On behalf of the developer, we provide you with the latest images and information from the Aura construction site.
taken place below: • Site fully secured and hoarded • Contractor site set-up is complete • Reduced level excavations / rock break out to Phase 1 + 2 complete • Phase 1 foundations complete, lift base and retaining walls ongoing • Phase 2 foundations 75% complete • Phase 1 steelwork installation complete to Level 6 • Drainage installations to Phase 1 due to commenced • Tower crane erection due late June 2018 The key dates for construction are: Phase 1 • Demolition
Complete
• Practical Completion
Q3 2019
Phases 2+ 3 • Demolition
Complete
• Practical Completion
Q1 2020
www.csiprop.com
Dear Investor,
Work is continuing well on the Aura site. Please see a summary of the works that have
Student Accommodation
Progress Update May 2018
www.csiprop.com
AURA
Student Accommodation
Progress Update May 2018
www.csiprop.com
AURA
Student Accommodation
Progress Update April2018 2018 May
www.csiprop.com
AURA