Dear Investor, On behalf of the developer, we provide you with the latest images and information from the The Residence construction site.
Work has been continuing well with Careys over the past couple of months on The Residence site, Manchester.
A summary of the works are below:
• Drainage works continuing • Crane erected • Lift pit complete • Lift shaft walls commenced • Car park slab to basement commenced • Level -2 Irwell Tower complete • Level -1 slab Irwell Tower complete and walls commenced • Irwell props to be removed end of March 2019
The Residence
Progress Update March 2019
Residential Apartments
Progress Update March 2019
The Residence
The Residence
Residential Apartments
Progress Update March 2019
The Residence
The Residence
Residential Apartments
Progress Update March 2019
The Residence
The Residence
Residential Apartments
Progress Update March 2019
The Residence
The Residence
Residential Apartments
Progress Update March 2019
The Residence
The Residence
The Residence Residential Apartments
Level 3, North Block, Wisma GER,142D Jalan Ampang, 50450 Kuala Lumpur +03-2162 2260 www.csiprop.com
info@csiprop.com www.youtube.com/csiprop
www.facebook.com/csiprop
The Residence
Progress Update March 2019