Ohio 13 2016

Page 1

90 80 6

OHIO STATE EDITION

A Supplement to:

422

6 80 24

6

4

71

76

199 30 30 75

68

30 77

71 23 22 68

4

70 70

®

70

22 71

75

77

27

June 18 2016

22 74

50

50 25

Vol. XVIII • No. 13

35

52

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your Ohio Connection: Ed Bryden, Strongsville, OH • 1-800-810-7640

Shelly & Sands Completes First Year of Four-Year Contract By Irwin Rapoport CEG CORRESPONDENT

Shelly & Sands Inc. has completed the first year of the four-year contract to rebuild and widen a 4mi. (6.4 km) stretch of Interstate 80 in Ohio’s Trumbull County, along with the widening and rehabilitation of seven bridges and replacement of six bridges. The Ohio Department of Transportation project ($91.2 million construction, $102.2 million in total) began in June 2015 and will be completed in July 2018. The work is taking place in Austintown, Weathersfield and Liberty Townships, and within the city of Girard. I-80 is being expanded from four lanes to six between State Route 46 and SR193/Belmont Avenue. “The need is two-fold,” said Mike Simpkins, ODOT’s planning and transportation engineer. “We have several bridges that are in need of rehabilitation and with increasing traffic volumes, there is a need for an additional lane. This is one of the top locations for truck traffic in the state — it’s a major connector between Chicago and New York City. A lot of the exits in the area accommodate semi-truck needs. “The pavement and bridges did meet their expected lifecycles,” he said. “They were built back in the 1950s and 1960s and it was time for a replacement. Because of the funding situation, we actually expedited the design much quicker than normally for a project of this size — from the beginning to the end, it took two years.” The design deals with areas that have poor sub-grades.

Shelly & Sands Inc. has completed the first year of the four-year contract to rebuild and widen a 4mi. (6.4 km) stretch of Interstate 80 in Ohio’s Trumbull County, along with the widening and rehabilitation of seven bridges and replacement of six bridges.

“We actually hit a patch of coal and we have areas that have mines — these are always a challenge to deal with,” said Simpkins. “We have to make sure that the road has the longevity needed to handle trucks, which means having a stabilized sub-grade that has a good foundation to place pavement on.” ODOT is using a traditional road base with an asphalt surface on this job. “We’ve had some success in using fabrics to bridge some of these soft areas,” said Simpkins, “and asphalt is something that is long-term. When you have to do repairs, it is much easier and costeffective than when you have to do it on concrete pavement.” ODOT has been pro-active in securing the work space and access

to replace an 800-ft. (243 m) long bridge that spans two railroad spurs and a junk yard prior to the start of the project. This was needed as space was required to place the bridge piers. “Historically railroads present unique challenges in regards to highway construction,” said Simpkins, “so there was a lot of coordination needed. During the initial reviews I saw that access was going to be very restricted without a plan in place, so we pushed for that to be all pre-bid and pre-designed so that it was simply a bid condition that they contractors had to work with. The access points were arranged. We did not have the time to let the contractor get all these agreements in place. As well, we had some very minor

utility re-locations for some of the noise wall placement.” The expected lifespan for the pavement is 12 to 15 years and 30 to 50 years for the bridge work. The new road infrastructure was designed via a partnership between MS Consultants and the GPD Group. Current access to the highway is being maintained, with no changes to the ramps and exits/entrances. “The only improvement that was made to the corridor was the addition of a through-lane throughout the corridor,” said Simpkins. “The addition of a new lane for traffic will make it safer. The existing shoulders were four-feet wide on the inside and eight-feet wide on the outside, and now we’re putting in 12-foot shoulders on the

inside and outside. People who need to stop will now have a full shoulder to pull off on.” The traffic plan is based on a minimum of one lane of traffic being maintained in each direction of I-80 during non-peak travel times, along with various ramp closures throughout construction. “Access to all residences and businesses will be maintained at all times throughout construction,” said Simpkins. “We’re actually maintaining two lanes in each direction. There are times when we take it down to a single lane for a day to do some work. The approach pavement on both sides of the 800-foot long bridge was realigned so that we could maintain two lanes throughout the construction.” The work completed in 2015 included the widening of the exterior lanes of I-80 eastbound between SR 46 and U.S. 422 and for the current construction season, S&S crews will be widening the interior lanes of I-80 eastbound between SR 46 and U.S. 422, with the Keffler Bridge Company replacing the large bridge over the scrapyard and railroad, just west of U.S. 422. Keffler is responsible for all bridge work. Mike Sdregas, ODOT’s construction project manager, is pleased with the ongoing progress. “The designs for the bridges vary — some are steel beams and some are girders,” he said. “The realignments are wider and we’re using some different materials and new beams. They may include sheer studs with high performance bridge decks. Everything is being brought up to current standards because the existing bridges are see ODOT page 2


Page 2 • June 18, 2016 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide

MS Consultants, GDP Group Partner to Design Infrastructure ODOT from page 1

functionally obsolete.” Dan Kirsh, Shelly & Sands project manager, said that his crews have completed Phase One of the project and have started Phase Two, with plans to initiate Phases Three, Four, and Five later this year. “We’re building a lot of temporary roads on the outside so that we can build the third lane in the median part of the eastbound and when that is completed,” he said, “there are several eastbound ramps to do. The job includes I-680 eastbound and westbound, I11 northbound and southbound, along with I-80, the interchange at Salt Springs Road, the 7/11 collector, and U.S. 422 — these are interstates with ramps. “It’s a $100 million project and it feels like it,” he said. “There is lot of work and we have to be on schedule. We’re a little behind because the good weather we had in the winter led to a lousy spring with lots of snow and rain. It’s a difficult job — there’s a lot of planning in terms of the design, not a lot of room to work in, and it’s one of the heaviest travelled areas north of Columbus. With all the interstates and the turnpike, it’s the heart of the northeast area.” Coordination with ODOT is the key to success and attention to detail. Kirsch explained that four traffic fatalities that occurred in the work zone last year have galvanized everyone to make sure that nothing is left to chance. “We have taken great measures to help out,” he said. “We increased our police protection so that traffic slows down and the police move around to maximize their presence on the work site — people take notice of them. There hasn’t been a fatality since we initiated this and when there is a backup, there is police car following the last car to protect it.” S&S worked throughout the winter with crews removing a lot of concrete, opening up some areas and setting wall in some areas. Some concrete also was put down. “We did a lot of prep work and drilled a lot of 60-inch diameter drill shafts 60 feet into the ground for the big bridges,” said Kirsch. “The shafts go down right into the bedrock so there is very little movement and rifts in the foundations. We milled off the asphalt and broke up the concrete — we move thousands of yards of concrete and when the thaw came, we began to move dirt and went like hell on the sub-grade and undercuts.” Kirsch holds monthly meetings with the subcontractors and coordinates the schedule and work with ODOT. “A lot of times I have to change a few things on the schedule so that we could go back to something later on,” he said. “When you’re building multiple bridges and you

The expected lifespan for the pavement is 12 to 15 years and 30 to 50 years for the bridge work.

have delays in the weather, it’s not easy.” Crews are working mainly during the day, along with night work for certain aspects, and Kirsch plans to work throughout the year as much possible to meet the 2018 deadline. Much of the night work involves setting wall, shifting the work zone or paving a section of road. “ODOT wants two lanes of traffic at all times except from 9 p.m. to 6 p.m. when you can go down to one lane,” he said. “You could have fines for as much as $10,000 an hour for every hour that you didn’t open a lane.” Protecting motorists and construction crews is a priority for Kirsch. “It’s a very dangerous job sometimes when some drivers don’t pay attention,” he said, “especially those of tractor trailers who are flying down the road at 70 to 80 miles an hour and the only thing between you and that semi is a plastic drum.” Shelly & Sands will be removing a large amount of materials from the site — more than 100,000 cu. yds. (76,455 cu m) of reinforced concrete, 5,000 tons (4,535 t) of steel, 750,000 cu. yds. (573,416 cu m) of excavation, and 120,000 tons (108,862 t) of asphalt.

A Kobelco 330 excavator features logos of the Wounded Warrior Project, which helps Iraq and Afghanistan war veterans from the Marines, Army, Air Force and Navy. Some of these excavators have been featured in parades to raise funds for the program and create awareness of the problems facing returning veterans.

Materials being brought in include 70,000 cu. yds. (53,518 cu m) of concrete, 1.5 million lbs. (680,388 kg) of rebar, 10,000-plus tons (9,071 t) of steel, and 200,000 tons (181,436 t) of asphalt. On a daily basis — Monday to Saturday, there could be anywhere between 75 and 125 people on-site, with close to 50 S&S personnel. The principal subcontractors include: Keffler Bridge Company for bridge work; BMG Construction for barrier walls

and concrete work; Lionel Construction for maintenance, traffic concrete work and paving; Lake Erie Construction for signage and guard rail installation; and A&A Safety for traffic control, striping and temporary road signage. City Concrete, City Stone and Sibley Concrete are supplying a lot of the aggregates. While the job site is an hour away from the company’s main yard/shop in Zanesville, see ODOT page 5


Construction Equipment Guide • Ohio State Supplement • www.constructionequipmentguide.com • June 18, 2016 • Page 3

Highway Equipment Company of Ohio 1405 Timken Place SW Canton, OH 44706 330-915-8391 Fax: 330-915-8411 www.highway-equipment.com

Attachments can n make your machine moree valuable. Allied offers a wide assortment of attachments to fit all of your makes and models of excavator, loader/backhoe, mini-excavator, skid-steer or compact track loader machines. Allied has become attached to your machines. Allied’s construction and demolition attachments are productive and dependable. State-of-the-art technology.Full product line. Competitive price and performance. Allied offers innovative, problem-solving capabilities. Commitment to product availability. Superior product support. Strong Distributor network. Most of all Allied meets and exceeds customer performance expectations. To put a high performance Allied attachment on your machine, call us at 1-800-321-1046 or visit AlliedCP.com for the name of a Distributor nearest you. We’ve become attached to your machines.

© 2015 Allied Construction Products, LLC

Highway Equipment Company of Ohio

Highway Equipment Company of Ohio

1405 Timken Place SW • Canton, OH 44706 330-915-8391 • Fax: 330-915-8411 www.highway-equipment.com

1405 Timken Place SW • Canton, OH 44706 330-915-8391 • Fax: 330-915-8411 www.highway-equipment.com


Page 4 • June 18, 2016 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide

GeoShack Conducts Series of Roadshow Events Columbus, Ohio

Justin Buenger (L) of Connie Construction talks to Paul Naylor, GeoShack, about Topcon’s PS Series Robotic Total Station.

G

Steve Hatfield of GeoShack reviews Topcon’s new FC500 field controller with Chris Winkle of Gandee Heydinger Group.

eoShack recently conducted a series of construction technology roadshow events, offering contractors in Michigan and Ohio an up-close look at the latest technologies for the construction, survey, civil engineering and architecture and design industries. The series of events kicked off in Detroit, Mich. followed by two-day events held in Grand Rapids, Mich., before moving to Ohio for events in Columbus and Cleveland. The events featured live equipment demonstrations that included excavators and dozers equipped with Topcon’s 3D machine control systems, an excavator equipped with the iDig wireless 2D system, skid steers equipped with a Futura MCB3 Dual Control box, total stations and a demonstration of the Lockheed Martin Indago Mapper UAV.

Rob Yoakum (L) and Angie Coughlin welcome attendees to the Columbus, Ohio, branch event.

One of the many systems featured at the events was Topcon’s new 3D dozer machine control system — 3DMCMAX. The 3D-MCMAX provides high-accuracy elevation, slope and blade rotation, maximizing speed, control and grading performance. The 3D-MCMAX employs dual IMUs (Inertial Measurement Unit) and a mast-less blade system. The mast-less system offers improved visibility and eliminates daily set up and disassembly demands as required by systems with antennas, cables and masts. At the Michigan locations, Michigan CAT provided Caterpillar machines, AIS Construction Equipment provided John Deere machines and Continental Equipment Company provided Komatsu machines. In Ohio, equipment demonstrations included John Deere machines provided by

Cleveland, Ohio

(L-R): Brad Fisher, Bob Stadvec and Erik Laps, Ohio CAT, join Mike Switzer and Todd Hoover, both of Independence Excavating Inc., and Phil Kuhar of Ohio CAT to review this Cat D6N dozer equipped with 3D Max.

In Columbus, Ohio, Nick Baker (L) of GeoShack speaks with Dwight Tillis of P&L Systems about this John Deere 850K equipped with a Topcon 3DMC2 system.

Murphy Tractor and Case Equipment provided by Southeastern Equipment Co. Headquartered in Dallas, Texas, GeoShack North America Inc. provides sales, service and rentals of GPS, lasers, survey equipment, machine control systems for the construction, survey, engineering and agricultural markets. Formed when several independently owned distributors merged, the company continues to grow and currently operates retail locations in Arkansas, Colorado, Louisiana, Michigan, New Mexico, Ohio, Oklahoma and Texas, and also operates locations in Ontario and Quebec, Canada. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG

At the Cleveland event, Topcon’s Eric Ivers provides an overview of the company and insights into the latest technologies.

(L-R): Steve Hatfield, Nick Baker, and Paul Naylor, all of GeoShack, present Topcon’s DS Series Robotic Total Station.

(L-R): Dave Russell, Chris Mears and Greg Fausel, all of Murphy Tractor and Equipment, present a John Deere 850K dozer equipped with Topcon’s 3DMC2 system to attendees.

Chris Morgan (L) of Southeast Equipment Company talks with Kirk Scheid of Sheid Enterprises about this Case excavator equipped with the UBEXi iDig wireless bucket position indicator.


Construction Equipment Guide • Ohio State Supplement • www.constructionequipmentguide.com • June 18, 2016 • Page 5

For All Of Your Air Compressor Needs Specializing in High Pressure Air 200psi to 500psi SIX LOCATIONS TO SERVE YOU Headquarters Location: 901 Callendar Blvd Painesville, Ohio 44077 440-357-0800

Cincinnati Branch: 9400 Le Saint Drive Fairfield, Ohio 45014 513-942-1488

Cleveland Branch: 9050 Bank Street Valley View, Ohio 44125 216-901-9200

Columbus Branch: 8200 B Memorial Drive Plain City, Ohio 43064 614-733-0777

Indianapolis Branch: 6302 S. Belmont Avenue Indianapolis, IN 46217 317-381-6865

Nashville Branch: 104 LaSalle Court LaVergne, TN 37133 615-630-2668

www.airequipmentrental.com

RENTAL • SERVICE • SALES

Contractor Makes Safety of Motorists, Crews a Priority ODOT from page 2

Kirsch in addition to renting a temporary office for the project, also has rented a large temporary shop for repairs that has two 18ft. (5.4 m) doors and an overhead crane to help lift heavy equipment. There also are some on-site mechanics. “I learned my lessons from other multimillion jobs,� he said. “If you make it easier for someone to do something, it gets done quicker — you don’t want equipment to be down for a long period of time. We’re running equipment six days a week and sometimes seven. I keep a lot of equipment in the shop, including GPS equipment. We have several GPS-run pieces of equipment — a grader and four dozers. GPS helps tremendously with the job. We have a staff of surveyors that download ODOT specifications into GPS software.� On this project Shelly & Sands is using Cat and John Deere dozers; Cat and Case backhoes; Kobelco, Komatsu and Cat excavators; a 16 G Cat grader; two Komatsu loaders; Volvo 40-ton (36 t) rock trucks; Ingersoll Rand and Galion rollers; Vermeer

underdrain equipment; Blaw Knox and Cat pavers. Keffler is using a 120-ton (108 t) Manitowoc crane, along with Grove 60-ton (54 t) cranes. Shelly & Sands often purchases and rents equipment and vehicles from Columbus Equipment and Southeastern Equipment. A Kobelco 330 excavator features logos of the Wounded Warrior project, which helps Iraq and Afghanistan war veterans from the Marines, Army, Air Force and Navy. Some of these excavators have been featured in parades to raise funds for the program and create awareness of the problems facing returning veterans.“I’ve had the honor of having it on this project,� said Kirsch. “Many of the operators are veterans and feel privileged to operate this piece of equipment. The Wounded Warrior project is an initiative that we support and we’ve collected money to help support the project.� (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG

New H Texas ouston, openi Location ng in July

Ready y. Set. Save on o Kubota’s SSV Series Skid Steer Loader s.

$

0 Down, 0% Financing for 60 6 Months

*

A.P P.R.

Offfer ends 6/30/16.

47117 St. Rt. 18 Wellington, OH 44090

440-647-2015 www.krystowskitractor.com

GRZQ $ 3 5 ÂżQDQFLQJ IRRU XS WR PRQWKV RQ SXUFKDVHV RI QHZ .XERWD 669 6HULHV (TXLSPHQW LV DYDLODEOH WR TXDOLÂżHG SXUFKDVHUV IURP SDUWLFLSDWLQJ GHDOHUVÂś LQ VWRFN LQYHQWRU\ WKURXJK ([DPSOH $ PRQWK PRQWKO\ LQVWDOOPHQW UHSD\PHQW WHUP DW $ 3 5 UHTXLUHV SD\PHQWV RI SHU ÂżQDQFHG $ 3 5 LQWHUHVW LV DYDLODEOH WR FXVWRPHUV LI QR GHDOHU GRFXPHQWDWLRQ SUHSDUDWLRQ IHH LV FKDUJHG 'HDOHU FKDUJH IRU GRFXPHQW SUHSDUDWLRQ IHH VKDOO EH LQ DFFRUGDQFH ZLWK VWDWH ODZV ,QFOXVLRQ RI LQHOLJLEOH HTXLSPHQW PD\ UHVXOW LQ D KLJKHU EOHQGHG $ 3 5 $ 3 5 DQG ORZ UDWH ÂżQDQFLQJ PD\ QRW EH DYDLODEOH ZLWK FXVWRPHU LQVWDQW UHEDWH RIIHUV )LQDQFLQJ LV DYDLODEOH WKURXJK .XERWD &UHGLW &RUSRUDWLRQ 8 6 $ 'HO $PR %OYG 7RUUDQFH &$ VXEMHFW WR FUHGLW DSSURYDO 6RPH H[FHSWLRQV DSSO\ 2IIHU H[SLUHV 6HH XV IRU GHWDLOV RQ WKHVH DQG RWKHU ORZ UDWH RSWLRQV RU JR WR ZZZ NXERWD FRP IRRU PRUH LQIRRUPDWLRQ 2SWLRQDO HTXLSPHQW PD\ EH VKRZQ

kubota.com

Š Kubota Trractor Corporation, 2016


Page 6 • June 18, 2016 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide


Construction Equipment Guide • Ohio State Supplement • www.constructionequipmentguide.com • June 18, 2016 • Page 7


Page 8 • June 18, 2016 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide

Wood • Hamilton • Stark • Henry • Greene • Knox • Franklin • Clermont • Crawford • Union • Cuyahoga • Brown • Licking • Medina •Ohio.. Williams • Harrison • Adams • Mercer • Butler • Clark • Ashtabula • Sandusky • Portage • Athens • Logan • Lake • Erie • Wyandot • Warren • Fairfield • Miami • Paulding • Darke • Muskingum • Ottawa • Holmes • Jefferson • Trumbull • Summit • Washington • Van Vert • Licking • Wood • Hamilton • Stark • Henry • Greene • Knox • Franklin • Clermont • Crawford • Union • Cuyahoga • Brown • Licking • Medina • Williams • Harrison • Adams • Mercer • Butler • Clark • Ashtabula • Sandusky • Portage • Athens • Logan • Lake

‘Buckeye State’ Highway Lettings

The Ohio State Department of Transportation received bids for transportation-related improvement projects. The following is a list of some of the projects let. Project No: 150557 Type: Two lane resurfacing. Location: ASD-SR 89-12.03. State Estimate: $1,548,000 Contractors and Bid Amounts: • Kokosing Construction Company Inc., Columbus, Ohio — $1,204,382 • Shelly & Sands Inc., Columbus, Ohio — $1,218,000 • Karvo Paving Company, Stow, Ohio — $1,397,433 • Melway Paving Company Inc., Holmesville, Ohio — $1,470,449 Completion Date: Sept. 30, 2016 Project No: 150561 Type: Two lane resurfacing. Location: CLE-SR 133-20.28. State Estimate: $1,580,000 Contractors and Bid Amounts: • John R Jurgensen Company, Cincinnati, Ohio — $1,452,292 • Barrett Paving Materials Inc., Middletown, Ohio — $1,553,777 Completion Date: Nov. 1, 2016 Project No: 150562 Type: Bridge repair. Location: COL-SR 11-19.95. State Estimate: $3,125,000 Contractors and Bid Amounts: • A P O’horo Company, Youngstown, Ohio — $2,764,000 • Marucci & Gaffney Excavating Company, Youngstown, Ohio — $2,981,213 • Shelly & Sands Inc., Columbus, Ohio — $3,069,465 • J D Williamson Construction Company Inc., Tallmadge, Ohio — $3,433,993 • Great Lakes Construction Company, Hinckley, Ohio — $3,712,640 Completion Date: Oct. 15, 2016 Project No: 150563 Type: Bridge repair. Location: HAM-IR 71-17.17. State Estimate: $1,193,000 Contractors and Bid Amounts: • Complete General Construction Company, Columbus, Ohio — $1,276,368 • Shelly & Sands Inc., Columbus, Ohio — $1,355,833 • Great Lakes Construction Company, Hinckley, Ohio — $1,453,265 • Eagle Bridge Company, Sidney, Ohio — $1,513,650 • Prus Construction Company, Cincinnati, Ohio — $1,594,448 • Sunesis Construction Company, West Chester, Ohio — $1,868,092 Completion Date: Sept. 30, 2016

Project No: 150569 Type: Intersection. Location: PER-SR 13-32.39. State Estimate: $1,214,000 Contractors and Bid Amounts: • Shelly Company, Thornville, Ohio — $1,249,479 • Shelly & Sands Inc., Columbus, Ohio — $1,338,025 • Foill Inc., Waverly, Ohio — $1,411,736 Completion Date: Oct. 1, 2016 Project No: 150571 Type: Four lane resurfacing. Location: RIC-SR 13-04.60. State Estimate: $3,751,000 Contractors and Bid Amounts: • Kokosing Construction Company Inc., Columbus, Ohio — $3,671,500 • Shelly & Sands Inc., Columbus, Ohio — $4,145,639 • Karvo Paving Company, Stow, Ohio — $4,316,089 Completion Date: Sept. 30, 2016 Project No: 150572 Type: Four lane resurfacing. Location: ROS-SR 159-1.22 State Estimate: $1,486,000 Contractors and Bid Amounts: • Shelly Company, Thornville, Ohio — $1,514,443 • Shelly & Sands Inc., Columbus, Ohio — $1,519,149 Completion Date: June 30, 2016 Project No: 150574

Type: Bridge repair. Location: SUM-SR 303-10.27 State Estimate: $1,392,000 Contractors and Bid Amounts: • Bog Construction Inc., Berlin Center, Ohio — $1,156,254 • J D Williamson Construction Company Inc., Tallmadge, Ohio — $1,316,613 • Shelly & Sands Inc., Columbus, Ohio — $1,369,453 • Ruhlin Company, Sharon Center, Ohio — $1,387,925 • Marucci & Gaffney Excavating Company, Youngstown, Ohio — $1,414,489 • Black Horse Bridge Construction Inc., Norton, Ohio — $1,425,983 • Mosser Construction Inc., Fremont, Ohio — $1,628,472 • Great Lakes Construction Company, Hinckley, Ohio — $1,808,271 Completion Date: Aug. 31, 2016 Project No: 153048 Type: Bridge replacement (two bridges). Location: JAC-DICKA/HUR-0.23/0.62 (Part 1 and Part 2). State Estimate: $1,020,000 Contractors and Bid Amounts: • Shelly & Sands Inc., Columbus, Ohio — $1,128,002 • Righter Company Inc., Columbus, Ohio — $1,163,000 • Complete General Construction Company, Columbus, Ohio — $1,326,224 Completion Date: Sept. 30, 2016


Construction Equipment Guide • Ohio State Supplement • www.constructionequipmentguide.com • June 18, 2016 • Page 9

To See More Machines, Please visit us online at www.bobcat-ent.com Call Brad Kent at 513-266-7761 or on our USED EQUIPMENT HOTLINE: 888.BOBCATS

2014 S650 Bobcat Loader, 1675 Hrs, Cab Heat & Air, Power 2014 S750 Bobcat Loader, Only 200 Hrs, Open ROPS, Cab 2012 3400 Bobcat Utility Vehicle, 1100 Hrs, Open ROPS, 4WD, Diesel Engine, CN 81596........................................$9,900 Quick Tatch, CN 91813 ..................................................$37,500 New Tires, CN 99481 ......................................................$44,000

2007 T250 Bobcat Track Loader, 1900 Hrs, Cab Heat & Air, Power Quick Tach, Joysticks, CN 98255......................$32,500

2013 T750 Bobcat Track Loader, 2620 Hrs, Cab Heat & Air, 2012 DL220 Doosan Wheel Loader, 600 Hrs, CN 84785 .......... 2014 DA30 Doosan Articulated Truck, 500 Hrs, CN 90330...... Roller Suspension, CN 96623 ......................................$44,000 ........................................................................................$123,500 ........................................................................................$328,800

2014 DX420LC-3 Doosan Excavator, 850 Hrs, CN 90363 ........ ........................................................................................$258,880

PRE-OWNED, JOB READY EQUIPMENT NOW AVAILABLE! Parts • Sales • Service • Rental • Training Cincinnati • Mt. Orab • Hilliard • Reynoldsburg • Lexington • Louisville

3 ! , % 3 s 2 % . 4 ! , 3 s 0 ! 2 4 3 s 3 % 2 6 ) # %

DRILL ILL RIGS FOR RENT 1.800.PILE.USA -or- www.ecanet.com PITTSBURGH PO Box 306 Coraopolis, PA 15108 P 412.264.4480 F 412.264.1158

PHILADELPHIA PO Box 387 Aldan, PA 19018 P 610.626.2200 F 610.626.2245

WASHINGTON, D.C. 6300 Foxley Road Upper Marlboro, MD 20772 P 301.599.1300 F 301.599.1597

TORONTO 166 Bentworth Ave Toronto, Ontario M6A 1P7 P 416.787.4259 F 416.787.4362

EQUIPMENT CORPORATION OF AMERICA B U I L D I N G F O U N DATI O N S S I N C E 1 91 8

AUTHORIZED DEALER:

PITTSBURGH

PHILADELPHIA

WASHINGTON

D.C.

TORONTO


Page 10 • June 18, 2016 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide

Firm Announces Relocation of Its Hyundai Expands Columbus Operations to New Branch With Addition of Four New Dealers

Columbus Equipment Company announced the relocation of its Columbus operations to a new facility at 2329 Performance Way in Columbus. The expanded, one-stop location will continue to serve construction, paving, mining, aggregate, lifting and forestry equipment customers with a larger inventory, more extensive rental fleet and improved service capacity to handle increased demand on parts and service.

Columbus Equipment Company has served the state of Ohio since 1952. Headquartered in Columbus, Ohio, the company has ten locations throughout the state. For more information, visit www.columbusequipment.com. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Hyundai Construction Equipment Americas announced the expansion of its North American authorized dealer network with the addition of four dealerships, including three in the United States and one in Canada. With the addition of these new dealerships, Hyundai’s North American network now includes 71 dealerships operating in more than 125 locations, offering sales, service and parts for the full line of Hyundai excavators, wheel loaders, compaction rollers and other construction equipment. Joining the Hyundai authorized dealer network are EquipmentShare, serving northern and eastern Missouri from its location in Columbia, Mo.; RECO Equipment Inc., headquartered in Belmont, Ohio, and serving Ohio, Indiana, eastern Kentucky and eastern Tennessee from multiple locations; OSC Manufacturing & Equipment Services Inc., serving western New York state from its location in Buffalo; and Bobcat of Ottawa, serving eastern Ontario from its location in Ottawa. “The addition to our authorized dealer network of established, successful dealerships in the United States and Canada continues strengthening our ability to meet the needs of construction equipment customers across North America, and testifies to the value of the Hyundai Construction Equipment brand,” said Stan Park, manager, strategic distribution, Hyundai Construction Equipment Americas. For more information, call 877/509-2254 or visit www.hceamericas.com. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

HUDSON 6681 Chittenden Road Hudson, OH 44236 P-330-655-5900 F-330-655-5969

www.themcleancompany.com

COLUMBUS 3155 E 17th Avenue Columbus, OH 43219 P-614-475-2880 F-614-475-0069

CINCINNATI 8131 Regal Lane West Chester, OH 45069 P-513-777-5556 F-513-777-4494


Construction Equipment Guide • Ohio State Supplement • www.constructionequipmentguide.com • June 18, 2016 • Page 11


Page 12 • June 18, 2016 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide

PRODUCT SUPPORT

Meet Mr. Drone ... Columbus Field Technician Columbus Equipment Equipment Company’s Company’s SSenior enior F ield T echnician Darrell 17-year veteran who doesn’t Darrell Drone Drone is a 1 7 - ye a r v e t e ra n w ho do esn’t sspend pend much valuable asset heavy much time twiddling twiddling his his thumbs. thumbs. A v aluable a sset iin n the he avy keenly aware off a cus customer’s equipment support and k eenly a ware o tomer’s e qui pme nt su pport needs.. Mos Mostt iimportantly, he’s when you need him. m. needs mportantly, h e’s tthere here w hen y ou n eed hi Founded 1952, Columbus Equipment Company hass F ounded iin n 19 52, Co lumbus E quipment C ompany ha been dedicated product support, and be en d edicated tto o iinvestment nvestment iin np roduct su pport, a nd keeping your downtime down, forr o over years. This ver ssixty ixty y ears. T his ke eping y our d owntime d own, fo single-minded company ed to tthe he c ompany si ngle-minded ccommitment ommitment has lled being number by customers mers rregionally egionally iin n be ing rranked anked n umber one b y custo

diagnosing equipment, response epairing eq uipment, sservice ervice re sponse d iagnosing and rrepairing standing behind itss equ equipment. ttime ime and st anding be hind it ipment. Don’t worry, Don ’t w orry, Darrell Darr is not alone. Chris, Aaron, Dale, T im, Scott, “Zubba”, Monty … in fact, a Tim any ny one of the company’s technicians chnicians are right there with him. compa ny’s nearly 80 te it’s emergency cy situation or to take advanadvanWhether it ’s for an emergen Preventive ventive Maintenance Program, Program, call tage of our popular Pre your Company ny branch branch today today y our local Columbus Equipment Compa your operation. … and bring peace of mind to y our ope ration.

Toledo Cincinnati Richfield Columbus Cadiz (614) 443-6541 (419) 872-7101 (513) 771-3922 (330) 659-6681 (740) 942-8871 Massillon Zanesville Dayton (937) 879-3154 (330) 833-2420 (740) 455-4036

Ohio’s Dependable Dealer

Painesville Piketon (440) 352-0452 (740) 289-3757

www.columbusequipment.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.