Dear Investor, Work is progressing well on site and please see a summary of the
• Steel frame complete • Both staircases installed • Roofing 60% complete • Dry lining walls commenced • Metal stud partitions commenced on Level 1 - 3 • Drainage commenced • Facing brickwork to Level 1 - 4 • Window 30% installed • Kitchen, tiling and decorations commenced in show apartment
www.csiprop.com
what has taken place below:
alkner Place
On behalf of the developer, we are pleased to provide you with the latest images and information from the Falkner Place construction site.
www.csiprop.com
Residential Apartments
Progress Update March 2017
alkner Place
Falkner Place
www.csiprop.com
Residential Apartments
Progress Update March 2017
alkner Place
Falkner Place
www.csiprop.com
Residential Apartments
Progress Update March 2017
alkner Place
Falkner Place
www.csiprop.com
Residential Apartments
Progress Update March 2017
alkner Place
Falkner Place
www.csiprop.com
Residential Apartments
Progress Update March 2017
alkner Place
Falkner Place