ONE ISLINGTON PLAZA CONSTRUCTION UPDATE MARCH 2018
On behalf of the developer, we present to you updates as of March 2018 from
One Islington Plaza Devon Street, Liverpool, L3 8HA What’s new? Construction is progressing well at One Islington Plaza on Devon Street with no adversities according to the developer. The contractor has increased onsite labour in cladding subcontractors to help achieve watertight status sooner. This will then allow for internal fit out works to commence earlier. Maintenance and engineering works have been carried out on floors 5 through to 10. The internal partitions have been set up ready for installation on floors 4 to 10. Mast hoists are now 100% completely installed. All the internal insulation is on site. Secondary steel framing systems have now been loaded.
The Schedule The secondary steel framing systems will be installed. Beam and block flooring installation will make further progress. Roof will continue to be installed. Maintenance and engineering works will continue to be carried out across other floors. www.csiprop.com
www.csiprop.com