TIME LINE


3/6/13

12/18/13

1/15/14

2/19/14

3/1/14

4/7/14

6/4/14

6/19/14

Commission Approves City Hall South City Hall South Construction Project Contract with S&A Demo Staff Relocated Manager Starts City Hall Condition S&A Holds MC City - CRA Land Program & Design Report & Alternatives Presented Community Forum Transfer Presented


7/24/14

9/3/14

10/3/14

12/18/14

3/2/15

4/1/15

Commission Approves Commission Reaffirms Commission Approves 600 Car Garage MC Building – Size & MC Financing Plan S&A Submits Design Location S&A Approved to S&A Submits Development Drawings Start PH2 Design Schematic Design


7/1/15

Start Contractor Selection Process

9/1/15 Municipal Complex Ground Breaking

9/1/15

Early Sitework Starts

10/1/15 100% Construction Drawings Due

11/15/15

All Approvals Obtained

Spring 2017 Construction Complete


BY RON STEIN – Construction Project Manager

CURRENT STATUS


Current Status • • • • • •

Design Development drawings for the building are complete Design Development drawings for the Garage and Site are in progress Design for 94th Ave water & sewer is underway Design for canal relocation is underway Construction Drawings for City Hall are underway The Architect is planning to make the first DRC submission in Mid-May


BY RON STEIN – Construction Project Manager

FLOOR PLAN OVERVIEW







BY ELIZABETH TASCHEREAU – Community Redevelopment Agency Administrator

DOWNTOWN – CURRENT ACTIVITIES & FUTURE PLANS


Downtown Projects

• New Municipal Complex • Art Walk • Corner Stone Redevelopment • Financial Plaza • Broward Health Coral Springs SAMPLE ROAD

SAMPLE ROAD

NW 32ND Court

ART WALK NW 31st Court Corner Stone Redevelopment Project

UNIVERSITY DRIVE

Coral Springs Financial Plaza

Private Development

CORAL HILLS DR.

94TH AVE.

Sample Road


MUNICIPAL COMPLEX $28-32M / Approx. 70,000 sq. ft. Facility 600 Space Downtown Parking Garage Building Construction Dec. 2015 CO Summer 2017


PRIVATE DOWNTOWN DEVELOPMENT 72,000 Retail, Entertainment/120 Room Hotel

Private Development

University Drive

Sample Road


Downtown “Art Walk” Projects


Downtown “Art Walk” Projects – Fall 2015  1300 LF of Walk  300 LF Seating Wall  52 Tent Capacity  6 Art Sculpture Locations “Beyond”, Zachary Knudson


Private Downtown Development Cornerstone Project in Development


DOWNTOWN PATHWAYS – CONNECTION to Sports Fields & Museum / Performing Arts


Future Downtown Core Projects • NW 94 Avenue water line installation • Repave NW 94 Avenue

• Street light replacement on Sample Road

• Water/Sewer line installation Sample Road • Lift station for Municipal Complex

• Draft and adopt the zoning district

• Complete the shared parking study


BY JENNIFER K. BRAMLEY – Deputy City Manager

QUESTIONS?



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.