02/05/2014
Tamaulipas Energy Power
GUIDING AXLE
TAMAULIPAS STATE DEVELOPMENT PLAN 2011-2016
THE SAFETY TAMAULIPAS
PLANNED DEVELOPMENT OF CITIES
THE HUMAN TAMAULIPAS
QUALITY PUBLIC SERVICES
THE COMPETITIVE TAMAULIPAS
SUSTAINABLE WATER MANAGEMENT
THE SUTENTABLE TAMAULIPAS
ENVIRONMENTAL Y SUSTAINABLE DEVELOPMENT
1
02/05/2014
Sustainable Tamaulipas Objective: Modernize patterns of energy use with low窶進mpact schemes and clean energy generation for productive, industrial and domestic sectors.
Strategy: Promote alternative production energy sources, effective and sustainable, economic, social and environmentally
Energetic Potential 27 PROJECTS IN DEVELOPMENT CAPACITY 2,706.20 MW
EOLIC GENERATION POTENTIAL: 21 GW TAMAULIPAS ETHANOL NORTH PLANT POTENTIAL: 200 MILLION LTS PER YEAR
SOLAR RADIATION 4.8 kWH/m2
ENERGY PRODUCTION FROM URBAN WASTES 59.1 MILLIONS KWH PER YEAR
CFE 2ND PLACE IN NATIONAL PRODUCTION ENERGY 32,958,569 MW/HR, 12.65% NATIONAL PRODUCTION ENERGY
CONVENTIONAL COAST DEEP WATER POTENTIAL: 10 BILLIONS BARIELS
PEMEX 1ST NATIONAL PLACE NON ASSOCIATE GAS (37.28 %)
REFINING 117,500 BARIELS PER DAY 10.1% NATIONAL
4TH PLACE IN ASSOCIATED GAS PRODUCTION 74.51 MILLIONS CUBIC FEET PER DAY SABINAS SHALE GAS BASIN IN NUEVO LAREDO & TAMPICOMISANTLA, EXPLORATION WORKS
2
02/05/2014
Strategic Location U.S.A 900 km
TEXAS
600 km
Roads 13,803 km / 8,577 miles
300 km
Railroads 936.7 km / 582 miles International Airports 5
Monterrey Saltillo Durango Mazatlรกn SLP
Water Ports 2
Aguascalientes
1 (project)
Guadalajara
Silao
International Crossing Borders 17
Toluca
Puebla
Lรกzaro Cรกrdenas
Strategic Bonded Areas 2 2 (project)
INFRASTRUCTURE
3
02/05/2014
Infrastructure Natural Gas & Oil • Processing Plants. •
4 Cryogenic Plants
Burgos Basin
• Pipelines
1,363 km (848 miles).
• Oil Duct & Polyduct
FALCÓN
481 km (299 miles).
3.3 mmbtu/dí a
• Instalaciones Refinery Storage and Distrubution Terminal Collection Station Pumping Station Marine Terminal Coast
Infrastructure Wind Power • 11 Energy Plants. •
•
Actual Generation (Capacity): 5,776 MW
FALCON
12.65 % Nacional Production (2012) RÍO BRAVO I,II,III, IV y V
Central Station.
Power Lines.
ALTAMIRA I,II,III, IV y V
4
02/05/2014
ENERGETIC POTENTIAL
Wind Power Map NUEVO LAREDO
Tamaulipas estimated potential: 21 GW GUERRERO
Wind Power @ 80m (262.5 ft) MIER
CAMARGO
MIGUEL ALEMAN
GUSTAVO DIAZ ORDAZ
RIO BRAVO REYNOSA
MATAMOROS VALLE HERMOSO
MENDEZ
BURGOS
SAN FERNANDO
SAN NICOLAS
CRUILLAS
MAINERO VILLAGRAN
SAN CARLOS
JIMENEZ HIDALGO ABASOLO PADILLA
GÜEMEZ
VICTORIA MIQUIHUANA
SOTO LA MARINA CASAS
Source: Instituto de Investigaciones Eléctricas, IIE Estadística Nacional anual de velocidad del viento a 80 m de altura
JAUMAVE
BUSTAMANTE
PALMILLAS
LLERA
XICOTENCATL TULA
ALDAMA
GOMEZ FARIAS OCAMPO GONZALEZ
Fuente: Secretaría de Energía , SENER. ANTIGUO MORELOS NUEVO MORELOS
ALTAMIRA EL MANTE
CIUDAD MADERO TAMPICO
5
02/05/2014
Solar Potential Map
Source: Instituto de Investigaciones Eléctricas, IIE Estadística Nacional anual de irradiación solar
Oil Potential Map The exploration and exploitation of the project “Cinturón Pegado Perdido" in deep waters off Tamaulipas coasts represent significant proven oil reserves of the country. According to the National Hydrocarbons Commission, the drilling of 47 exploratory wells is expected.
State Surface: 80,249 km2 (49,875 sq mi) Oil Potential: 59%
6
02/05/2014
PROJECTS IN DEVELOPMENT
Wind Power Projects in Development No.
Empresa
Capacidad (MW)
1
Parque Eólico de Fenicias, S.A. de C.V.
137.5
2
Energías Limpias de Ixtaltepec S. de R.L. de C.V.
140.25
3
ENERGEO - Los Molinos S.A.P.I. de C.V.
140.25
4
Parque Eólico Intavan México Reynosa I, S.A. de C.V.
60
5
Parque Eólico Intavan México Reynosa II, S.A. de C.V.
60
6
Parque Eólico Intavan México Reynosa III, S.A. de C.V.
57
7
Parque Eólico Intavan México Reynosa IV, S.A. de C.V.
57
8
Parque Eólico Intavan México Reynosa V, S.A. de C.V.
87.75
9
Energía Renovable del Itsmo II, S.A. de C.V.
137.5
10
Frontera Renovable S. de R.L. de C.V.
11
DELARO S. de R. L. de C.V.
96.25
12
Compañía Eoloeléctrica de Matamoros S.A. de C.V.
68.75
13
Compañía Eólica Río Bravo, S.A. de C.V.
66
14
Compañía Eólica de Reynosa, S.A. de C.V.
66
15
Compañía Eólica el Palmar, S.A. de C.V.
60
16
Compañía Eólica el Cielo, S.A. de C.V.
60
17
Compañía Eólica Casas, S.A. de C.V.
18
Compañía Eólica de Tamaulipas, S.A. de C.V.
54
19
Compañía Eólica de Ciudad Victoria, S.A. de C.V.
50
20
Compañía Eólica La Mesa, S.A. de C.V.
28
21
Compañía Eólica, San Andrés, S.A. de C.V.
26
22
Compañía Eólica Vicente Guerrero, S.A. de C.V.
60
23
Compañía Eólica Praxedis, S.A. de C.V.
24
Compañía Eólica Tres Mesas, S. de R.L. de C.V.
275
27 PROJECTS CAPACITY 2,706.20 MW
97.25
58 62.7
25
Grupo Soluciones en Energías Renovables Soe de Mexico
161
26
Compañía Eoloeléctrica de Matamoros, S.A. de C.V.
200
27
Compañía Eólica de Tamaulipas, S.A. de C.V.
340
TOTAL
2,706.20 MW
7
02/05/2014
Energy Production Projects Nombre
Descripción
Biofuels Production (Tamaulipas North Tamaulipas is the largest sorghum producer in Ethanol Plant) Mexico, which consideres a potential production of 200 million liters per year (53 million galons per year).
Urban Solid Waste (USW), Energy Source
In the Zona Conurbada Sur 693 tons of USW, for which CFE has a draft plant with an incineration capacity of 209.255 metric tonnes of USW/year to generate 59.1 million kWh per year.
Wind Power Plant “El Porvenir” DATASHEET
CAPACITY GENERATION TURBINES
FIRST STAGE
SECOND STAGE
THIRD STAGE
TOTAL
54 MW
40 MW
32 MW
126
30
20
13
63
EQUIPMENT
MARCA VESTAS MODELO V ‐100 1.8 MW
SURFACE
900 HA
LOCATION
EJIDO EL PORVENIR, MUNICIPIO DE REYNOSA
COMPANY
COMPAÑÍA EÓLICA DE TAMAULIPAS S.A DE C.V.
CONSUMER PARTNER FIRST STAGE
GRUPO SORIANA
INVERSIÓN 1ª ETAPA
126 MILLION USD
TOTAL ESTIMATED INVESTMENT
264.6 MILLION USD
FIRST STAGE FINANCING INSTITUTIONS
NADBank & BANORTE
8
02/05/2014
Wind Power Demostrative Project
CHALLENGES & OPPORTUNITIES
ďƒź Tamaulipas has an estimated wind power potential of 21,000 MW. ďƒź Areas with abundant oil resources coincide with the feasible areas of renewable energy development which represents an opportunity for energy synergy.
9
02/05/2014
CHALLENGES & OPPORTUNITIES
Tamaulipas is called to be a Pilot State to demonstrate the harmonious development between oil resources and renewable energy to become the engine that moves to México.
SUSTAINABLE TAMAULIPAS
10
02/05/2014
Ing. RenĂŠ Salinas TreviĂąo Environmental and Urban Development Ministry Secretario de Desarrollo Urbano y Medio Ambiente
11