1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
FormErly
95
202
7
®
91
9
95
93
2
95 2
93 90
90
7
September 11 2013
95 91
7
495 6 195
395
95 91
3
84 6
84
6
E
q
u
I
P
m
E
N
t
g
u
I
d
E
95
95
Vol. XlIX • No. 19
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Kent Hogeboom 1-800-988-1203
2013 EZ-Screen 1200XL
Kraft Power Corporation
Engines, Parts & Service
800-969-6121 Woburn, MA & Syracuse, NY
Authorized Deutz Distributor
WE STOCK RUBBER TRACKS for Over 2,500 Models! New Option Separate 3 Products
6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High
Some Used Tracks Available.
BEST PRICES! • GUARANTEED TO FIT • HIGH QUALITY • FAST SHIPPING
888-888-1248
$39,500 plus freight. Other Screeners Available
ArguS INduStrIAl CO. www.ez-screen.com
866-745-5828
Kraft Power Corporation Perkins Master Service Dealer NJ, MA & NY Engines, Parts & Service
800-969-6121
WANtEd CATERPILLAR EQUIPMENT Call Lou Giza
603-595-2090
www.kraftpower.com
WANTS YOUR HAMMER REPAIR CALL 888-81-GORILLA (46745)
Auctioneering & Liquidation
ITL Auctioneering
www.itlauctions.us www.foleyengines.com
w
Justin Lyerla (508) 824-3262
Nahant Beach Reservation Rehab Project Requires Delicate Maneuvers By Jay Adams CEG CORRESPONDENT
Unless you are a seagull or a yacht, there is only one way to access Nahant Beach, Mass. — a beach with a heavily traveled causeway and public access areas in desperate need of rehabilitation. To that end, Pihl Inc., a Denmarkbased company with U.S. headquarters in Canton, Mass., is completing the seventh phase of a delicate seven-phase, $20 million, four-year beach access and rehabilitation project. The Nahant Beach Reservation Rehabilitation Project, which began in May 2010 and is expected to be completed in May 2014, has required careful digging and temporary road building to accommodate the beach-going public and to preserve the fragile and protected wetlands that surround the excavation work. It is a challenging endeavor that has required 13 subcontractors under Pihl Inc., and at least 18 supervising governmental and municipal overseeing bodies to monitor the work around the mudflats, the clam beds, the coastal wetlands, the beach and its erosion, the seawall and many other unusual environmental conditions. They all must remain undisturbed while dozens of backhoes and excavators fortify the shoreline and the new structures are being erected upon it. Working in Meticulous Phases The work had to be phased over three years not to disturb — equally — the marine life of gulls and gills or the human life of sun worshipers. This was especially tricky because the causeway is the only access to the island of Nahant. “The project consists of seven phases in order to accommodate the public in the least inconvenient matter. In the first phase, we prepared the causeway for construction, building the temporary lanes, temporary attenuators and barrels for traffic safety,” said Theis Vangsted, project engineer and
The Liebherr hefts a precast utility box that weighs more than 16,400 lbs. (7,439 kg).
assistant project manager. In the second phase, Pihl did all the infrastructure work — telephone, electric and drainage — on the southbound lane toward Nahant. It also performed revetment, pavement, installed granite curb, raised structures and installed guardrail. In the third phase, it moved to the northbound lane toward Lynn, Mass. and performed all the infrastructure work, paved and raised structures, according to Danté Roberto, project manager and supervisor. The fourth phase is divided into two parts. The first part of phase 4 consisted of reclaiming the temporary two lanes and some of the parking area, moving water mains and CATV, constructing retaining walls and installing drainage in the see NAHANt page 4
Page 4 • September 11, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
THE W.I. CLARK COMPANY Brookfield, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316
2008 New Holland C175
2010 Leeboy 8510
2007 CEC 5x12 Screening Plant
2004 CEC Box-It 710
c/heat, foot controls,72” bucket, new tracks and idlers. stk# 21686 ..........................................$24,000
Kubota diesel, 8-15’ Legend propane screed, 3 new screed plates, great condition, stk# 21501 ........................................$105,000
wheels, grizzly, ball deck, 3/4 square x 1- 1/2", stk# 18883.......... .........................................$105,000
Deutz diesel, 3" punch plate x 3/4 X 5" lowers, good condition, stk# 21405 ................................$45,000
Cat 950B
2006 Deere 544J
REDUCED 2007 Wirtgen WR2500S c/air, Mercedes power, 96” drum @ 90%, no emulsion, great condition, one owner, stk# 21569
$385,000 $375,000
c/heat, one owner. stk# 21633 ....... ...........................................$60,000
A/C, RC, 3rd valve hyds, JRB hyd cplr and 3 yd bucket, stk# 21348... .........................................$127,500
2009 Carlson CP-90
2006 Deere 250D
2007 Deere 50D
2011 Deere 270DLC
Cat power, 8-15’ Carlson EZ screed, elertric heat, 80% remaining on wear items. stk# 21679 ..... ...........................................$72,000
25 ton haul truck, c, air, 80% radials, tailgate, great condition, stk# 20949........................$146,500
ROPS, 890 hours, hydraulic thumb, stk# 20936 ............$42,500
c/air, 10' 6" arm, 54" bucket, stk# 20958 ..............................$189,000
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 11, 2013 • Page 3
MASSACHUSETTS
CONNECTICUT
251 Shaker Road, East Longmeadow, MA 01028 Direct: 413-525-6351 Toll Free: 800-292-6351 Parts Direct: 877-255-6351
1980 Berlin Turnpike, Berlin, CT 06037 Direct: 860-356-0840 Toll Free: 800-352-4473 Parts Direct: 860-356-0848
www.tylerequipment.com
www.tylerequipment.com
1999 VOLVO ZL402C, Stk #: 12763, S/N: 6009100, 3040 Hrs, Hyd C/Q, 3rd Hyd Function, 71” cy H/O SE GP Bckt, BOE, Clean ..............................$30,000
2007 VOLVO A30D, Stk #: EQ12032, 5870 Hours, 23.5R25 Rubber, Full Tailgate, Ready to Work! ...... ..................................................................$158,000
2010 VOLVO BL70, Stk #EQ8694, S/N: 20173, 850 Hours, 90 hp, 4WD, Clean ..........................$65,000
2008 VOLVO SD116DX, S/N: 198190, 394 Hours, 160 hp, Ready to Work. 84” Drum............$110,000
2005 VOLVO DD118HFA, Stk #EQ0008369, S/N: 184231, 2200 Hrs, Cummins Eng, 78” Dbl Drum Vibratory Compactor ..................................$44,000
2006 VOLVO EC460B LC, S/N: 80090, 7420 Hrs, Many New Parts; Track Chains, Sprockets, etc. READY TO WORK! ....................................$150,000
TRAILERS
AGGREGATE - SCREENS
2007 ROGERS 35 Ton Gooseneck Trailer..............................................................$42,000 2001 ROGERS 20 Ton Tag Trailer, 8’6”x19’ Main Deck w/ 6’ Beavertail, 2:15 Tires ....................$14,000 1997 EAGER BEAVER 20 Ton Tag Trailer, 8’6”x19’ Main Deck w/ 6’ Beavertail, 2:15 Tires ............$8,500
1985 GRANSON SCREENER ......................................................................................................$17,000
Volvo Construction Equipment
Page 4 • September 11, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Work Consists of Seven Phases Spanning Three Years
The construction team at Pihl Inc. has had to adapt to all types of extreme weather conditions on this project. NAHANT from page 1
parking area. The second part of phase 4 consisted of constructing all drainage in the northbound lane, retaining walls with granite cap, precast/granite curb, chain link fences and constructing the landscaping area between the new causeway and reservation area in the temporary lanes. Before phase 5 started, the contractor converted the parking area again into two temporary lanes after the beach
NEW ENGLAND EDITION Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Main office
470 Maryland Drive Fort Washington, PA 19034
215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910 Web site Editorial e-mail Advertising e-mail
season ended. “We were working the northbound lane toward Lynn, where we installed the median guardrail, permanent light poles, relocated primary electric, installed granite curb,” added Vangsted. “In the 6th phase, we worked on both lanes of the causeway, where we installed granite curb, raising the structures and placing top course pavement.” In the 7th and last phase, which Pihl transitioned to in July
For advertising rates: Contact
Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Reckner Pete Sigmund John Pinkerton Tom Weinmann Cathy Printz
www.constructionequipmentguide.com editorial@cegltd.com production@cegltd.com
(L-R) are Danté Roberto, project manager of Pihl Inc.; Gerry Carney, of Lorusso Heavy Equipment; and Theis Vangsted, assistant project manager of Pihl Inc.
Edwin M. McKeon Jr.
215/885-2900 800/523-2200 215/885-2910 e-mail tmckeon@cegltd.com
Toll Free Fax
Kent Hogeboom •New York •New England 315/866-1423 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com Contact
Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2013, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.
2013, work will be in the reservation area, installing site improvements such as retaining walls, boardwalks, bike racks, trash barrels, planters, flag poles, a water fountain, landscape work, renovating the boat ramp, paving, stripping, and then reconstructing the big barbecue area, Roberto added. Made for the Job The machine that Pihl purchased from Lorusso Heavy Equipment specifically for this job is a Liebherr A924C 55,000 lb. (24,948 kg) rubber-tired excavator. “We were looking for a very multi-faceted machine; a machine that could pick up a 2-ton Jersey barrier and travel with it, without creating any safety issues,” said Roberto. “Throughout this construction project travel lanes are being changed and a lot of Jersey barriers would be handled. We also needed a machine that could travel along a paved road on a job site that extends over 1-1/2 miles without damaging the surface of the asphalt. I had never worked on a project with Liebherr machines in the fleet, but I was aware of the company and their excellent reputation. The Liebherr was the only rubber-tired excavator in its weight class that had this kind of lifting capacity and offered the mobility that we needed.” see NAHANT page 8
The Liebherr makes light work of a Jersey barrier.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 11, 2013 • Page 5
2010 KAWASAKI 50Z V, Stk#: KA1002, 1305 Hrs, snow rental, Cummins engine, 17.5 bias ply rubber, 1.8 cu.yd. bucket with bolt on edge, JRB hydraulic quick coupler, ride control, AC, AM/FM/CD ....CALL
1999 KAWASAKI 65Z IV, Stk#: CS1303, 6,489 Hrs, 20.5 x 25 rubber, 20%, good bucket and edge, mechanical quick coupler, front glass has crack, machine is very tight and strong runner......$49,000
1989 TROJAN 1500Z, Stk#: UL1204, 8,068 Hrs, good rubber, runs well, steering cylinders loose, acs QC, 1 yd & 2 yd acs buckets & acs forks ....$14,900
2011 KAWASAKI 70Z V-2, Stk#: KA1101, 701 Hrs, 23.5 radial tires, 3.5 yard bucket, ZF fully auto trans, Cummins engine, just off winter rental, low low hours. ........................................................CALL
2006 STONE SD66X, Stk#: SN0711, 113 Hrs, Low hour rental unit, combination tractor/turf tire, 110 HP Cummins engine ..........................................$47,900
2009 GEHL CTL65, Stk#: CS1309, 612 Hrs, Newer tracks, Hi-Flow hydraulics, good bucket and edge, runs well ......................................................$33,900
2007 KOBELCO 80CS, Stk#: CS1308, 4,554 Hrs, rubber tracks, aux hyds, , hydraulic thumb, 30" bucket, blade, AC, AM/FM, tight machine & runs very well ......................................................$49,900
2007 YANMAR VIO35-3, Stk#: CS1314, 1,696 Hrs, very clean machine. Cab, NO AC, blade, hydraulic thumb, rubber tracks, low hours ..................$36,900
Call us.
391 Loudon Road • Concord, NH 03301
Serving Construction Contractors & Municipalities Since 1964
(800) 358-6007 Office: (603) 225-3361 • Fax: (603) 225-4918 www.ewsleeper.com
391 Loudon Road Concord, NH 03301
(800) 358-6007 Office: (603) 225-3361 Fax: (603) 225-4918 www.ewsleeper.com
Call us.
Serving Construction Contractors & Municipalities Since 1964
INTRODUCING A NEW E.P.I.C. GENERATION EFFICIENT POWERFUL INTELLIGENT COMFORTABLE
Page 6 • September 11, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
160 Elm St. Unit 1 Walpole, MA 02081 (508) 660-7600 Fax: (508) 660-7614
www.lhequip.com
A
STRONGCO Company
Chadwick-BaRoss, Inc. 15 Katrina Road • Chelmsford, Massachusetts (800) 804-0775 • (978) 256-9571 Fax: (978) 256-8802 www.chadwick-baross.com • www.cbused.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 11, 2013 • Page 7
The N.i.c.e. Company Northeast International Construction Equipment Co., Inc. “Your Newest Source for Quality Equipment”
I Buy Machines
2011 Metso ST620, Only 2200 Hours!, Save Huge Over New! Only $239,000
2009 Cat 315DL, VERY NICE!!, 2200 Hrs, Plumbed $114,000
2009 Cat 336DL, 12’10” Stick, 6000 Hrs $169,000
2008 Cat 305CCR, 1200 hours, nice! $46,500
1999 IR 70DD Roller, only 1000 hours!! $33,500
2008 Doosan DL200 Loader, Only 1000 Hrs! Only $79,000!
2009 Terex TA35’s, 3700 hours, Nice Trucks! $159,000
Now Off 495 in Franklin!!! 76 Grove St., Franklin, MA
508-966-4888 508-966-4887
Call Bryn Smith at:
Fax:
Email: brynsmith@thenicecompany.com
See all of my machines at www.thenicecompany.com
Page 8 • September 11, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Challenges Include Work During Busy Summer Season Official Departments on Site
The Liebherr was plumbed with a hammer and used for demo work in early phases of the job.
With a project of such complexity and environmental concerns, a slew of governmental agencies and organizations are overseeing the many aspects of the work, including: • DCR: Client • Army Corps of Engineers: permitting and environmental • DEP: permitting — environmental • EPA: permitting — environmental • Nahant Conservation Commission: Order of Conditions (OOC) • Lynn (Mass.) Conservation Commission: OOC • Saugus (Mass.) Conservation Commission: OOC • Lynn Harbor Master: boat ramp closure • Nahant DPW: utility coordination • Lynn Water and Sewer Commission: drain, sewer and water coordination • MWRA: water main coordination • Nahant DPW: drain, sewer and water coordination • Mass. State Police: detail work and safety control on causeway • Nahant Police: detail work and safety control in Nahant • DCR Park Rangers: detail work and safety control in reservation
NAHANT from page 4
The secret to the lifting capacity of the Liebherr is primarily due to two features: the hydraulics and the kinematics of the boom and arm assembly. Liebherr designs and builds its own A tremendous volume of rocks were placed during the construction of hydraulic system in house. the causeway. With multiple operator modes, it is very easy to fine tune the Liebherr an excellent tool for resources. With the causeway being the the hydraulics to the task at hand, grading,” Roberto said. “The split boom adds a lot of one access to Nahant, the chalaccording to the company. In regards to the boom and arm flexibility that you just don’t have lenge to Pihl Inc. was to keep two assembly, the boom is a two-piece with other machines. You can enter lanes open in, and two lanes out, at boom that is adjustable to accom- very low clearance areas by drop- all times. “We had to build a temporary modate both physical site limita- ping the stick lower than is possitions as well as lifting capabilities. ble with other machines; or you two-lane roadway in order to By adjusting the boom, the load can extend the stick straight out, accommodate the commuters durcan be picked and carried much which is ideal during the grading ing construction phasing,” said closer to the machine’s center of applications. The Liebherr was Vangsted. Beach walkways and the parkgravity. While almost every man- priced out very competitively and ufacturer offers a two-piece boom, in spite of being a European ing area are used predominately in the way in which the Liebherr is designed machine the transition for summer season and are open from hinged is different from others. our operators into the Liebherr was dusk to dawn. “The challenge is to perform the Instead of connecting the boom very easy. We purchased the cylinders to the hinge point itself, Liebherr from Lorusso Heavy renovation work in the area while which is the weak point of the sys- Equipment and they arranged for keeping the beach safe and open to tem, the cylinders are connected to onsite training. In fact, Lorusso the general public,” said Roberto. their own separate position on the made all aspects of this purchase “[Another] challenge is to avoid boom, allowing for maximum lift- move along very smoothly. Their disturbing the dune grass and natuservice after the sale has been ral resources with wildlife protecing capabilities. “In a lot of ways we’ve used this exceptional. Parts availability has tion. Mudflats are a conservation machine like a yard crane. In addi- been excellent along with their preserve. The challenge there was to construct riprap revetment with tion to all of the digging and rock response time to service calls.” minimal disturbance to both aquatmoving we were able to lift a telephone manhole weighing 8.2 tons Many Unique Challenges ic life and/or sea plants.” All work is being overseen by Time and tides were carefully a total of 22 feet out of a hole. We also had the Liebherr plumbed the Department of Conservation gauged. “The biggest challenge [so far] with a hammer and used it for and Recreation (DCR), whose demo work in early phases of the mission it is to protect and enhance has been traffic safety during the job. The articulated bucket made the commonwealth’s natural summer season. We have been
working right next to the public during most of the project,” said Vangsted. “In the summer season, there are only a few feet between us and the public and we have to cross the same areas. Safety is our main priority and we have been fortunate to avoid any accidents involving the public.” Constructing the revetment was performed during low tide shifts and took approximately 11 months to complete, Roberto added. In order to protect the clam beds, per the Army Corps of Engineers permit, a 15-ft. (4.6 m) access from the riprap toe was established. Meetings were held with the marine subcontractor prior to startup to enforce these regulations. During construction, the work was monitored by Pihl Inc., DCR, Nahant Conservation Commission and the Army Corps of Engineers. Seaweed, eel grass and shell life along the beach is protected by the OOC (Order Of Conditions) in the contract. Pihl Inc. is performing all work within those areas. Meetings were held with DCR prior to startup to enforce the regulations. “DCR’s resident engineer is informed on a daily basis and our approach and means of methods are discussed before working in the areas,” said Roberto. “All waterfront projects are extremely sensitive and most restrictive for permitting.” Humans Just as Important “The D.C.R. has provided us with construction plans that
improve the traffic controls, vehicular and pedestrian safety,” said Vangsted. “All the items of the road will be in accordance [with] A.D.A. and federal standards. The new longitudinal pitch in the causeway will improve the previous flooding problems in the causeway, which only had lateral pitch. The vehicular and pedestrian lanes will be clearly marked. Boardwalks to the beach will provide improved pedestrian and handicap access.” Reservation identity also will be improved. “The area will be clearly identified by the landscape area, fence and retaining wall between the causeway and reservation. The landscape areas, parking, benches, bike racks and all other non-vehicular improvements will identify the reservation area as a recreational spot for the general public,” added Roberto. It also will enhance reservation aesthetics. “The DCR made it a high priority to design an aesthetically-pleasing project. They focused on using natural blending materials for construction of all structures,” said Roberto. “All natural resources will be fenced [with a rope fence] in order to protect them.” Stopping Erosion The North Shore of Massachusetts has faced powerful winds of countless nor’easters, hurricanes and ocean storms for see NAHANT page 10
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 11, 2013 • Page 9
DISPLAY ADS/ CLASSIFIEDS Classified Rates: 30 Words or Less for $30.00. Each Additional Word is 95¢. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion.
Hydraulic Cranes 8-600 Ton Daily & Hourly Services www.astrocrane.com
Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666
Place Your Business Card for... 3 months 6 months 12 months
$300* $585* $1040*
only $50 an issue only $45 an issue only $40 an issue
PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034
215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 ASPHALT EQUIPMENT
Asphalt - Misc.
Asphalt Cutters
1987 BLAW KNOX 120, all original, excellent condition, 3100 hours..................$19,500.
SEVERE SERVICE HIGH SPEED ASPHALT CUTTER Skid-Steers, TLB, Loaders, Excavators. 14 Models 24 Hour Shipping Rebuilds for competitors’ model! www.attachmentsintl.com attintl@loretel.net 218-863-6444
Asphalt Rollers
Call now to reserve your space! 800-225-8448 * pre-payment required
2001 SAKAI SW320, 47'' Asphalt Roller, ROPS, good condition, 3674 hours..$11,500. 800-222-8798
=========== DAILYAND AND WEEK DAILY WEEKLY
EQUIPMENT RENT EQUIPMENT RENTALS CLOSE YOUR JOB CLOSE TOTO YOUR JOB SITE
RENTMACHINES.COM RENTMACHINES.CO
® CATERPILLAR CATERPILLAR ® GENIE GENIE® ® CHALLENGER CHALLENGER ® SCREEN MACHINE SCREEN MACHI
Page 10 • September 11, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ................................................................9 BARRY EQUIPMENT CO..................................................7 C N WOOD CO INC ........................................................12 CHADWICK BAROSS MA ................................................6
A jogging/biking trail and public beach area run parallel to the causeway.
Geotextile Fabric Under Revetment Prevents Erosion NAHANT from page 8
CLASSIFIED ....................................................................9 CONTRACTOR'S CORNER ............................................9 E W SLEEPER CO............................................................5 FOLEY MARINE & INDUSTRIAL ENGINE ......................1 GORILLA HAMMERS........................................................1 ITL AUCTIONEERING ......................................................1 J R VINAGRO CORPORATION........................................1 KRAFT POWER CORP ....................................................1 LORUSSO HEAVY EQUIPMENT LLC..............................6 LOU GIZA EQUIPMENT....................................................1 MASTHEAD ......................................................................1 MILTON CAT......................................................................9 ROGERS BROTHERS ....................................................11 SUMMIT SUPPLY LLC/MULTI MACHINE ........................1 THE N.I.C.E. COMPANY ..................................................7 THE W I CLARK CO ........................................................2 TYLER EQUIPMENT CO ..............................................3,9 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
untold centuries. Nahant Beach is a peninsula right in the heart of these storms as it juts into the ocean, northeast of Boston. The beach is eroding but Pihl Inc. has literally stemmed the tide. “The southbound side of the causeway erodes naturally due to tidal action. In order to prevent further erosion, geotextile fabric was installed under the revetment,” said the two project managers. “The geotextile fabric is pervious to water and retains the fines from migrating away after each tidal influx. The revetment, which is made of armor stone, up to 8 tons, dissipates the wave energy and prevents further erosion.” In various reconstructions of walls, buildings and the parking lot, the following materials will be used: • Riprap, boulders and crushed stone — approximately 45,000 tons (40,823 t) • Sand/soil/millings — approximately 90,000 tons (81,646 t) • Concrete — approximately 5,000 cu. yds. (3,823 cu m) • Asphalt — approximately 55,000 tons (49,895 t) Beside the rebar steel in concrete structures, steel also will be used in fences, guardrail posts, signposts and miscellaneous reservation items (bike racks, benches etc.). The guardrail used is made of timber, except the posts; granite has been used as curb, wall cap, pavers and medallions in order to complement the natural theme. No seashells have been used other than its decorative design. “The parking lot will be completely renovated with new asphalt, striping and walls. It will have landscape boulder gardens and handicap friendly access to the beach,” said Vangsted. There will be some 900 parking spaces when completed. The various elements of construction include: • Marine: revetment and boat ramp at harborside; access ramps at oceanside • Concrete work: retaining walls, median barrier and spall/crack repairs
• Asphalt work: paving roadway, sidewalks and parking areas • Electric work: conduit, wire and light poles • Utilities work: telephone, electric, drainage, water mains and CATV • Masonry work: granite wall cap, medallion, pavers, granite bollards and site improvement • Parks work: benches, trash receptacles, bike racks, flag poles, water fountains, etc. • Traffic controls: signage, markings and message boards “We want the public to appreciate the safety measures, quality of work and patience Pihl took to improve this location for them,” said the managers. “The project is a complete renovation of the entire area and nearly all utilities. The project will eliminate all flooding and erosion problems that the area has been dealing with for the last decades.” The work has been extended 12 months due to unforeseen conditions, improvements of design and extras. Despite all the changes, the project is still on budget and its revised schedule on target. DCR’s investment in the community goes beyond the $20 million causeway project. The Ward Bathhouse on site was rebuilt ($600,000), rail painting was performed on Lynn Shore Drive ($200,000) and a “Halfway House” was reconstructed for $1.2 million. These are all separate Nahant Beach contracts, beyond the work by Pihl Inc. And even when Nahant Beach has been restored, the work won’t end for Pihl. “Pihl Inc. is proactive in ‘beneficial reuse’ of onsite demolished materials such as concrete, asphalt and soils,” said Vangsted and Roberto. “Most are processed here onsite to be reused as gravel base, structural fill and landscape bedding.” Away from the beaches, of course. For more information, visit www.pihlinc.us. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.)
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 11, 2013 • Page 11
Tyler Equipment
C.N. Wood Co., Inc.
Joseph Equipment Company
251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351
200 Merrimac St. Woburn, MA 01801 (781) 935-1919
300 Gay Street Manchester, NH 03103 603-641-8608
Avon, MA (508) 584-8484
www.josephequipment.com
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848
www.tylerequipment.com
Johnston, RI (401) 942-9191
www.cn-wood.com
Page 12 • September 11, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
The all-new 2500RT track loader from Mustang raises the bar with its highcapacity strength. Teamed up with its brothers, the 1750RT and 2100RT, these track loaders provide patented, industryexclusive features sure to blaze a new trail in the track loader market.
1(:
200 Merrimac Street Woburn, MA 781-935-1919
102 State Road Whately, MA 413-665-7009
60 Shun Pike Johnston, RI 401-942-9191
140 Wales Avenue Avon, MA 508-584-8484