NewEngland #21,2012

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

FormErly

95

202

7

®

91

9

95

93

2

95 2

93 90

90

7

october 10 2012

95 91

7

3

84

495 6

84

6 195

395

95 91

6

e

q

u

i

P

M

e

N

t

g

u

i

d

e

95

95

Vol. XliX • No. 21

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New england states connection •  rachel slavid 1-800-225-8448 •  kent Hogeboom 1-800-988-1203

2012 EZ Screen 1200XL New option separate 3 Products

New Kenneth F. Burns Bridge to Link Worcester, Shrewsbury

Kraft Power Corporation

Engines, Parts & Service

800-969-6121 Woburn, MA & Syracuse, NY

Authorized Deutz Distributor

MULTI MACHINE INC. Best We stock Prices ruBBer tracks for over 2,500 Models! some used tracks available.

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

• GUARANTEED TO FIT • HIGH QUALITY • FAST SHIPPING

888-888-1248

$39,500 plus freight. other screeners available

argus iNdustrial co. www.ez-screen.com

866-745-5828 GORILLA HAMMER

WANTS YOUR HAMMER REPAIR CALL 888-81-GORILLA (46745)

kraft Power corporation Perkins Master Service Dealer NJ, MA & NY Engines, Parts & Service

800-969-6121 www.kraftpower.com

Auctioneering & Liquidation

ITL Auctioneering

www.itlauctions.us Justin Lyerla (508) 824-3262

By Jay adams

WaNted CATERPILLAR EQUIPMENT Call Lou Giza www.foleyengines.com

w

One of the most unique components of this bridge is the architectural LED strip lighting that will illuminate the underside of the arches. There also is LED lighting mounted in the handrails to light the sidewalks.

603-595-2090

CEG CORRESPONDENT

For too many years, the second-largest city in Massachusetts has been maligned for urban decay, crime, even ugliness going and coming. The joke around Worcester was how best to leave it. That joke has now been turned on its head. The best way to visit and leave Worcester (to and from Shrewsbury) will be over a new, specially designed $89.9 million bridge that will shine like an all-night beacon gateway. The Kenneth F. Burns Bridge is the first of five megaprojects in Gov. Deval Patrick/Lt. Gov. Tim Murray administration’s Accelerated Bridge Program, which has earmarked federal and state funding of about $3 billion to replace many well-traveled but decaying spans across the Commonwealth over the next decade. Middlesex Corp., a contractor in the New England region, is the design-build force behind the replacement project. The present decomposing span will have hit the century mark when demolished by 2015.

Named For Great Public Servant The current concrete deck arch bridge dates to World War I when it was constructed in 1916 by the Massachusets Highway Commission, and has been repaired and reconfigured several times in the past 96 years. The bridge — currently owned by the Massachusets Department of Transportation (MassDOT) — has reached the end of its useful lifespan. The span currently carries an average of 53,000 vehicles per day. The bridge also carries Rte. 9 over Lake Quinsigamond and connects the city of Worcester with the town of Shrewsbury. According to Michael Verseckes of the Public Affairs Office of MassDOT, the bridge serves as a gateway to local business districts, the major regional medical and biotech hub for the area and offers a view of Lake Quinsigamond. Verseckes lauded the local man and mentor who officials have chosen to honor in naming this new bridge. “Kenneth F. Burns served on the Shrewsbury police force see Bridge page 6


Page 2 • October 10, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

THE W.I. CLARK COMPANY Brookfield, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316

2008 Deere 524K

2004 Case 321D

c/air, hi lift, hi- vis hyd coupler w/2.75 yd bucket, radials

c/air, hyd coupler, aux hyds, fully serviced, 80% rubber

2011 Deere 244J

2006 Deere 544J

c/air, r/c, 1.4 yd bucket, hyd cplr, 3rd valve hyds, R20’s, like new condition

A/C, RC, 3rd valve hyds, JRB hyd cplr and 3 yd bucket

stk# 20889 ........................$110,500

stk# 20830 ..........................$45,000

stk# 21173 ..........................$69,500

stk# 21348 ........................$127,500

2007 Deere 50D

IR HP1600WCU

2010 Takeuchi TL250

2005 Hitachi ZX225USLC

ROPS, 890 hours, hydraulic thumb

Cummins power, 2150 hrs, very good condition

stk# 20936 ..........................$44,000

stk# 20097 ........................$110,500

stk#21233 ............................$43,500

stk# 21153 ........................$108,500

2005 LeeBoy 8515

2008 Komatsu PC45MR-3

2006 Deere 450JLGP

2009 Carlson CP-90

Deutz engine, 8-15" Legend screed, 50% on all wear items, ready for paving

stk# 19768 ............................$45,000

c/air, 42” pin on bucket, 1780 original hours, fully serviced and ready for work

C/air, pilot controls, Hi-Flo hyds and 80" bucket

c/air, 24" bucket, hyd thumb, 880 hrs

c/air, 2400 hrs, 115” blade, very good condition

Cat engine, 8-15’ electric screed, 416 demo hours, excellent condition

stk# 21314 ............................$42,500

stk# 20503 ..........................$51,500

stk# 20713 ........................$124,500

WHEEL LOADERS 1990 CAT IT28B, C/HEAT, 3RD VALVE HYDS, HYD COUPLER, 2.5 YD BKT, 10,600 HRS ONE OWNER MACHINE, STK# 21338 ......................................................................................$35,000 2004 CASE 321D, C/AIR, HYDRAULIC COUPLER, 80% RUBBER, STK# 20830 ........................................................$45,000 2011 DEERE 244J, C/AIR, R/C 3 VALVE HYDS, 1 YD BUCKET WITH HYD CPLR, EXCELLENT CONDITION, STK# 22179 .......... ......................................................................................$72,500 2008 DEERE 344J, A/C, RC, 3RD VALVE HYDS, HYD COUPLER, 920 HRS, STK#20274 ........................................$98,500 SKID STEERS 2010 TAKEUCHI TL250, C/AIR, PILOT CONTROLS, HI-FLO HYDS AND 80" BUCKET, STK# 21233 ..........................$43,500

DOZER – CRAWLER 2005 DEERE 750J, S/N TO750JX110563, C/AIR, PAT BLADE, RECENT SERVICE, CLEAN MACHINE, STK# 19345 ....$131,500 2007 DEERE 1050J, A/C, 24" PADS, 159" SEMI-U BLADE, MS RIPPER, NEW PAINT, STK#20688 ..............................$315,000 EXCAVATOR – CRAWLER 1984 DEERE 450D, 6 WAY BLADE, GOOD CONDITION, STK# 21370............................................................................$17,000 2005 HITACHI ZX225LC, C/AIR, 42” BUCKET, EXCELLENT CONDITION, 1750 HRS, STK# 21153 ........................$108,500 PAVERS 2005 LEEBOY 8515, DEUTZ ENGINE, 8-15” LEGEND SCREED, 50% ON ALL WEAR ITEMS, READY FOR PAVING, STK# 19768 ......................................................................................$45,000

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 10, 2012 • Page 3

FEATURED MACHINE

2003 Caterpillar 330C, #12178, 9,252 hours, 34" Pads, 12'9" Stick/Arm, 48" Bucket, Pin Grabber Coupler $92,000

We would like to thank our customers for 90 successful years.We will continue to serve you with the best equipment, service, parts, rentals and expertise.

SOLD 1989 John Deere 544E Loader #EQ8265, 13,900 Hrs, Municipality Trade In $27,000

2002 Volvo EC35 Compact Excavator #EQ8887, 24” Volvo H/O Bucket, NEW 12” Rubber Tracks, 2635 Hrs $26,000

SOLD 1986 Volvo 5350B #11638, 18,490 Hrs, Volvo TD71GA, ZF5 HP500AUOT Shift, EROPS, 23.5R25 Tires $20,000

2008 ASTEC RT 460 Trencher #EQ8829, 613 Hrs, Kubota V1505 Engine $21,000

www.tylerequipment.com u SALES u PARTS u SERVICE u RENTALS u CUSTOMER SUPPORT u

2009 Volvo MW500 Milling Machine #EQ8608, 403 Hrs Call for Price

MAIN OFFICE-MASS 251 Shaker Road East Longmeadow, MA 01028 1-800-292-6351 Parts Department: 877-255-6351

CONNECTICUT 1980 Berlin Turnpike Berlin, CT 06037 1-800-352-4473 Parts Department: 860-356-0848


Page 4 • October 10, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Huge Highway Project Calls for Pair of Doosan Excavators At times, transportation construction projects in the Boston, Mass., area seem like they go on forever. The Central Artery/Third Harbor Tunnel project, known as “The Big Dig,” turned out to be the nation’s most complex and expensive (almost $15 billion) highway project. It took 16 years to complete. The job currently in the “when-will-it-ever-end?” spotlight is taking place on the south side of Boston. The Route 128/I-95 Add-a-Lane Roadway project consists of nearly 14 mi. (22.5 km) of widening, repairing and rehabbing from Wellesley to Route 93 in Randolph. It crosses 22 different roads, three railroad lines and two rivers. Decade-Long Project The $354 million project began in 2003 and is expected to be completed in late 2015 or early 2016. Among the work being done is the installation of an additional 12-ft. (3.6 m) travel lane and a 10-ft. (3 m) shoulder in each direction, along with new collector/distribution roads. Several bridges had to be repaired and widened before the adjacent highway could be addressed. The goal is to make that stretch of the heavily traveled highway into four lanes in each direction, thereby increasing travel capacity by as much as 25 percent and eliminating driving in the breakdown lanes during rush hour.

NEW ENGLAND EDITION Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Asst. Circulation Mgr. Main office

For advertising rates: Contact

Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Reckner Pete Sigmund John Pinkerton Tom Weinmann Rolf Krog Cathy Printz

470 Maryland Drive Fort Washington, PA 19034

best places to work in Massachusetts and one of the area’s largest private companies, according to the Boston Business Journal. It also has been awarded the top Mass Port Authority Contractor of the Year on multiple occasions. Paul Trubiano, McCourt yard equipment supervisor, is not quite sure how many of the company’s 1,600 pieces of equipment are working on the Route 128 project at any one see MCCOURT page 11

118 Years Old and Still Going Strong

This Doosan wheel excavator is one of two models that McCourt Construction operates on road construction projects, in part of because of its ability to drive on established surfaces with minimal disruption.

215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910 Web site Editorial e-mail Advertising e-mail

Public Works Expert One of the firms working on this massive job is McCourt Construction Company, a New England construction company based in Boston, Mass., that has a long history of successfully completing public works projects — even in the most difficult conditions because of weather and traffic concerns. McCourt Construction has been recognized as one of the

Edwin M. McKeon Jr.

215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910 e-mail

tmckeon@cegltd.com

Kent Hogeboom •New York •New England 315/823-7668 Toll Free 800/988-1203 Fax 315/823-4136 Contact

e-mail

khogeboom@cegltd.com

Contact

Rachel Slavid Construction Equipment Guide

www.constructionequipmentguide.com editorial@cegltd.com production@cegltd.com Toll Free Fax e-mail

508/755-1585 800/225-8448 508/755-1584 rslavid@cegltd.com

Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2012, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.

As the oldest family-operated construction company in New England, McCourt Construction has a long history of achievement in both the public and private sector. McCourt has won numerous awards for public works projects, including building or rebuilding highways, airport runways, tunnels, bridges, utility systems and parks. The company also is the contractor of choice for many private developers. McCourt has built award-winning golf courses, parks, plazas and security infrastructure, as well as doing site work and demolition. Started in 1893 John McCourt left his job with Boston Gas to start his own construction firm in 1893. After he died in 1917, his wife Sabrina became one of the first women to lead a construction company. The second generation took over the company in the 1930s; the third generation in the 1950s. Richard McCourt joined the firm in 1968 and is now the fourth generation to manage the company. McCourt became one of the nation’s largest installers of coaxial cable in the 1980s, using a unique technique called “McCourt Boston Integral” to reduce time and costs. For more than six decades, McCourt Construction has performed work at Boston Logan International Airport. In fact, the company has built or rebuilt every runway and taxiway at the airport. After completing the airport’s first new runway in 30 years, McCourt received a letter of commendation from Logan Airport, which said in part: “This highly visible and controversial project was safely completed ontime, under budget and without controversy from the press or neighboring communities. This is a direct reflection of the attitude and professionalism that McCourt brings to every project, time after time.”


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 10, 2012 • Page 5

A A

Company Company A

Serving Servin ng All Of New England As authorized Terex® From Five Locations!

ACompany A A

Company Company Company

Your Y our partner parttner t ffor portable porrtable t bl Finlay Distributors... crushing and screening!

Jaw, IImpact mpact & C Cone one C Crushers rushers hers

2 & 3 Deck I nclined & Horizontal Screens

Heavy Duty Screens

Sales, Rentals, Parts and an nd Service Serrvice

Complete Modular Washing Systems

Chadwick-BaRoss has formed a team of specialists to provide sales and service to its screening and crushing customers throughout the six-state territory. For more information contact:

Bangor, ME 800-698-4838

Caribou, ME 800-270-2547

Chelmsford MA 800-804-0775

Concord, NH 800-477-4063 Or follow follow us:

Visit Our NEW Website

w www.chadwick-baross.com ww.chadwick-baross.com www.cbused.com w ww.cbused.com

Westbrook, ME 800-262-5714


Page 6 • October 10, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Burns Span to Feature Signature Gateway Elements BRIDGE from page 1

for 42 years and was police chief from 1947 until his retirement in 1970. Chief Burns was a champion sculler in his youth and was a successful rowing coach at Shrewsbury High School,” said Verseckes. “He was instrumental in bringing the Olympic crew trials to Lake Quinsigamond in 1932 and 1952, and in making the intercollegiate Eastern Sprints crew regatta a regular event at the lake for many years.” According to MassDOT, the bridge was found to be structurally deficient and the traffic operations required an upgrade, as preliminary traffic results indicated it would fail soon. Three-Year Plan in Phases Unlike in a traditional project where design firms create a completed design, which is then advertised and awarded to the lowest bidder, the design/build team in this project was chosen based on a best-value analysis using a design/build procurement process. According to Verseckes, the Middlesex Corp. proved its asset value in this process when it recently completed the Lowell Bridge Bundle Project on Interstate 495 in the Lowell, Mass., area. The $34-million design/build I-495 Lowell Bridge Bundle project fully replaced six major highway bridges on I-495 on the southern edge of the City of Lowell and also is part of Massachusetts’s $3 billion Accelerated Bridge Program. Between summer 2012 and late 2015, Middlesex Corp. will replace the current Burns Bridge with a new steel deck arch bridge. The new bridge will provide three travel lanes in both directions with exclusive left- and right-turn lanes on the westbound approach into Worcester. It also will include accessible sidewalks and dedicated bicycle lanes on both sides of the bridge. Federal funds will account for 80 percent of the project’s total cost over the next three years. “This will accommodate projected increases in traffic volumes, improve safety at the intersection of Route 9 and Lake Avenue and remove the need for eastbound motorists to make a U-turn on Lake Avenue North to access destinations on Lake Avenue South,”

The current Kenneth F. Burns bridge was constructed in 1916 by the Massachusetts Highway Commission.

Between summer 2012 and late 2015, Middlesex Corp. will replace the current Burns Bridge with a new steel deck arch bridge.

added Verseckes. The new replacement bridge will carry traffic over Lake Quinsigamond and MassDOT said this will mean environmental challenges, such as in-water work including driving piles, building piers and abutments. Proposed Phases of Work The start of preparatory utility relocation to facilitate construction was in July 2012. Following that, Middlesex Corp. implemented the following schedule, starting with demolition of the EB sidewalk the week of Aug. 13. • Summer 2012: Continuing design work, removal of the south sidewalk, trunk telephone line splicing and mobilization of marine operations. • Fall 2012: Beginning of heavy in-water work including driving piles, building piers and abutments for the new eastbound barrel. • Spring 2013: Arrival of steel for the eastbound barrel and start of steel erection. Roadwork construction starts. • Summer 2013: Steel work on the eastbound barrel. Roadway construction on Lake Avenue and Belmont Street including sidewalks and retaining walls. • Fall 2013: Deck construction on the eastbound barrel and moving of all traffic to the new span. • Winter 2013: Demolition of the existing Burns Bridge. New fiber optic cables shifted from the old span to the new bridge.

• Spring 2014: Beginning of heavy in-water work including driving piles, building piers and abutments for the new westbound barrel. • Fall 2014: Arrival of steel for the westbound barrel and start of steel erection. • Spring 2015: Deck construction for the westbound barrel. • Summer 2015: Eastbound and westbound lanes will be fully open to traffic. • Phase 1 Eastbound bridge complete and open to traffic: Dec. 2013 • Phase 2 Westbound bridge complete and open to traffic: Aug. 2015 Upon completion, some 4,300 tons (3,900 t) of structural steel, about 900 tons (816 t) of rebar and 12,000 cu. yds. (9,174 cu m) of concrete will have been used in the new span. Special Lighting Design The average driver will be able to see this new bridge from miles away because of a beacon-like lighting system that will give a futuristic appearance to the arches. “One of the most unique components of this bridge is the architectural LED strip lighting that will illuminate the underside of the arches. There is also LED lighting mounted in the handrails to light the sidewalks,” said Verseckes. The steel components of the bridge are being fabricated by Casco Bay Steel Structures, Portland, Maine.

“They will be trucked over the road to Worcester, where we have an off site staging area on Lake Quinsigamond that is about a half mile from the bridge,” he added. “The steel pieces will be offloaded onto Middlesex barges where they will be brought via water up to the bridge site. The erection and assembly of the steel will take approximately three months for each of the two phases.” Beyond the dazzling nighttime light display, the Burns Bridge project will illustrate its own valuable history and educate the public at the same time with vista overlooks. “There will be eight overlooks on the bridge, each with an interpretive panel. The subjects are: History of the bridges at the crossing; natural history of the lake; Native American history around the lake; the regatta; White City Amusement Park; history of Worcester; history of Shrewsbury; and one dedicated to local veterans,” said Verseckes. “There also will be bronze plaques at either end of the bridge commemorating Kenneth F. Burns.” The bridge also will have signature gateway elements, including four sail sculptures with seating areas and LED lines of light. The design seeks to create a new bridge that will accommodate all users while minimizing impacts to the intersections or the homes and businesses on either side of the bridge adjacent to the state highway layout line in Worcester and

Shrewsbury. The proposed roadway profile will be raised in order to provide improved vertical under-clearance for recreational users of the lake. Bicycle lanes on the bridge and sidewalks will be provided in both directions. Work also will be undertaken on Lake Avenue to the north and south of Route 9 to improve bicycle and pedestrian accommodations. Officials Laud the Proposal Ground was officially broken by Lt. Gov. Tim Murray and various officials earlier this summer. “The Accelerated Bridge Program is extremely effective at rapidly rebuilding deficient bridges in our cities and towns,” said Murray. “By partnering with state, local and federal officials, we are moving forward to replace the Burns Bridge, a bridge heavily used by commuters traveling in and out of Worcester. In doing so, we are also creating jobs and boosting our local economy.” U.S. Congressman James McGovern said, “This bridge will be more than a link between Shrewsbury and Worcester, it will serve as a gateway to vital business districts; to a major regional medical and biotech hub; and to one of our region’s great natural resources in Lake Quinsigamond.” According to the Public Affairs office of MassDOT, since it began in 2008, the Accelerated Bridge Program has created or sustained 15,404 direct construction jobs and approximately 38,000 indirect jobs. For more information, visit the Project Schedule Report tab on www.massdotprojectkenburnsbridge.info/report.html. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 10, 2012 • Page 7

CUES Plans NCCCO Crane Training Classes in N.H. CUES Inc. (Consolidated Utility Equipment Service) has scheduled crane training classes at its Amherst, N.H., location. The courses, which run from Oct. 15 to 19, are being led by Associated Training Services (ATS). The training sessions will help participants learn the written material and the skills needed to pass written and practical exams on a variety of crane types. Classes also will include NCCCO (National Commission for Certification of Crane Operators) certification and mobile crane operator certification. On Oct. 20, CUES will host a rigger/signalperson qualification program. This program meets the OSHA qualification standard and includes written and practical training and testing. A qualification compliance card is issued by Associated Training Services upon successful completion. About CUES CUES Inc., a New England An instructor looks on while a student guides a truck equipment company for more large heavy weight through an obstacle course than 40 years, has experience using the crane’s controls. building work trucks for a multitude of customers in many industries. The repairs and testing on thousands of aerial lifts company is the New England distributor of of all makes and models on an annual basis, UTEM aerial lift products and aerial work according to the company. CUES has offices in Amherst, N.H., and platforms, and Elliott Equipment brand North Franklin, Conn. boom trucks. For more information, call 800/258-1010 CUES offers experience in installing and repairing aerial lift, crane and truck equip- (New Hampshire) or 800/526-3916 ment. It also performs ANSI lift inspections, (Connecticut) or visit www.cuesequip.com.

The N.i.c.e. Company Northeast International Construction Equipment Co., Inc. “Your Newest Source for Quality Equipment”

I Buy Machines

1999 Cat 950G, runs good, command control, 16K hours..............................................................$57,500

2006 Cat 930G, VERY NICE!, 2800 hours .............. ...................................................................... $89,000

GET YOUR LOADERS NOW 2002 WA180, bucket/forks..................................$59,000 2006 Cat 930G, QC, bucket ..............................$89,000 2006 Hyundai HL757, nice ..............................$69,000 420D/420E/420EIT Now Off 495 in Franklin!!! 76 Grove St., Franklin, MA

508-966-4888 508-966-4887

Call Bryn Smith at:

Fax:

Email: brynsmith@thenicecompany.com

A student is maneuvering through the obstacle course for crane training while the instructor uses hand signals.

See all of my machines at www.thenicecompany.com


Page 8 • October 10, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

We’ve become attached to your machines. b Sandvik (Rammer) E-Series hydraulic impact hammers

Sandvik (Rammer) G-Series hydraulic impact hammers t

( t

o

Where can you go to get high performance boom-mounted attachments? Allied Construction Products, LLC

For over 65 years, we’ve developed many attachments that are legendary in the construction and demolition industries that demand high performance. Names like Ho-Ram, Hy-Ram®, Rammer, Ho-Pac® and Pedestal Breaker System™ are names that equal: Ê UÊSimple, proven design (Our attachments have high resale or trade-in value) Reliable performance (If you purchased you’re probably AR Series™ an Allied attachment, U Reliable performance (If you purchased an Allied attachment, you’re probably still using it) hydraulic impact hammers still using it) U Superior productivity (Compare AEM– formerly CIMA– ratings, our attachments get the job done faster) attachments get the job done faster) And, now Allied adds to that great family background with the Sandvik (Rammer) and AR Series™ hammers. Allied’s attachments don’t take a back seat to any competitor. In particular, our Sandvik (Rammer) product features a long-stroke design, all oil operation and ProControl. All of our high performance boom-mounted attachments are supported by the most respected parts and service organization in North America. Customer satisfaction is job one at Allied. Great products supported by people who know the industry and its customers. To put a high performance Allied attachment on your machine, call the Tyler Equipment Corporation office nearest you. We’ve become attached to your machines.

®

Pedestal Breaker System™ stationary boom systems

Ho-Pac vibratory compactor/drivers

Tyler Equipment Corporation Main Office MAIN OFFICE: 251251 Shaker Road Shaker Road East Longmeadow, East Longmeadow,MA MA 01028 01028 1-800-292-6351

Tel: 413-525-6351

Prospect, CT CT LOCATION: NEW 1980 Berlin Turnpike Tel: 203-758-3925 Berlin, CT 06037 1-800-352-4473

www.tylerequipment.com

Sandvik (Rammer) S-Series hydraulic impact hammers

Contractor’s Mechanical Grapple material and waste handling systems

© 2008 Allied Construction Products, LLC

South Coast Improvement Company Taps Whalen as Veep of Business Dev. South Coast Improvement Company, based in Marion, Mass., one of the largest providers of design/build, construction and renovation services in the northeast and mid-atlantic states, has recently named Sean J. Whalen as vice president of business development. In his new role at South Coast Improvement, Whalen’s responsibilities will include building relationships and strategic alliances, channel development, expanding the company’s sales markets and overseeing the sales team. Whalen has more than 22 years of business development experience working for large public and private corporations as well as start-ups. He has held a number of senior positions over the years, most recently, he served as a senior account executive at CGL Electronic Security Inc. of Norwood. Prior to that, Whalen was commercial

sales director at DriveABLE and director of sales, Eastern USA at Magtec Products Inc. One of Whalen’s most notable achievements while serving as director national accounts/OEM at LoJack Corporation was development of a new channel of distribution for the company which focused on commercial construction equipment, national accounts and transportation. He successfully implemented OEM installations and secured the company’s single largest order in history, $1.5 million. About South Coast Improvement South Coast Improvement offers an extensive range of design, construction and construction management services regionally in the Northeast and across the United States. With decades of experience, the company is engaged in projects across sectors that

include healthcare, institutional, commercial, hospitality and planned communities/residential. The company offers pre-construction analysis, construction management, general contracting, design/build services, capital improvement, building envelope improvements and interior renovations. South Coast Improvement maintains memberships and professional affiliations with the Assisted Living Facility Association, the American Society of Interior Designers, the International Facility Managers Association, the Community Associations Institute, as well as International Real Estate Managers and the Greater New Bedford Chamber of Commerce. South Coast Improvement is headquartered at 208 Wareham Road in Marion, Mass. For more information, call 888/4488887 or visit www.southcoast improvement.com.

Sean Whalen’s responsibilities will include building relationships and strategic alliances, channel development, expanding the company’s sales markets and overseeing the sales team.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 10, 2012 • Page 9

A

STRONGCO Company

Chadwick-BaRoss, Inc. 15 Katrina Road • Chelmsford, Massachusetts (800) 804-0775 • (978) 256-9571 Fax: (978) 256-8802 www.chadwick-baross.com • www.cbused.com

www.cor-equip.com RM100GO!

“The Rubble Master RM100GO! has many great features including the new MS100GO! mesh screen box. The RM100GO! has increased my production and lowered my operating costs for a crusher. The low fuel consumption and ease of operation of this closed circuit plant is simply amazing.” Blake Luciani Crushing operations manager, West Rock Materials, Woodbridge, CT

Blake Luciani

Warren Luciani

Crush Concrete/Asphalt/Rock • Produce a 3/4” Minus in One Pass Mobilizes in One Load • Low Fuel Consumption • Eliminate Dumping Fees

Sales • Parts • Service • Rentals 226 Selleck St. Suite C • Stamford, CT 06902

(203) 569-0339


Page 10 • October 10, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc •Maine... Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc

‘Pine Tree State’ Highway Projects Let

The Maine Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: York Contract ID: 015817.00 Location: Kittery and York, Route 1. Project: Highway resurfacing. Work includes hot mix. Contractors and Bid Amounts: • Pike Industries Inc. — $2,272,367 • Brox Industries — $2,415,111 County: Penobscot and Piscataquis Contract ID: 018291.00 Location: Sangerville, Route 23, and Dexter-Garland, Route 7. Project: Work includes hot mix asphalt. Contractors and Bid Amounts: • Pike Industries Inc. — $1,724,724 • Lane Construction Corporation (The) — $1,778,944 County: Waldo and Penobscot Contract ID: 018307.00 Location: Unity Troy and Dixmont, Route M9/202. Project: HMA overlay. Contractors and Bid Amounts: • Pike Industries Inc. — $2,147,621 • Lane Construction Corporation (The) — $2,370,597 County: York Contract ID: 012665.00 Location: York, Sewalls Bridge. Project: Bridge rehabilitation. Contractors and Bid Amounts: • Reed & Reed Inc. — $3,466,232 • CPM Constructors — $3,478,307 • Prock Marine Company — $3,884,524 • Wyman & Simpson Inc. — $3,980,300 • T. Buck Construction Inc. — $4,275,000 • New England Infrastructure Inc. — $4,954,351 County: Waldo Contract ID: 015108.00 Location: Stockton Springs Bridge over U.S. Route 1. Project: Underpass bridge replacement. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $1,221,997 • CPM Constructors — $1,399,770 • T. Buck Construction Inc. — $1,421,000 • R F Jordan & Sons Construction Inc. — $1,511,883 • Wyman & Simpson Inc. — $1,574,164 • Stetson & Watson J. V. — $1,597,025 • Reed & Reed Inc. — $1,621,003 County: Somerset Contract ID: 018269.00 Location: Anson, Embden, Kingfield, Lexington Twp. and

New Portland. Project: Light capital paving. Contractors and Bid Amounts: • Bruce A. Manzer Inc. — $2,479,970 • Pike Industries Inc. — $2,908,965 County: Penobscot Contract ID: 019212.00 Location: Brewer, South Main Street. Project: Milling and overlay. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $251,482 • Pike Industries Inc. — $381,367 County: Somerset and Piscataquis Contract ID: 019161.00 Location: Taunton and Raynham (Route 6/15) and Rockwood, Taunton and Raynham Shirley, Route 6. Project: Highway resurfacing. Contractors and Bid Amounts: • Pike Industries Inc. — $3,726,738 • Farrin Bros. & Smith Inc. — $4,116,700 • Lane Construction Corporation (The) — $4,215,819 County: Aroostook Contract ID: 019228.00 Location: Danforth, Route 1 Weston, Orient, Route 1. Project: Highway resurfacing. Contractors and Bid Amounts: • Northern Maine Paving, Inc. — $1,232,087 • Lane Construction Corporation (The) — $1,254,765

County: Waldo Contract ID: 019781.00 Location: Burnham. Project: Drainage replacement. Work includes drainage pipe. Contractors and Bid Amounts: • Dirt Diggers Inc. — $28,460 • F C Work & Sons Inc. — $44,165 • N F Luce Inc. — $59,000 • Emery Lee & Sons Inc. — $70,998 • Ranger Contracting — $73,096 • CPM Constructors — $78,100 • Nitram Excavation & General Contractor Inc. — $79,269 • Freeman Construction — $91,754 • Randy Gardner d/b/a Gardner Construction Enterprises — $114,000 • Manter Construction — $143,195 • E.J. Perry Construction Company Inc. — $149,049 County: Androscoggin Contract ID: 013060.00 Location: Lewiston. Project: Highway reconstruction. Contractors and Bid Amounts: • Gendron & Gendron Inc. — $709,999 • K & K Excavation Inc. — $769,961 • St. Laurent & Son, Inc. aka Maine Heavy Equipment Rental Inc. — $776,713 • Pratt & Sons Inc. — $778,600 • Peters Construction Inc. — $823,414 • CPM Constructors — $834,929 • A H Grover Inc. — $854,601


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 10, 2012 • Page 11

McCourt Construction Company Brings DISPLAY ADS/ Plenty of Equipment to Add-a-Lane Job CLASSIFIEDS MCCOURT from page 4

he said. “They work very well. As far as I am contime, but he knows they cerned, Doosan excavators have twice as many are as good as any of them.” machines as they need. According to the compaTrubiano has worked for ny Web site, “McCourt McCourt Construction for Construction understands more than 30 years. “The logistics of the jobs the importance of having the require us to have additional right equipment for each job. equipment on site,” he said. We are continually updating “We are working in multiple our fleet to ensure the best locations, so rather than Paul Trubiano, McCourt yard equipment supervisor. possible production results moving 10 machines every on all of our projects. Our week, we have 20. We leave them in all ing the streets. They are very handy for central garage is staffed with the best the strategic areas so they are available that type of work because of their trav- mechanics around and the most model speed and mobility.” wherever we are working.” During the Route 128 project, the ern machinery in the industry.” Added Trubiano: “Production is the excavators are taking on a variety of Doosan Excavator Duo most important factor for us. We rely Among the McCourt Construction tasks, including installing utilities, on our equipment to be operating at equipment committed to this project grading slopes, general excavation and peak performance every day. Our expeare two Doosan wheel excavators — cleanup. rience with Doosan excavators is that Trubiano regularly requests feedboth purchased from Bobcat of Boston. “Doosan rubber-tired machines are back from foremen and operators on they are very reliable.” This article was reprinted with pergood urban excavators,” Trubiano said. how the Doosan excavators are permission from DoMore Magazine, “We do a lot of utility work and you forming on the job. can move them around without damag“They like the Doosan excavators,” Spring 2012 issue.

Classified Rates: 30 Words or Less for $30.00. Each Additional Word is 95¢. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 AERIAL LIFTS

FORESTRY EQUIPMENT

Manlifts

Logging Equipment

GRADALL / LULL Sales - Service - Training

2004 Rayco RG-50, 66 HP diesel, self propelled, dozer blade, trailer, good condition, 2044 hours....$18,000.

Modern Equipment Sales & Rental 800-445-4381

Jason Niro 732-446-7600 FORKLIFTS

JLG, GENIE, SKYJACK, MEC, GROVE, TEREX, SNORKEL RENTALS-PARTS SERVICE-TRAINING AMI INSPECTIONS-SALES

Industrial Forklifts GRADALL / LULL Sales - Service - Training Modern Equipment Sales & Rental 800-445-4381

‘’Unlock Your Lifting Solutions’’

SMART LIFTS Find Out What You Are Missing

KEY EQUIPMENT SALES & RENTAL, INC. 1-877-539-5438 1-877-KEY-LIFT

RENTALS-SALES-SERVICE

www.keyequipmentinc.com

‘’Unlock Your Lifting Solutions’’

AIR COMPRESSORS

KEY EQUIPMENT SALES & RENTAL, INC. 1-877-539-5438 1-877-KEY-LIFT

Compressors AIRMAN COMPRESSORS

Hydraulic Cranes 6-365 Ton

Bijur Automatic Lubrication Systems VEI Wheel Loader Scales West Springfield, MA 01089-3850 (413) 788-LUBE

Daily & Hourly Services www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

Lubrication Engineers High Performance Lubricants Professional Lubrication Management

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 an issue only $45 an issue only $40 an issue

Eagle Power & Equipment

CHAIN-LINK & WOOD FENCE PRODUCTS

Montgomeryville PA 215/699-587

Galvanized & Vinyl Chainlink Fence Galvanized & Vinyl Fence Pipe Cedar Picket & Board Wood Fence Galvanized & Vinyl Fence Hardware Huge Inventory Available at Wholesale Prices Call Today Delivery For Pricing... Available

New Castle DE 302/652-3028 Eagle PA 610/458-7054

Mid-City Steel Fence 190 State Rd. (Rte 6) Westport, MA Ask for Paul J. Aguiar

(508) 646-9800 ==============Office: Cell: (508) 951-6092 DAILYAND AND WEEKLY Fax: (508) 676-5400 DAILY WEEKLY

EQUIPMENT RENTALS EQUIPMENT RENTALS

CLOSE YOUR JOB SITE CLOSE TOTO YOUR JOB SITE

RENTMACHINES.COM RENTMACHINES.COM

* pre-payment required

NEW REPLACEMENT PARTS FOR CRANES, DRAGLINES, SHOVELS, BACKHOES, EXCAVATORS, TRACTORS AND ELEVATING SCRAPERS

CATERPILLAR CATERPILLAR ® ® GENIE Undercarriage and upper parts, all makes and GENIE models, in stock, lowest prices anywhere ® CHALLENGER CHALLENGER® A.C.R. PARTS DIVISION ® ® 19615 SCREEN MACHINE SCREEN MACHINE Nottingham Rd., Cleveland OH 44110 ®

Call now to reserve your space! 800-225-8448

www.keyequipmentinc.com

®

Phone: 216-531-8000 • Fax: 216-531-8852 E-MAIL: acrequipment@cs.com • www.acrequipment.com


Page 12 • October 10, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Vermont... Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison •

‘Green Mountain State’ Highway Projects Let

The Vermont Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Orleans Town: Newport City Project Name: NEWPORT CITY BRO 1449(25). Contract ID: 96J314 Location: Beginning approximately 0.05 mi. east of the intersection of T.H. 11 (Railroad Square) And U.S. Route 5 (East Main Street) and proceeding easterly 0.102 mi. Project: Removal of existing structure, construction of new 3 span continuous composite steel girder superstructure, new abutments and piers, and related roadway work. Contractors and Bid Amounts: • Reed & Reed Inc. — $5,192,093 • CCS Constructors LLC — $5,214,698 • A.L. St. Onge Contractor Inc. — $5,599,998 • Northern Construction Service LLC — $5,639,009 • New England Infrastructure Inc. — $5,957,387 • Kubricky Construction Corporation — $6,258,800 • The Lane Construction Corporation — $6,449,548 • Winterset Inc. — $7,704,499 • J. A. McDonald Inc. — $8,248,970

County: Rutland Town: Wallingford Project Name: WALLINGFORD STP GMRC(8)(READ). Contract ID: 09G094 Location: GMRC Mile Post 40.654 in Wallingford Crossing Vt. 103 aat Mile Post 1.15. Project: Replacement of bearings, rehabilitation of bridge bearing seats, related concrete and masonry repairs and structural steel repairs. Contractors and Bid Amounts: • Renaud Brothers Inc. — $489,100 • T. Buck Construction Inc. — $559,995 • Engineers Construction Inc. — $749,258 • CCS Constructors LLC — $763,000

County: Addison Towns: Salisbury and Middlebury Project Names: SALISBURY WCRS(15)(RE-AD) and MIDDLEBURY WCRS(16)(RE-AD). Contract ID: 09G104 Location: VTR Bridge No. 232 over an overflow channel at Mile Post 82.81. VTR Bridge No. 234 over an overflow channel at Mile Post 83.80. Project: Removal of existing concrete slab superstructure. Installation of new prestressed concrete voided slabs. Repair of substructure concrete at the abutments and piers. Contractors and Bid Amounts:

• Engineers Construction Inc. — $899,974 • Harrison & Burrowes Bridge Constructors Inc. — $1,073,797

County: Chittenden Towns: Burlington and South Burlington Project Name: BURLINGTON-S. BURL. NH 2624(1). Contract ID: 06D216 Location: Beginning in the city of Burlington on U.S. Route 2 at STA. 1+26.72 (MM 0.024) and extending easterly along U.S. Route 2 for a distance of 16443.74 ft. (3.114 mi.) to STA. 121+33.44 (MM 2.298) in the city of South Burlington. Project: Work to be performed under this project includes cold planing and resurfacing of the existing highway with a leveling and wearing course, new pavement markings, signs, video detection cameras and other related highway items. Contractors and Bid Amounts: • Frank W. Whitcomb Construction Corporation — $3,466,383 • Engineers Construction Inc. — $4,365,823 • Pike Industries Inc. — $4,424,132

County: Orange Town: Thetford Project Name: THETFORD BHF 0177(9). Contract ID: 08J174

Location: Vt. 132 (TH 1); Bridge 8 over the West Branch Ompompanoosuc River, approximately 0.03 mi. east of the intersection of Tucker Hill Road (TH 6) and Vt. 132 (TH 1). Project: Removal and replacement of existing superstructure with a concrete deck and curved steel plate girders; rehabilitation of existing substructure and minor approach work. Contractors and Bid Amounts: • A.L. St. Onge Contractor Inc. — $2,393,455 • Winterset Inc. — $2,513,747 • T. Buck Construction Inc. — $2,863,313 • Miller Construction Inc. — $2,903,677 • New England Infrastructure Inc. — $2,940,135 • Cold River Bridges LLC — $2,983,256 • CCS Constructors LLC — $3,113,000 • Northern Construction Service LLC — $3,254,000

County: Statewide/multiple counties Town: Statewide/multiple town projects Project Name: STATEWIDE STP CRAK(30). Contract ID: 12K010 Location: Various highway facilities statewide. Project: The routing and sealing of cracks in bituminous concrete pavement on existing state, U.S., and interstate highways and the appropriate traffic control. Contractors and Bid Amounts: • Nicom Coatings Corporation — $445,865 • Annseal, Inc. — $485,357


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 10, 2012 • Page 13

160 Elm Street, P.O. Box 857 Walpole, MA 02081 (508) 660-7600 Fax: (508) 660-7614

www.lhequip.com

A.T. Equipment, Inc.

LONG REACH RENTALS

Office

(508) 865-0400 Sales and Rentals

(508) 523-8852 www.atequipment.com

• Heavy equipment rental and sales • Hydraulic hammer rental and sales 100 ft lb to 20,000 ft lb • Complete hydraulic hammer rebuilds (all makes)

Komatsu PC270/PC300’s with 60’ Reaches Starting at $10,000 Per Month!

• Authorized Yanmar Mini Excavators and construction equipment dealer

WHAT A CHILD LEARNS ABOUT VIOLENCE A CHILD LEARNS FOR LIFE. Everything you say and everything you do serves as a lesson to your child about violence. A lesson that will never be forgotten. Teach carefully. We can show you how. Call 877-ACT-WISE for a free brochure or visit www.actagainstviolence.org.

Pictured above is the NEW 20,000 ft. lb. hammer available for purchase today!! 81 Worcester Providence Turnpike, Sutton, MA 01590

There are over 300 machines for your rental needs! Contact: Randall Sanderson ®

(603) 623-3669 E-mail: rsanderson@tquip.com 342 Rockingham Road • Londonderry, NH 03053


Page 14 • October 10, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX

ISSA Supports Pavement Preservation Research Work

A T EQUIPMENT INC ..............................................13 ACR EQUIPMENT ....................................................11 ARGUS INDUSTRIAL COMPANY ..............................1 ASTRO CRANE ........................................................11 C N WOOD CO INC..................................................16 CHADWICK BAROSS MA ......................................5,9 CLASSIFIED ............................................................11 CONTRACTOR’S CORNER ....................................11 COR EQUIPMENT SALES ........................................9 FOLEY MARINE & INDUSTRIAL ENGINE ................1 GORILLA HAMMERS ................................................1 ITL AUCTIONEERING ................................................1 J R VINAGRO CORPORATION ................................1 KRAFT POWER CORP ..............................................1 LORUSSO HEAVY EQUIPMENT LLC ....................13 LOU GIZA EQUIPMENT ............................................1 LUBRICATION TECHNOLOGIES INC ....................11 MASTHEAD ................................................................1 MID CITY STEEL CO ................................................11 MILTON CAT..............................................................11 MULTI MACHINE INC ................................................1 ROGERS BROTHERS..............................................15 T-QUIP SALES & RENTAL INC ................................13 THE N.I.C.E. COMPANY ............................................7 TYLER EQUIPMENT CO ........................................3,8 W I CLARK CO............................................................2 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Performance monitoring of pavement preservation treatments in this cycle of the Pavement Test Track and on 2,500 ft. (762 m) of Lee Road 159 in Alabama will allow researchers to determine the service life extension of various pavement preservation techniques relative to pretreatment condition and explore ways to stretch transportation budgets.

With 50 years serving the pavement preservation industry, the International Slurry Surfacing Association (ISSA) is proud to be a supporter of the National Center for Asphalt Technology’s (NCAT) Pavement Preservation Effectiveness Study, the fifth cycle of the Pavement Test Track. Performance monitoring of pavement preservation treatments in this cycle of the Pavement Test Track and on 2,500 ft. (762 m) of Lee Road 159 in Alabama will allow researchers to determine the service life extension of various pavement preservation techniques relative to pretreatment condition and explore ways to stretch transportation budgets. Seven state departments of transportation and multiple private sponsors have stepped forward to support the expansion of the scope of this research project to include proactive maintenance methods. These methods include those that ISSA supports, slurry and micro surfacing, chip sealing and crack treatment, among others and will be used alone or in combination to test several methods in varying circumstances. ISSA is not only donating funding to this project, but the members that drive the association are donating their time, knowledge, expertise and even equipment to help facilitate proper pretreatment to post-treatment condition comparisons. “This three-year study should be great for the pavement preservation industry,” stated Doug Ford, 2012 ISSA president. “It will provide quantified results for each process and insight into the timing and processes

that best address each level of deterioration.” Since its creation in 1986, NCAT has sought to be a world leader in hot mix asphalt research, development, technology and education. The fourth cycle of the Pavement Test Track began in August 2009 and was completed 25 months later in September 2011. By design, this cycle took 17 of the over 40 200-ft. (61 m) sections of roadway involved in this project and either reconstructed or rehabilitated each of those sections. Now in the fifth cycle, NCAT has already applied a rejuvenating fog seal to two sections and a triple chip seal, which will be evaluated as an interlayer, to one section of the most recently reconstructed or rehabilitated sections of roadway. Lee Road 159 will be divided into 25, 100-ft. (30.5 m) sections that will receive other pavement preservation treatments including various methods of micro surfacing, chip sealing, crack treatment, fog sealing, scrub sealing and fiber mat. The Pavement Test Track and Lee Road 159 will be evaluated on a regular basis over the course of this 3-year study and progress reports will be published periodically. Founded in 1963, the International Slurry Surfacing Association (ISSA) is a nonprofit association dedicated to the interests, education and success of slurry and micro surfacing, chip sealing and crack treatment professionals and corporations around the world. For more information, call 410/267-0023 or visit www.slurry.org.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 10, 2012 • Page 15

Tyler Equipment

C.N. Wood Co., Inc.

Joseph Equipment Company

251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351

200 Merrimac St. Woburn, MA 01801 (781) 935-1919

300 Gay Street Manchester, NH 03103 603-641-8608

Avon, MA (508) 584-8484

www.josephequipment.com

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848

www.tylerequipment.com

Johnston, RI (401) 942-9191

www.cn-wood.com


Page 16 • October 10, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

D65-17 From Komatsu – The Dozer Experts

Komatsu has once again made a great machine even better. The new D65-17 increases productivity and operator comfort while lowering operating costs. All designed to improve your bottom line. t Efficient Komatsu Tier 4 Interim engine and automatic shift transmission with lockup torque converter maximize productivity while saving fuel. t PLUS (long life) undercarriage is standard, further reducing our already low operating costs. t Komatsu CARE provides complimentary Tier 4 maintenance, including KDPF exchange filters. Contact your Komatsu distributor for details.

200 Merrimac Street Woburn, MA 781-935-1919

60 Shun Pike Johnston, RI 401-942-9191

102 State Road Whately, MA 413-665-7009

140 Wales Avenue Avon, MA 508-584-8484


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.