Residential Apartments
The Residence Residential Apartments
Progress Update May 2019
Progress Update May 2019
The Residence
The Residence
The Residence Residential Apartments
Dear Investor, On behalf of the developer, we provide you with the latest images and information as of May 2019 from The Residence construction site.
Work has continued to progress well on site for The Residence, Manchester.
A summary of the works are below:
• Drainage works ongoing • Crane erected • Lift pit complete • Lift shaft walls ongoing • Level -2 to 0 for Irwell Tower complete, and level 1 commenced • M Tech jump form set up commenced to Irwell Tower • Greengate Tower Level -2 complete
The Residence
Progress Update May 2019
Residential Apartments
Progress Update May 2019
The Residence
The Residence
Residential Apartments
Progress Update May 2019
The Residence
The Residence
Residential Apartments
Progress Update May 2019
The Residence
The Residence
Residential Apartments
Progress Update May 2019
The Residence
The Residence
The Residence Residential Apartments
Level 3, North Block, Wisma GER,142D Jalan Ampang, 50450 Kuala Lumpur +03-2162 2260 www.csiprop.com
info@csiprop.com www.youtube.com/csiprop
www.facebook.com/csiprop
The Residence
Progress Update May 2019