826 (978) 454-3320 Fax: (978) 454-3325

Buy Proven High Quality Construction Equipment from one of the World’s Leading Manufacturers and Save $$$$ from Competitor’s Brands.

• Pile Drivers • 360˚ free rotation & 90˚ tilting rotation of jaw clamp • Tilting structure can easily be attached and detached

Perfect where there is limited space. Yanmar introduced the first Swing boom excavator, First Rubber tracked excavator and First Zero Tail Swing excavator.


Page 10 • March 27, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

DISPLAY ADS/ Hyundai Appoints CLASSIFIEDS Pete’s Equipment as Vermont Dealer

Classified Rates: 30 Words or Less for $30.00. Each Additional Word is 95¢. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

Hyundai Construction Equipment Americas Inc. has appointed Pete’s Equipment Sales & Rental as an authorized Hyundai dealer. Pete’s Equipment will provide sales and service of Hyundai equipment from its Morrisville, Vt., location. “We are proud to be able to offer the complete Hyundai line of equipment,” said Pete Couture, president of Pete’s Equipment Sales & Rental. “Hyundai manufactures quality equipment that lasts and with more standard features, it’s easy for us to recommend their machines to our customers.” Established in 1974, Pete’s Equipment is a family-owned business, serving the Newport, St. Johnsbury, Barre and Burlington areas. The company prides itself on being dedicated to its customers while providing sales and rental of tractors, loaders, skid steers, dozers, excavators, chippers, telehandlers, backhoes and light towers as well as attachments and implements. Pete’s Equipment also has an experienced parts and service staff to keep their customer’s machines up and running, according to the company. Pete’s Equipment will now carry Hyundai’s full line of construction equipment, which includes wheel loaders, crawler and wheeled excavators, mini-excavators and skid steer loaders. The full stock of Hyundai equipment will be readily available for sale or rent. The sales staff has been fully trained in the application, sales, parts and service of Hyundai Construction Equipment products and offers professional and efficient parts and service support to its customers. “Pete’s Equipment maintains a strong commitment to its customers and provides prompt parts and service assistance, which are the exact qualities we are looking for in Hyundai dealers,” said Shane Sirmons, marketing manager of Hyundai Construction Equipment Americas Inc. “We are excited to welcome Pete’s Equipment to our growing dealer network.” For more information, call 866/237-3189.

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 AERIAL LIFTS

SCRAPERS

Manlifts

Motor Scrapers

GRADALL / LULL Sales - Service - Training

(2) IHC 431 Scrapers, 21 cu yd open bowls, rebuilt moldboards new cutting edges, one has reconditioned 5th wheel and gooseneck. All work done by dealer, very good condition - put them to work ........$15,000 Ea.

Modern Equipment Sales & Rental 800-445-4381

AIR COMPRESSORS Compressors

Call 908-781-2143 or cell; 908-581-4606

AIRMAN COMPRESSORS

Other good used equipment available!

Eagle Power & Equipment

TRAILERS

Montgomeryville PA 215/699-587

Drop Deck Trailers

New Castle DE 302/652-3028

2005 Felling FT-12-12, decj over wheels, 16’ deck, 5’ beavertail with ramps ....$4995.

Eagle PA 610/458-7054

ASPHALT EQUIPMENT Asphalt Rollers 2001 Sakai SW320, 47’’, ROPS, good condition, 3674 hours ..........................$11,900. 800-222-8798

Asphalt - Misc. FOR SALE Puckett: T-650 Gehl: 1438, 1448, 1648, 1649 Lee Boy: 8515, (2) 8616, 8000, (3) 1000 Blaw Knox: PF200, PF35, 540 PSI Maintainer (4) Tri-Axle Trucks (10) Asphalt Rollers (4) Trailers Salsco Paver Cat D3 Dozer Neal Sealing 550 413-537-1892

COMPACTION EQUIPMENT

800-222-8798

Trailers - Misc. NEW & USED TRAILERS Eagle Power & Equipment Montgomeryville PA 215/699-5871 New Castle DE 302/652-3028 Eagle PA 610/458-7054

(This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.)

TRUCKS

ELLIOTT BUCKET TRUCKS Modern Equipment Sales & Rental 800/445-4381

============== DAILYAND AND WEEKLY SOMETIMES MY DAILY WEEKLY

EQUIPMENT RENTALS HUMAN DOESN’T EQUIPMENT RENTALS CLOSE YOUR JOB SITE WEAR PANTS AT CLOSE TOTO YOUR JOB SITE HOME. IT’S A RIOT. RENTMACHINES.COM RENTMACHINES.COM

Pneumatic Rollers Vibromax VM115, 125 hp, 83’’ drum width, 25,000 lb oper. wt., low hours. Pictures available .. ..................................$66,500. 908/625-0697

Sales and Rentals

(508) 523-8852 www.atequipment.com

FOR SALE OR RENT ALL OF THESE MACHINES AND ATTACHMENTS ARE IN EXCELLENT CONDITION AND HAVE BEEN MAINTAINED *Full Line IN OUR RENTAL FLEET of Hydraulic AND ARE READY TO GO TO Hammers Available WORK ON YOUR JOB SITE for Sale or Rent TODAY, WHETHER IT BE A *Hydraulic PURCHASE OR A RENTAL Hammer Repair

2008 Cat 345 with auxiliary hydraulics, 13,000 pound hammer and thumb P.O.R. 2009 Yanmar VIO17 300 hours, showroom condition, auxiliary hydraulics, thumb $18,500 2009 Yanmar VIO45 1000 hours, auxiliary hydraulics, thumb, cab, a/c, hydraulic quick coupler $39,000 2009 Yanmar VIO35 1000 hours, auxiliary hydraulics, quick coupler, thumb, cab with a/c $34,000

2006 John Deere 160CLC auxiliary hydraulics, 3,500 pound hammer, and thumb P.O.R.

Bucket Trucks

CATERPILLAR CATERPILLAR ® ® GENIE GENIE ® CHALLENGER CHALLENGER® ® ® SCREEN MACHINE SCREEN MACHINE ®

A.T. Equipment, Inc.

Office

(508) 865-0400

®

— COLBY adopted 06-18-11

1999 Komatsu PC400 w/auxiliary hydraulics, new bottom ..................................................$59,000 Rammer E68 hammer completely rebuilt and not used since the rebuild ............................$21,500 Tramac BRH750 hydraulic hammer, 3,000 pound completely rebuilt................................$7,500 2002 John Deere 250 skid steer w/500 hours, cab, heat, a/c, 6-foot hydraulic snow plow, forks, excellent condition........................................$16,500

81 Worcester Providence Turnpike, Sutton, MA 01590


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 27, 2013 • Page 11

RIDOT Deploys 3,300 Tons of Sand, 15,000 Tons of Salt NEMO from page 4

Though the smallest state in the nation, RIDOT deployed some 3,300 tons (2,994 t) of sand, along with 15,000 tons (13,608 t) of salt on the approximately 1,100 linear mi. (1,770 km) or 3,300 lane mi. (5,310 km) of highways that were maintained during Nemo. The traffic-free roads, mandated by Gov. Lincoln Chaffee, made the difference. “The highway restrictions imposed by the Governor helped, as it enabled our plows get around during the height of the storm without the obstacles of passenger vehicles and trucks,” Gudmunson said. “Other technologies, such as the salt brine we used, enabled us to keep the roads cleared faster, as we didn’t have snow and ice bonding to the highways. In addition, having access to the larger equipment certainly helped as this was an extremely powerful storm, with huge amounts of snow that needed to be moved in order to keep our highways clear.” When asked for a list of ven-

dors, or any that deserved special mention, RIDOT instead praised the collective. “Certainly being able to supplement the RIDOT crews with private vendors was an important part of our overall success in this storm. As you can imagine, with such a large group of vendors we don’t want to leave anyone out. They all pitched in and responded to the call when needed,” said Joseph Baker, administrator of highways and bridges at RIDOT. “The most important thing I can tell you, however, is that the pride and hard work of our maintenance employees should be commended,” added Gudmunson. “They gave it their all to keep up with the storm and keep us safe. They are truly unsung heroes.” In Massachusetts the Call Went Out In Massachusetts, when a blizzard or major storm hits, a call goes out for assistance from MassDOT. “Typically,” said Michael Verseckes, head of MassDOT’s

Hydraulic Cranes 6-365 Ton

communications office, “Private contractors have approximately an hour and 15 minutes to respond. Most respond within a much shorter timeframe than that.” “Between 10 p.m. on Feb. 8 and 4 a.m. on Feb. 9, MassDOT had approximately 3,625 pieces of equipment deployed around the state. MassDOT has roughly 400 pieces of equipment in-house, and access to 4,000 pieces of hired equipment,” Verseckes added. Statewide, MassDOT is responsible for more than 3,000 mi. (4,828 km) of roadway, translating into 15,200 lane mi. (24,462 km). “This winter, there have been 12 other storms — most outside of the Boston area — that have required significant amounts of coordination and effort to clear roads,” said Verseckes. “Our snow fighting efforts rely heavily on effective communications, and during storms that is managed in our Highway Operations Center (HOC) in South Boston.” HOC staff has access to more than 850 roadway and security

cameras to detect and monitor traffic conditions and crashes. In instances of heavy traffic congestion or impending weather, the HOC can program approximately 400 message boards around the Commonwealth to inform or warn drivers of hazards that are specific to one region or is applicable statewide. “A travel ban was implemented that was an effective means to drive home the point that the storm of Feb. 8 and 9 was serious. It also helped remind folks that we were going to have a continuous aroundthe-clock effort to keep up with the accumulation, which would be improved by having the roads clear of most other vehicular traffic,” said Verseckes. “Subsequent to Feb. 8, we had crews out around the state continuing to clear road shoulders and breakdown lanes, and in some cases, going over the right travel lanes where needed. We had personnel addressing areas where the snow melt [caused by subsequent rain] may have turned to ice

overnight — with a particular focus on our on-and-off-ramps,” said Verseckes. The travel ban in both Massachusetts and Rhode Island excluded public safety vehicles and workers, including contract personnel, public works vehicles, contracted vendor vehicles, government officials, utility company vehicles, health care workers and the news media. Early Sign Ups for Vendors In Rhode Island and some other states, vendors get extra bonuses for so-called “green” equipment and accessories which improve state fuel costs. They also get an early sign-up bonus, if their equipment completes the state registration process by Oct. 26 in preparation for winter storms. Rhode Island also is innovative in another way, using special road salt brine that has greatly improved how state roads are treated both before and after snowstorms. This brine, which is much see NEMO page 14

Bijur Automatic Lubrication Systems VEI Wheel Loader Scales West Springfield, MA 01089-3850 (413) 788-LUBE

Daily & Hourly Services www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

Lubrication Engineers High Performance Lubricants Professional Lubrication Management

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 an issue only $45 an issue only $40 an issue

Call now to reserve your space! 800-225-8448 * pre-payment required


Page 12 • March 27, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Newport • Providence • Washington • Bristol • Kent • Carolina • Newport • Providence • Washington • Bristol • Kent • Carolina • Newport • Rhode Island... Providence • Washington • Bristol • Kent • Carolina • Newport • Providence • Washington • Bristol • Kent • Carolina • Newport • Providence • Washington • Bristol • Kent • Carolina • Newport • Providence • Washington • Bristol • Kent • Carolina • Newport • Providence • Washington • Bristol • Kent • Carolina • Newport • Providence • Washington • Bristol • Kent • Carolina • Newport • Providence • Washington • Bristol • Kent • Carolina • Newport • Providence • Washington • Bristol • Kent • Carolina • Newport • Providence • Washington • Bristol • Kent •

“The Ocean State” Highway Projects

The Rhode Island Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. R.I. Contract No.: 2012-CB-083 Project: DBP C4 Anthony Road Bridge No 876. Contractors and Bid Amounts: • Brito’s Landscaping Services LLC — $40,945 • Cardi Corporation — $62,492 • New England Building & Bridge Company Inc. — $73,482 • HK & S Construction — $74,900 • Mas Building & Bridge Inc. — $74,923 • J.H. Lynch & Sons — $88,975 • Northern Construction Service LLC — $92,685 • Aetna Bridge Company — $113,850 • D’ambra Construction Company Inc. — $123,005 R.I. Contract No.: 2012-CH-003 Project: Sakonnet Point drainage improvements. Contractors and Bid Amounts: • East Coast Landscaping & Construction Inc. — $235,310 • HK & S Construction — $247,515 • Cardi Corporation — $277,777 R.I. Contract No.: 2012-CH-018 Project: Reclamation. Contractors and Bid Amounts: • Cardi Corporation — $8,199,915 • D’ambra Construction Company Inc. — $8,383,000 • J.H. Lynch & Sons — $9,280,003 R.I. Contract No.: 2012-CH-101 Project: Type II emergency drainage repair Route 1 SB at Woodruff Ave. Narragansett. Contractors and Bid Amounts: • Cardi Corporation — $146,171 • American Site Corporation — $147,000 • D’ambra Construction Company Inc. — $179,566 • HK & S Construction — $248,860 R.I. Contract No.: 2012-DF-035 Project: Statewide bridge scour remediation - Contract 1. Contractors and Bid Amounts: • Aetna Bridge Company — $463,329 • Northern Construction Service LLC — $497,500 • HK & S Construction — $774,534 • Cardi Corporation — $1,944,010 R.I. Contract No.: 2012-CB-092 Project: Improvements to Interstate I-195 pier column crack sealing repairs. Contractors and Bid Amounts: • Aetna Bridge Company — $269,516 • Cardi Corporation — $368,900 R.I. Contract No.: 2012-CB-078 Project: New Providence Viaduct Southbound Bridge No. 578.

Contractors and Bid Amounts: • Manafort Brothers Inc. — $66,864,640 • Cardi Corporation — $74,869,872 • Barletta — $79,952,200 R.I. Contract No.: 2013-CB-025 Project: DBP C7 repairs to Jefferson Blvd. South Bridge No. 634. Contractors and Bid Amounts: • Cardi Corporation — $1,294,298 • Aetna Bridge Company — $1,455,257 • New England Building & Bridge Company Inc. — $1,596,518 • John Rocchio Corporation — $1,649,080 • Northern Construction Service LLC — $1,849,048. • D’ambra Construction Company Inc. — $2,145,702 R.I. Contract No.: 2013-CH-004 Project: I-195 Relocation — Contract 14 (West side city streets). Contractors and Bid Amounts: • Cardi Corporation — $12,992,494 • D’ambra Construction Company Inc. — $15,450,673 • J.H. Lynch & Sons — $18,290,386 R.I. Contract No.: 2012-CT-090 Project: Statewide pavement striping — East Bay. Contractors and Bid Amounts: • Traffic Markings Inc. — $1,954,630

• Roadsafe Traffic Systems Inc. — $1,974,347 • Safety Marking Inc. — $2,362,242 R.I. Contract No.: 2013-CB-011 Project: DBP C11 repairs to Wakefield Bridge No. 20. Contractors and Bid Amounts: • J.H. Lynch & Sons — $259,031 • New England Building & Bridge Company Inc. — $265,432 • Northern Construction Service LLC — $287,000 • John Rocchio Corporation — $290,406 • Aetna Bridge Company — $324,303 • Cardi Corporation — $349,701 • D’ambra Construction Company Inc. — $353,115 • Rotha Contracting Company Inc. — $639,933 R.I. Contract No.: 2013-DF-034 Project: Hurricane Sandy — repairs to Sachuest Point Road. Contractors and Bid Amounts: • Narragansett Improvement Company — $864,000 • Northern Construction Service LLC — $873,238 • American Site Corporation — $894,000 • Cardi Corporation — $1,046,000 • HK & S Construction — $1,215,534 • D’ambra Construction Company Inc. — $1,333,333 • East Coast Landscaping & Construction Inc. — $0 • J.H. Lynch & Sons — $1,580,000


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 27, 2013 • Page 13

We’ve ve become attached to your machines. AR Series™ hydraulic impact hammers

Rammer® Mid-Range all-new w Model 2155 hydraulic impact hammers

Rammer® Small Range hydraulic impact hammers

Where can you go to get high performance boom-mounted attachments?

Allied Construction Products, LLC For over 70 years, we’ve developed developed many attachments that are legendary in the construction and demolition industries that demand high performance. Names like Ho-Ram, Ho-Pa ® and Pedestal Breaker System™ are names that equal: Hy-Ram®, Rammer, Ho-Pac UÊ UÊSimple, le, proven design (Our attachments have high resale or trade-in value) U Reliable performance (If you purchased an Allied attachment, you’re probably still using it) AEM formerly CIMA– CIMA ratings, our attachments AE U Superior productivity (Compare AEM– get the job done faster) And, now ow Allied adds to that great family background with the Rammer®, AR Series™ and all-new Hy-Ram® hammers. Allied’s attachments don’t take a back seat to any competitor. In particular, our Rammer® product features a long-stroke design, all oil operation and ProControl. All of our high performance boom-mounted attachments are supported by the most respected parts and service organization in North America. Customer satisfaction is job one at Allied. Great products supported by people who know the industry and its customers. To put a high performance Allied attachment on your machine, visit the Tyler Equipment Corporation location nearest you. We’ve become attached to your machines.

Tyler Equipment Corporation All-new AMS Series mobile shears

Ho-Pac ® vibratory compactor/drivers

Hy-Ram® hydraulic impact hammers

CT LOCATION: MAIN OFFICE: 1980 Berlin Turnpike 251 Shaker Road Berlin, CT 06037 East Longmeadow, MA 01028 1-800-352-4473 1-800-292-6351 www.tylerequipment.com

Contractor’s Mechanical Grapple material and waste handling systems

© 2013 Allied Construction Products, LLC

160 Elm St. Unit 1 Walpole, MA 02081 (508) 660-7600 Fax: (508) 660-7614

www.lhequip.com


Page 14 • March 27, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX

Empire Crane’s Zerrillo Sells Loaded Manitex 40124SHL

A QUICK PICK CRANE SERVICE INC ..........................11 A T EQUIPMENT INC ....................................................10 ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ..............................................................11 BARRY EQUIPMENT CO..................................................7 BOBCAT OF RHODE ISLAND..........................................9 CHADWICK BAROSS MA ................................................5 CLASSIFIED ....................................................................10 CONTRACTOR’S CORNER............................................11 COR EQUIPMENT SALES ..............................................5 EQUIPMENT EAST ..........................................................9 FOLEY MARINE & INDUSTRIAL ENGINE ......................1

Empire Crane New England Sales Representative Chester Zerrillo sold a Manitex 40124SHL, 40 ton (36 t) boom truck to Rusty Williams of Rig-All Inc., Frankfort, N.Y. The 425 hp (317 kW) Peterbilt 367 chassis has aluminum Alcoa rims, air tanks and rails. (L-R) are Chester Zerrillo, Rusty Williams and Ryan Williams.

GORILLA HAMMERS ......................................................1 ITL AUCTIONEERING ......................................................1 J R VINAGRO CORPORATION ......................................1 KRAFT POWER CORP ....................................................1

Workers Apply Salt Brine Days Before Storm to Bond to Roads NEMO from page 11

LORUSSO HEAVY EQUIPMENT LLC ..........................13 LOU GIZA EQUIPMENT....................................................1 LUBRICATION TECHNOLOGIES INC ..........................11 MILTON CAT....................................................................10 ROGERS BROTHERS ....................................................15 SUMMIT SUPPLY LLC/MULTI MACHINE ........................1 THE N.I.C.E. COMPANY ..................................................7 THE W I CLARK CO ........................................................2 TYLER EQUIPMENT CO ............................................3,13 WOODCO ........................................................................16 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

stronger that traditional sand or salt mixtures, has allowed the budget-strapped state to cut back on spreading sand to reduce snow and ice on its 1,100 mi. of roads. During Nemo, and other potent storms, the salt brine was applied two days before the storm, leaving a chalky coat that bonds with the roadway after the water evaporates. Sand reduction also means less clogging of storm drains and less sediment in rivers and streams. It is only a pre-treatment. Traditional salt and sand are still applied in storms. Such innovations speak to the dilemmas of time and cost facing municipalities when a storm like Nemo shuts them down with no power or travel for days. “Our challenges [plowing roads] were small compared to that of the leaders of the town of Hamden as well as many other municipalities who had similar challenges,” said Sweeney. “It was eye opening to spend some time observing the challenges from the inside of this response effort and, at the same time, listening to a percentage of the public criticizing the efforts of these people trying to help them.

“Some of these people criticized through television and newspaper and websites; some people griped to all that would listen in the local coffee shops and some people took their frustrations out on the actual equipment operators as they cleared snow in front of their homes,” he added. “As a private contractor, I am not accustomed to this uneducated and uninformed criticism. It was not all negative and I would be remiss if I did not acknowledge a very large percentage of wonderful residents who were quite positive along the routes and were quick to provide our operators with food, a hot cup of coffee and a kind word or a thank you along the way.” Sweeney added, “As a lifelong resident of the town of Hamden, I would like to say it was a pleasure to work with this group, and congratulations to all involved, from the Mayor, to the Public Works Department to the fire department to the police department on getting the cleanup completed. Great job to all.” (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 27, 2013 • Page 15

Tyler Equipment

C.N. Wood Co., Inc.

Joseph Equipment Company

251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351

200 Merrimac St. Woburn, MA 01801 (781) 935-1919

300 Gay Street Manchester, NH 03103 603-641-8608

Avon, MA (508) 584-8484

www.josephequipment.com

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848

www.tylerequipment.com

Johnston, RI (401) 942-9191

www.cn-wood.com


Page 16 • March 27, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

PARTS & service

REMARKETING

CUSTOMER SUPPORT AGREEMENTS

VOLVO FINANCIAL SERVICES

CARETRACK

Get it done from one source: your Volvo dealer. Let’s work. Whatever you do, Woodco Machinery is there to help you do it. Dependable equipment – from construction and road building to forestry, utilities and more. Support – from sales and remarketing to reliable parts and service. Offerings – to get you working and keep you working – from Customer Support Agreements and CareTrack telematics to full-service financial solutions through Volvo Financial Services. It’s all delivered directly through one source: Woodco Machinery. We’re the solution you can trust – before and after the sale. Let’s work together. Contact your nearest Woodco location today.

140 Wales Avenue Avon, MA 02322 508-584-8484

www.woodcomachinery.com

Volvo Construction Equipment

22 North Maple Street Woburn, MA 01801 781-935-3377

60 Shun Pike Johnston, RI 02919 401-942-9191


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.