The Residence Residential Apartments
Progress Update September 2018
The Residence
Progress Update September 2018
www.csiprop.com
Residential Apartments
The Residence
Dear Investor, On behalf of the developer, we provide you with the latest images and information as of September 2018 from The Residence construction site.
Please see the latest information and pictures from The Residence site, Manchester. A summary of the works are below: •
Contiguous piling complete
•
Concrete capping beam works complete
•
Sheet piling works complete
•
Temporary props arrived and installed
•
Reduced level excavations 95% complete
•
Drainage works commenced
•
Lift pit and crane base excavated
•
Crane due to be erected 3rd November 2018
www.csiprop.com
Residential Apartments
The Residence
Progress Update September 2018
www.csiprop.com
Residential Apartments
Progress Update September 2018
The Residence
The Residence
www.csiprop.com
Residential Apartments
Progress Update September 2018
The Residence
The Residence
www.csiprop.com
Residential Apartments
Progress Update September 2018
The Residence
The Residence
The Residence
Level 3, North Block, Wisma Selangor Dredging,142D Jalan Ampang, 50450 Kuala Lumpur +03-2162 2260 www.csiprop.com
info@csiprop.com www.youtube.com/csiprop
GPS: 3.1597131272736787, 101.70924246311189
www.facebook.com/csiprop
www.csiprop.com
Residential Apartments
The Residence
Progress Update September 2018