Dear Investor, On behalf of the developer, we provide you with the latest images and information from the The Residence construction site.

Work has been continuing well with Careys over the past couple of months on The Residence site, Manchester.

A summary of the works are below:

• Drainage works continuing • Crane erected • Lift pit complete • Lift shaft walls commenced • Car park slab to basement commenced • Level -2 Irwell Tower complete • Level -1 slab Irwell Tower complete and walls commenced • Irwell props to be removed end of March 2019

The Residence

Progress Update March 2019


Residential Apartments

Progress Update March 2019

The Residence

The Residence


Residential Apartments

Progress Update March 2019

The Residence

The Residence


Residential Apartments

Progress Update March 2019

The Residence

The Residence


Residential Apartments

Progress Update March 2019

The Residence

The Residence


Residential Apartments

Progress Update March 2019

The Residence

The Residence


The Residence Residential Apartments

Level 3, North Block, Wisma GER,142D Jalan Ampang, 50450 Kuala Lumpur +03-2162 2260 www.csiprop.com

info@csiprop.com www.youtube.com/csiprop

www.facebook.com/csiprop

The Residence

Progress Update March 2019


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.