On behalf of the developer, we provide you with the latest images and information from the Aura construction site.

taken place below: • Site fully secured and hoarded • Contractor site set-up is complete • Reduced level excavations / rock break out to Phase 1 + 2 complete • Phase 1 foundations complete, lift base and retaining walls ongoing • Phase 2 foundations 75% complete • Phase 1 steelwork installation complete to Level 6 • Drainage installations to Phase 1 due to commenced • Tower crane erection due late June 2018 The key dates for construction are: Phase 1 • Demolition

Complete

• Practical Completion

Q3 2019

Phases 2+ 3 • Demolition

Complete

• Practical Completion

Q1 2020

www.csiprop.com

Dear Investor,

Work is continuing well on the Aura site. Please see a summary of the works that have


Student Accommodation

Progress Update May 2018

www.csiprop.com

AURA


Student Accommodation

Progress Update May 2018

www.csiprop.com

AURA


Student Accommodation

Progress Update April2018 2018 May

www.csiprop.com

AURA


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.