MUNICIPAL COMPLEX EMPLOYEE OPEN HOUSE
April 28, 2015
BY JENNIFER K. BRAMLEY – Deputy City Manager
TIME LINE
3/6/13
12/18/13
1/15/14
2/19/14
3/1/14
4/7/14
6/4/14
6/19/14
Commission Approves City Hall South City Hall South Construction Project Contract with S&A Demo Staff Relocated Manager Starts City Hall Condition S&A Holds MC City - CRA Land Program & Design Report & Alternatives Presented Community Forum Transfer Presented
7/24/14
9/3/14
10/3/14
12/18/14
3/2/15
4/1/15
Commission Approves Commission Reaffirms Commission Approves 600 Car Garage MC Building – Size & MC Financing Plan S&A Submits Design Location S&A Approved to S&A Submits Development Drawings Start PH2 Design Schematic Design
7/1/15
Start Contractor Selection Process
9/1/15 Municipal Complex Ground Breaking
9/1/15
Early Sitework Starts
10/1/15 100% Construction Drawings Due
11/15/15
All Approvals Obtained
Spring 2017 Construction Complete
BY RON STEIN – Construction Project Manager
CURRENT STATUS
Current Status • • • • • •
Design Development drawings for the building are complete Design Development drawings for the Garage and Site are in progress Design for 94th Ave water & sewer is underway Design for canal relocation is underway Construction Drawings for City Hall are underway The Architect is planning to make the first DRC submission in Mid-May
BY RON STEIN – Construction Project Manager
FLOOR PLAN OVERVIEW
BY ELIZABETH TASCHEREAU – Community Redevelopment Agency Administrator
DOWNTOWN – CURRENT ACTIVITIES & FUTURE PLANS
Downtown Projects
• New Municipal Complex • Art Walk • Corner Stone Redevelopment • Financial Plaza • Broward Health Coral Springs SAMPLE ROAD
SAMPLE ROAD
NW 32ND Court
ART WALK NW 31st Court Corner Stone Redevelopment Project
UNIVERSITY DRIVE
Coral Springs Financial Plaza
Private Development
CORAL HILLS DR.
94TH AVE.
Sample Road
MUNICIPAL COMPLEX $28-32M / Approx. 70,000 sq. ft. Facility 600 Space Downtown Parking Garage Building Construction Dec. 2015 CO Summer 2017
PRIVATE DOWNTOWN DEVELOPMENT 72,000 Retail, Entertainment/120 Room Hotel
Private Development
University Drive
Sample Road
Downtown “Art Walk” Projects
Downtown “Art Walk” Projects – Fall 2015 1300 LF of Walk 300 LF Seating Wall 52 Tent Capacity 6 Art Sculpture Locations “Beyond”, Zachary Knudson
Private Downtown Development Cornerstone Project in Development
DOWNTOWN PATHWAYS – CONNECTION to Sports Fields & Museum / Performing Arts
Future Downtown Core Projects • NW 94 Avenue water line installation • Repave NW 94 Avenue
• Street light replacement on Sample Road
• Water/Sewer line installation Sample Road • Lift station for Municipal Complex
• Draft and adopt the zoning district
• Complete the shared parking study
BY JENNIFER K. BRAMLEY – Deputy City Manager