Dear Investor, On behalf of the developer, we provide you with the latest images and information as of September 2018 from The Residence construction site.

Please see the latest information and pictures from The Residence site, Manchester. A summary of the works are below: •

Contiguous piling complete

Concrete capping beam works complete

Sheet piling works complete

Temporary props arrived and installed

Reduced level excavations 95% complete

Drainage works commenced

Lift pit and crane base excavated

Crane due to be erected 3rd November 2018

www.csiprop.com

Residential Apartments

The Residence

Progress Update September 2018


www.csiprop.com

Residential Apartments

Progress Update September 2018

The Residence

The Residence


www.csiprop.com

Residential Apartments

Progress Update September 2018

The Residence

The Residence


www.csiprop.com

Residential Apartments

Progress Update September 2018

The Residence

The Residence


The Residence

Level 3, North Block, Wisma Selangor Dredging,142D Jalan Ampang, 50450 Kuala Lumpur +03-2162 2260 www.csiprop.com

info@csiprop.com www.youtube.com/csiprop

GPS: 3.1597131272736787, 101.70924246311189

www.facebook.com/csiprop

www.csiprop.com

Residential Apartments

The Residence

Progress Update September 2018


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.