Construction Update – The Residence (May 2019)

Page 1

Residential Apartments

The Residence Residential Apartments

Progress Update May 2019

Progress Update May 2019

The Residence

The Residence


The Residence Residential Apartments

Dear Investor, On behalf of the developer, we provide you with the latest images and information as of May 2019 from The Residence construction site.

Work has continued to progress well on site for The Residence, Manchester.

A summary of the works are below:

• Drainage works ongoing • Crane erected • Lift pit complete • Lift shaft walls ongoing • Level -2 to 0 for Irwell Tower complete, and level 1 commenced • M Tech jump form set up commenced to Irwell Tower • Greengate Tower Level -2 complete

The Residence

Progress Update May 2019


Residential Apartments

Progress Update May 2019

The Residence

The Residence


Residential Apartments

Progress Update May 2019

The Residence

The Residence


Residential Apartments

Progress Update May 2019

The Residence

The Residence


Residential Apartments

Progress Update May 2019

The Residence

The Residence


The Residence Residential Apartments

Level 3, North Block, Wisma GER,142D Jalan Ampang, 50450 Kuala Lumpur +03-2162 2260 www.csiprop.com

info@csiprop.com www.youtube.com/csiprop

www.facebook.com/csiprop

The Residence

Progress Update May 2019


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.