New England 21 2013

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

FormErly

95

202

7

®

91

9

95

93

2

95 2

93 90

90

7

October 9 2013

95 91

7

495 6 195

395

95 91

3

84 6

84

6

E

q

u

I

P

m

E

N

T

g

u

I

D

E

95

95

Vol. XlIX • No. 21

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection •  Kent Hogeboom 1-800-988-1203

2013 EZ-Screen 1200XL

WE STOCK RUBBER TRACKS for Over 2,500 Models!

Crews install a work platform under the Longfellow Bridge for painting and steel refurbishing and replacement activities.

Some Used Tracks Available.

BEST PRICES! • GUARANTEED TO FIT • HIGH QUALITY • FAST SHIPPING

888-888-1248 New Option Separate 3 Products

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

$39,500 plus freight. Other Screeners Available

ArguS INDuSTrIAl CO.

Kraft Power Corporation

Engines, Parts & Service

800-969-6121 Woburn, MA & Syracuse, NY

Authorized Deutz Distributor

WANTED

www.ez-screen.com

CATERPILLAR EQUIPMENT

866-745-5828

Call Lou Giza

603-595-2090 Kraft Power Corporation Perkins Master Service Dealer NJ, MA & NY Engines, Parts & Service

800-969-6121

Auctioneering & Liquidation

ITL Auctioneering

www.itlauctions.us

www.kraftpower.com

Justin Lyerla (508) 824-3262

WANTS YOUR HAMMER REPAIR CALL 888-81-GORILLA (46745)

www.foleyengines.com

w

Longfellow Bridge In It for The Long Haul With Reconstruction Project By Jay Adams CEG CORRESPONDENT

After years of planning, design, careful attention to detours and the daunting feat of procuring the proper federal and state funding, work has begun on the reconstruction of the Longfellow Bridge, the critical vehicular commuter link connecting Cambridge to Boston over the famous Charles River. According to the Massachusetts Department of Transportation (MassDOT), the $255 million Longfellow Bridge Rehabilitation Project will address the bridge’s current structural deficiencies, upgrade its structural capacity and bring it up to modern code, including improving multimodal access and bridge street connections to meet accessibility guidelines. A new American with Disabilities Act pedestrian bridge crossing adjacent to the heavily travelled Storrow Drive also will be constructed as part of this project. The Longfellow remained one of the five most important, so-called “mega projects” for their scope and cost, prioritized by Gov. Deval L. Patrick, since he first assumed office six years ago. It has received funding, like the four other “megas,” through Patrick’s Accelerated Bridge Program, a

multi-billion dollar earmark established to address and repair the dozens of decaying and aging commuter spans across the Commonwealth. The other four mega projects in the design phase are the Burns Bridge in Worcester, John Greenleaf Whittier Bridge (Interstate 95) in Amesbury and Newburyport, the Fore River Bridge in Quincy and Weymouth, and the Spaghetti Ramps (Route 79/Interstate195) in Fall River. Six Stages Over the Next Three Years More than 28,000 vehicles cross the Longfellow Bridge daily, as they have for many decades. Its stone piers and abutments have endured the effects of the moving water of the Charles River and must be heavily bolstered. In addition, there is the added critical dilemma of keeping the important MBTA Red Line subway train, which carries thousands of commuters to-and-from Cambridge and Boston, operating over the bridge daily during the three years of planned reconstruction. Advertised by the Massachusetts Department of Transportation as a design-build project to save time and money, a construction team J.F. White Contracting Company in Stoughton/Framingham, Mass., Skanska USA see lONgFEllOW page 9


Page 2 • October 9, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

THE W.I. CLARK COMPANY Brookfield, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316

2009 Carlson CP-90

2010 Leeboy 8510

2007 CEC 5x12 Screening Plant

2007 Leeboy 1000F

Cat power, 8-15’ Carlson EZ screed, elertric heat, 80% remaining on wear items. stk# 21679 ..... ...........................................$72,000

Kubota diesel, 8-15’ Legend propane screed, 3 new screed plates, great condition, stk# 21501 ........................................$105,000

wheels, grizzly, ball deck, 3/4 square x 1- 1/2", stk# 18883.......... .........................................$105,000

8’-13’ propane, new extension screed plates, 80% main screed, new outer augers, fully serviced. stk# 21662 .........................$25,000

Cat 950B

2006 Deere 544J

2007 Wirtgen WR2500S

c/air, Mercedes power, 96” drum @ 90%, no emulsion, great condition, one owner, stk# 21569

$385,000 c/heat, one owner. stk# 21633 ....... ...........................................$60,000

A/C, RC, 3rd valve hyds, JRB hyd cplr and 3 yd bucket, stk# 21348... .........................................$127,500

2008 New Holland C175

2006 Deere 250D

2007 Deere 50D

2011 Deere 270DLC

c/heat, foot controls,72” bucket, new tracks and idlers. stk# 21686 ..........................................$24,000

25 ton haul truck, c, air, 80% radials, tailgate, great condition, stk# 20949........................$146,500

ROPS, 890 hours, hydraulic thumb, stk# 20936 ............$42,500

c/air, 10' 6" arm, 54" bucket, stk# 20958 ..............................$189,000

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 9, 2013 • Page 3 860-

T P

1999 VOLVO ZL402C, Stk #: 12763, S/N: 6009100, 3040 Hrs, Hyd C/Q, 3rd Hyd Function, 71” cy H/O SE GP Bckt, BOE, Clean ..............................$30,000

2007 VOLVO A30D, Stk #: EQ12032, 5870 Hours, 23.5R25 Rubber, Full Tailgate, Ready to Work! ........ ..................................................................$158,000

2010 VOLVO BL70, Stk #EQ8694, S/N: 20173, 850 Hours, 90 hp, 4WD, Clean ..........................$65,000

2008 VOLVO SD116DX, Stk #12710, S/N: 198190, 394 Hours, 160 hp, Ready to Work. 84” Drum ........ ..................................................................$110,000

2005 VOLVO DD118HFA, Stk #EQ0008369, S/N: 184231, 2200 Hrs, Cummins Eng, 78” Dbl Drum Vibratory Compactor ..................................$44,000

2006 VOLVO EC460B LC, Stk #11711, S/N: 80090, 7420 Hrs, Many New Parts; Track Chains, Sprockets, etc. READY TO WORK! ..........$150,000

COMPACTION EQUIPMENT

TRAILERS

1992 CAT CB-224B, 681 Hours ............................................................$7,500

2007 ROGERS 35 Ton Gooseneck Trailer ............................................$42,000

2008 VOLVO SD45D, 375 Hours ........................................................$42,500

2001 ROGERS 20 Ton Tag Trailer, 8’6”x19’ Main Deck w/ 6’ Beavertail, 2:15 Tires....$14,000

MASSACHUSETTS 251 Shaker Road, East Longmeadow, MA 01028 Direct: 413-525-6351 Toll Free: 800-292-6351 Parts Direct: 877-255-6351

www.tylerequipment.com

Volvo Construction Equipment

CONNECTICUT 1980 Berlin Turnpike, Direct: Toll Free: Parts Direct:

Berlin, CT 06037 860-356-0840 800-352-4473 860-356-0848

www.tylerequipment.com

800


Page 4 • October 9, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Canaan • Cornwall • Litchfield • New Hartford • New Milford • Washington • Darien • Greenwich • Stamford • East Lyme • Old Lyme • Connecticut... Plainfield • Fairfield • Hartford • Norwich •Stratford • Trumbull •Canaan • Cornwall • Litchfield • New Hartford • New Milford • Washington • Darien • Greenwich • Stamford • East Lyme • Old Lyme • Plainfield • Fairfield • Hartford • Greenwich •Canaan • Cornwall • Litchfield • New Hartford • New Milford • Washington • Darien • Greenwich • Stamford • East Lyme • Old Lyme • Plainfield • Fairfield • Hartford • Norwich •Stratford • Trumbull •Canaan • Cornwall • Litchfield • New Hartford • New Milford • Washington • Darien • Greenwich • Stamford

‘Constitution State’ Highway Projects Let

The Connecticut State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. Town/District: District 1 Proposal Number: 001 - 0171-0362 Project: Epoxy Resin Pavement Marking Installation on Non-Interstate Routes. Contractors and Bid Amounts: • Safety Marking Inc. — $488,287 • TMI Services Inc. — $728,070 • Hi-Way Safety Systems Inc. — $900,230 Town/District: Cheshire Proposal Number: 004 - 0025-0138 Project: Safety and drainage improvements on Route 42 at King Road. Contractors and Bid Amounts: • Martin Laviero Contractor Inc. — $817,437 • Spazzarini Construction Company Inc. — $845,995 • King Construction Inc. — $873,278 • Schultz Corporation — $913,188 • RED Technologies LLC — $941,019 • Colonna Masonry Concrete & Asphalt Paving LLC —

NEW ENGLAND EDITION Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Main office

Town/District: District 2 Proposal Number: 002 - 0172-0412 Project: Epoxy resin pavement marking installation on interstate routes. Contractors and Bid Amounts: • Hi-Way Safety Systems Inc. — $609,115 • Safety Marking Inc. — $759,312 • TMI Services Inc. — $845,825

Town/District: District 1 Proposal Number: 005 - 0171-0359 Project: Beam end and bearing repair. Contractors and Bid Amounts: • Odyssey Contracting Corporation — $3,971,880 • Blast All Inc. — $4,215,640 • Abhe & Svoboda Inc. — $4,596,418

Town/District: District 3 Proposal Number: 003 - 0173-0424 Project: Epoxy resin pavement marking installation on Routes I-91 and I-95. Contractors and Bid Amounts: • Safety Marking Inc. — $1,478,816 • Hi-Way Safety Systems Inc. — $1,898,460 • TMI Services Inc. — $2,071,750

Town/District: District 2 Proposal Number: 006 - 0085-0142 Project: Pavement preservation on I-395. Contractors and Bid Amounts: • American Industries Inc. — $10,856,525 • Empire Paving Inc. — $12,411,310 • Tilcon Connecticut Inc. — $12,820,828

For advertising rates: Contact

Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Reckner Pete Sigmund John Pinkerton Tom Weinmann Cathy Printz

470 Maryland Drive Fort Washington, PA 19034

215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910 Web site Editorial e-mail Advertising e-mail

$952,859 • Dayton Construction Company Inc. — $974,757 • VMS Construction Company — $981,931 • NJR Construction LLC — $995,197 • Complete Construction Company — $1,049,628 • Guerrera Construction Company Inc. — $1,067,620 • Empire Paving Inc. — $1,096,611 • Richards Corporation — $1,132,347 • B & W Paving & Landscaping LLC — $1,143,535

www.constructionequipmentguide.com editorial@cegltd.com production@cegltd.com

Edwin M. McKeon Jr.

215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910 e-mail tmckeon@cegltd.com Kent Hogeboom •New York •New England 315/866-1423 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com Contact

Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2013, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.

Town/District: Hartford Proposal Number: 004 - 0063-0679 Project: I-91 pavement preservation. Contractors and Bid Amounts: • Empire Paving Inc. — $3,534,967 • Tilcon Connecticut Inc. — $3,599,162 • Waters Construction Company Inc. — $3,897,643 • American Industries Inc. — $4,272,595 Town/District: Stamford Proposal Number: 006 - 0301-0149 Project: Stamford Transportation Center pedestrian bridge over Washington Boulevard. Contractors and Bid Amounts: • Waters Construction Company Inc. — $2,808,899 • The Brunalli Construction Company — $2,900,421 • NJR Construction LLC — $2,954,240 • Mohawk Northeast Inc. — $3,200,233 • Garsan Construction Inc. — $3,484,113 • New England Infrastructure Inc. — $3,970,875 Town/District: New Haven Proposal Number: 001 - 0092-0640 Project: Intersection improvements on Route 10 at Lamberton Street. Contractors and Bid Amounts: • Laydon Industries, LLC — $545,579 • RED Technologies LLC — $579,339 • Colossale Concrete Inc. — $627,070 • Empire Paving Inc. — $671,887 Town/District: District 2 Proposal Number: 003 - 0172-0413 Project: Epoxy resin pavement marking installation on noninterstate routes. Contractors and Bid Amounts: • TMI Services Inc. — $599,565 • Hi-Way Safety Systems Inc. — $821,405 • Safety Marking Inc. — $847,715


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 9, 2013 • Page 5

A

STRONGCO Company

Chadwick-BaRoss, Inc. 15 Katrina Road • Chelmsford, Massachusetts (800) 804-0775 • (978) 256-9571 Fax: (978) 256-8802 www.chadwick-baross.com • www.cbused.com


Page 6 • October 9, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The N.i.c.e. Company Northeast International Construction Equipment Co., Inc. “Your Newest Source for Quality Equipment”

I Buy Machines

2011 Metso ST620, Only 2200 Hours!, Save Huge Over New! Only $239,000

2009 Cat 315DL, VERY NICE!!, 2200 Hrs, Plumbed $114,000

2009 Cat 336DL, 12’10” Stick, 6000 Hrs $169,000

2008 Cat 305CCR, 1200 hours, nice! $46,500

1999 IR 70DD Roller, only 1000 hours!! $33,500

2008 Doosan DL200 Loader, Only 1000 Hrs! Only $79,000!

2009 Terex TA35’s, 3700 hours, Nice Trucks! $159,000

Now Off 495 in Franklin!!! 76 Grove St., Franklin, MA

508-966-4888 508-966-4887

Call Bryn Smith at:

Fax:

Email: brynsmith@thenicecompany.com

See all of my machines at www.thenicecompany.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 9, 2013 • Page 7

A

Company

DEMOLITION

MATERIAL HANDLING

SALES / RENTALS / LEASES GREAT RENTAL RATES CALL FOR FALL PRICING cbused.com

chadwick-baross.com

160 Elm St. Unit 1 Walpole, MA 02081 (508) 660-7600 Fax: (508) 660-7614

www.lhequip.com

EXCAVATION

CALL TODAY! Dan Rott 978-479-5192 15 KATRINA ROAD CHELMSFORD, MA


Page 8 • October 9, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Vermont... Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison •

‘Green Mountain State’ Highway Projects Let

The Vermont Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Windsor Town: Weathersfield Project Names: Weathersfield Stp 2913(1) and Weathersfield NH 2948(1). Contract ID: 10C228 Location: Beginning at mm 8.120 and extending easterly along Vt. Route 131 a distance of approximately 0.510 mi. to mm 8.630 ending at the intersection of Vt. Route 12 and U.S. Route 5. Vt. Route 12: beginning at mm 0.018 and extending northelry along Vt. Route 12 a distance of 0.376 mi. mm 0.394 ending at the intersection of Vt. Route 12, Vt. Route 131 and U.S. Route 5. Old Vt. Route 12: beginning at approximate mm 0.223 of the Vt. Route 12 alignment at the edge of pavement of Vt. Route 12 and extending northerly 78 feet, then 100 feet westerly to 277 feet easterly. Project: Cold planing, reclaiming and paving of the existing highway, new pavement markings, guardrail and other highway related items. Contractors and Bid Amounts: • Pike Industries Inc. — $5,783,891 • The Lane Construction Corporation — $6,071,170 • Peckham Road Corporation — $6,298,864

County: Addison Town: Addison Project Name: Addison Stp Culv(14). Contract ID: 08B062 Location: Vt. Route 17 approximately 0.4 mi. north from the intersection of Vt. Route 125. Project: Removal of the existing twin reinforced concrete culverts and replacing them with a new reinforced concrete box culvert. Contractors and Bid Amounts: • S. D. Ireland Concrete Construction Corporation — $427,545 • Markowski Excavating Inc. — $479,190 • Cold River Bridges LLC — $494,420 • Austin Construction Inc. — $517,244 • Alpine Construction LLC — $567,820 • Reale Construction Company Inc. — $734,000 • J. Hutchins Inc. — $766,309 • J. P. Sicard Inc. — $847,277 • Parent Construction Inc. — $855,074 • J. A. McDonald Inc. — Irregular

County: Franklin Town: Swanton Project Name: Swanton IM 089-3(70). Contract ID: 12A276 Location: Bridge 97 north and south over recreation path. Bridge 98 north and south over Vt. Route 78 (Exit 21).

Project: Pave and membrane bridges. Contractors and Bid Amounts: • Cold River Bridges LLC — $1,021,756 • J. P. Sicard Inc. — $1,321,568

County: Addison Towns: Salisbury and Middlebury Project Names: Salisbury Wcrs(15)(Re-Ad) and Middlebury Wcrs(16)(Re-Ad). Contract ID: 09G104 Location: Vt. Bridge Nos. 232 and 234. Project: Removal of existing concrete slab superstructure. Installation of new prestressed concrete voided slabs. Repair of substructure concrete at the abutments and piers. Contractors and Bid Amounts: • Engineers Construction Inc. — $1,097,922 • Harrison & Burrowes Bridge Constructors Inc — $1,197,470

Counties: Statewide/Multiple Counties Towns: Bolton and Waterbury Project Name: Bolton-Waterbury Stp 2709(1). Contract ID: 07C172 Location: U.S. Route 2 mm 1.880 and extending easterly along U.S. Route 2 for a distance of 38,671 ft. 7.324 mi. to an ending point 374.40 ft. west from Wallace Street.

Project: Cold planing, reclaiming and other highway items. Contractors and Bid Amounts: • Kubricky Construction Corporation — $6,354,243 • Frank W. Whitcomb Construction Corporation — $6,442,940 • The Gorman Group LLC — $6,694,048 • Pike Industries Inc. — $6,755,805

Counties: Statewide/Multiple Counties Towns: Alburg and Colchester Project Names: Alburgh NH Surf(35) and AlburghColchester Stpsurf(36). Contract ID: 12B320 Location: U.S. Route 2 at mm 0.538 and extending easterly along U.S. Route 2 for a distance of approximately 5.725 miles to mm 6.263. U.S. Route 2 at mm 6.263 and extending easterly along U.S. Route 2 for a distance of 32.740 mi. to the intersection of U.S. Route 7 in Colchester. Project: Surface preparation, cold planing and other highway related items. Contractors and Bid Amounts: • Pike Industries Inc. — $6,643,669 • Frank W. Whitcomb Construction Corporation — $7,680,717 • The Gorman Group LLC — $7,893,893 • Luck Brothers Inc. — $8,972,562


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 9, 2013 • Page 9

Plans Include Four Construction Phases, Six Traffic Stages LONGFELLOW from page 1

Civil Northeast Inc. in East Elmhurst, N.Y., and Consigli Construction Co. in Milford/Boston, Mass., have formed a joint venture team referred to by MassDOT as White-Skanska-Consigli. According to MassDOT Press Secretary, Sara Lavoie, the team is concurrently starting basic construction elements and has completed the overall design. They are completing the inspection of the existing support structures with Phase one of the intricate six stages of reconstruction set for spring of 2014. The project is being completed in four construction phases, with six traffic stages. Lavoie directs curious traffic of a different kind, web traffic, to an eight-minute YouTube video animation, which dissects all six phases, showing how the task will be completed while subway trains weave around the work. The video is posted on the project Web site at www.mass.gov/massdot/longfellowbridge. Phase one will reconstruct the upstream (Boston bound) roadway and sidewalk. Phase two will reconstruct the inbound to Boston MBTA Red Line tracks. Phase three will reconstruct the outbound to Cambridge

tracks and Phase four will reconstruct the downstream (Cambridge bound) roadway and sidewalk. Outbound vehicular traffic to Cambridge is being detoured for the entire project duration. Traffic stage one is in place through September 2014 for reconstruction of the inbound to Boston road deck and sidewalk. During this stage one vehicle lane into Boston, a bicycle lane in each direction on the roadway and two-way pedestrian travel on the existing sidewalk are accommodated. Traffic stage two will be implemented to install the temporary shoo-fly track for the

outbound Red Line train on the outbound road deck. During this stage, pedestrians will continue to use the existing downstream sidewalk. One lane for vehicle travel to Boston and two-way bicycle travel will be accommodated on the new upstream roadway. Traffic stage three shifts the Red Line trains to reconstruct the inbound track. One inbound lane for vehicles and one inbound bicycle lane will share the downstream roadway. Pedestrians will use the existing downstream sidewalk. Outbound bicycles will use the upstream side of the bridge. During traffic stage four the Red Line

trains move to reconstruct the outbound track. Pedestrians will continue to use the downstream sidewalk. One vehicle lane into Boston and two-way bicycle travel are accommodated on the upstream side of the bridge. Traffic stage five shifts the Red Line trains onto the existing alignment to remove the inbound shoo-fly tracks. Two-way bicycle travel is accommodated on the upstream side of the bridge and one vehicle lane into Boston and two-way pedestrian travel are accommodated on the downstream side. Traffic stage six provides two-way bicycle and pedestrian travel and one vehicle lane to Boston on the upstream side to reconstruct the downstream roadway and sidewalk. “Currently, the first phase of the project is to demolish and reconstruct the upstream, Boston bound side of the bridge. The work will begin soon and continue through September 2014. Currently, the contractor is inspecting piers and installing scaffolding,” said Lavoie. The project began with preliminary work in April and will be substantially complete in September 2016. see LONGFELLOW page 10

DISPLAY ADS/ CLASSIFIEDS Classified Rates: 30 Words or Less for $30.00. Each Additional Word is 95¢. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion.

Hydraulic Cranes 8 to 600 Ton

PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 FORESTRY EQUIPMENT

LANDSCAPE EQUIPMENT

Stump Grinders

2001 Easy Lawn L90 Hydroseeder, 900 Gallon Tank, good condition ............$8,000.

2010 Rayco RG1635 Super Jr, Self Propelled, 35HP, great condition, 330 hours ........$10,950. 732-446-7600

HYDRAULIC HAMMERS Hydraulic Breakers ALLIED SALES/RENTALS Eagle Power & Equipment Montgomeryville PA 215/699-587 New Castle DE 302/652-3028 Eagle PA 610/458-7054

Daily & Hourly Services www.astrocrane.com

Fully Insured

800-222-8798

============== DAILYAND AND WEEKLY DAILY WEEKLY EQUIPMENT RENTALS EQUIPMENT RENTALS

CLOSE YOUR JOB SITE CLOSE TOTO YOUR JOB SITE

RENTMACHINES.COM RENTMACHINES.COM

® ® CATERPILLAR CATERPILLAR ® ® GENIE GENIE ® ® CHALLENGER CHALLENGER ® SCREEN MACHINE SCREEN MACHINE®

200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 an issue only $45 an issue only $40 an issue

Call now to reserve your space! 800-225-8448 * pre-payment required


Page 10 • October 9, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ................................................................9 BARRY EQUIPMENT CO..................................................6 CHADWICK BAROSS MA..............................................5,7 CLASSIFIED ......................................................................9 CONTRACTOR’S CORNER ............................................9 FOLEY MARINE & INDUSTRIAL ENGINE ......................1 GORILLA HAMMERS........................................................1 ITL AUCTIONEERING ......................................................1 J R VINAGRO CORPORATION........................................1 KRAFT POWER CORP ....................................................1 LORUSSO HEAVY EQUIPMENT LLC..............................7 LOU GIZA EQUIPMENT....................................................1 MILTON CAT......................................................................9 ROGERS BROTHERS ....................................................11 SUMMIT SUPPLY LLC/MULTI MACHINE ........................1 THE N.I.C.E. COMPANY ..................................................6 THE W I CLARK CO ........................................................2 TYLER EQUIPMENT CO ..............................................3,5 WOODCO MACHINERY ................................................12 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Buses Set to Replace Red Line Trains for 25 Weekends LONGFELLOW from page 9

In order to to save money, MassDOT incorporated an incentive/disincentive clause into the bid specifications to ensure that the project is being completed on schedule. “MassDOT’s contractor is required to maintain emergency response, MBTA Red Line service and bicycle and pedestrian access on the bridge at all times,” said Lavoie. “In order to ensure MBTA service in place, the current traffic management plan has a Cambridge-bound detour in place. The contractor will have one Boston-bound lane on the bridge at all times throughout the six phases of construction.” The bridge will not be widened or lengthened to increase traffic flow. “The bridge length will be unchanged. The width will also remain the same with the exception of a slight increase in width at the upstream Boston abutment, which will be shifted slightly to accommodate the new cross section that improves bicycle and pedestrian travel,” Lavoie said. “The final bridge configuration will safely accommodate all bridge users. “In the final configuration, the upstream sidewalk will increase from 6 feet wide to 8 feet 6 inches. The downstream sidewalk will increase from 10 feet to 13 feet. The upstream side will have a 5-feet 6-inch bike lane and the downstream lane will be 6 feet wide,” said Lavoie. Boston bound traffic volumes during both a.m. and p.m. peak periods are higher than Cambridge bound, according to Lavoie. There will be two Boston bound travel lanes, one Cambridge bound travel lane, bicycle lanes on each side of the bridge, and wider sidewalks on both sides. A list of how much steel, concrete, asphalt, stone, etc. is not yet available, but special marine materials are known, due to reconstruction that will begin below the surface of the Charles River. “There is some granite block cleaning in the ‘splash zone’ being performed by divers operating a 5,000 psi pressure washer as part of the cleaning process in advance of the masonry joint repairs,” said Lavoie. “The joint repairs consist of deteriorated mortar removal and repair material is just ‘Harris Construction Non-Shrink Cement Based Grout,’ injected by a progressive cavity pump into the joints.” Lavoie said that despite the use of manlifts on floating barges in the river, there will be no significant contribution from a major crane company and no floating cranes. STV Incorporated is the design-build enti-

ty’s designer. Jacobs Civil prepared the preliminary design and secured the necessary environmental permits. At least five subcontractors and material suppliers are in place, but Lavoie said she could not release their names at this time, as they have not been officially approved by MassDOT. Besides Accelerated Bridge Program techniques like the Incentive/Disincentive clause, and design/build contract, pre-cast elements to replace all decaying piers and supports have already been made. Environmental challenges have been carefully addressed. “The Charles River is a valuable natural resource, and the bridge is located adjacent to the Esplanade in Boston and Memorial Drive in Cambridge where extensive public parkland exists,” said Lavoie. “The contractor has measures in place to protect water quality in the Charles River and to minimize impacts to parkland.” All plaques and sculptures will be protected during construction and restored as part of the project. The Devil Is in the Detours The project will employ several detour routes for one of Boston’s most heavily traveled areas. The primary Cambridge bound detour uses Charles Street and Storrow Drive to reach Leverett Circle and cross the river via Monsignor O’Brien Highway (Route 28) to access Land Boulevard and First Street and Binney Street for Kendall Square and points west in Cambridge. The alternate route uses Storrow Drive westbound to the Mass Avenue Bridge to reach Main Street via Vassar Street. On weekends, when MBTA buses will replace Red Line trains, Boston bound traffic will use Memorial Drive or Third Street and Binney Street to reach Land Boulevard and Leverett Circle. According to Sara Lavoie, there are 25 weekends over the three and a half year-project when buses will replace Red Line trains to accommodate track work. On these weekends, only MBTA buses can use the bridge. All other vehicle traffic must use alternate routes. Bicyclists and pedestrians may continue to use the bridge in both directions, and access for emergency vehicles will be maintained. All traffic detour maps are available on the project Web site at www.mass.gov/massdot/massdot/longfellowbridge. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 9, 2013 • Page 11

Tyler Equipment

C.N. Wood Co., Inc.

Joseph Equipment Company

251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351

200 Merrimac St. Woburn, MA 01801 (781) 935-1919

300 Gay Street Manchester, NH 03103 603-641-8608

Avon, MA (508) 584-8484

www.josephequipment.com

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848

www.tylerequipment.com

Johnston, RI (401) 942-9191

www.cn-wood.com


Page 12 • October 9, 2013 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

PARTS & service

CUSTOMER SUPPORT AGREEMENTS

REMARKETING

VOLVO FINANCIAL SERVICES

CARETRACK

YOU’VE GOT A LOT OF JOBS TO DO YOU CHOOSE A DEALER WHO SUPPORTS EVERY ONE.

Smart Works. Call Woodco Machinery for the full line of industry-leading Volvo equipment. www.woodcomachinery.com

140 Wales Avenue Avon, MA 02322 508-584-8484

Volvo Construction Equipment

22 North Maple Street Woburn, MA 01801 781-935-3377

60 Shun Pike Johnston, RI 02919 401-942-9191


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.