Dear Investor, On behalf of the developer, we provide you with the latest updates as of July 2018 from the One Wolstenholme Square construction site.
Work is continuing at a good pace at Wolstenholme square. A summary of the works taken place: Block A • Complete. Block B • Complete. Block C • Apartment meters installed with communal meter installation expected 13th August 2018 • Practical Completion expected 24th August 2018 Block D • Substructures completed • Steel frame complete • Windows 95% complete • Brickwork 90% complete • First fix M+E at Level 6 • Plastering commenced on Level 5 • Kitchens, tiling and floor finishes at Level 4 • Furniture complete on Level 1
Block E • Substructures complete • Steel frame due 13th August 2018 Please see below the anticipated practical completion dates for each block: Block A Block B Block C Block D Block E
December 2017 (complete) April 2018 (complete) August 2018 October 2018 March 2019
www.csiprop.com
UK Buy-to-Let Investment
ne Wolstenholme Square
Progress Update July 2018
www.csiprop.com
UK Buy-to-Let Investment
Progress Update July 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update July 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update July 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update July 2018
ne Wolstenholme Square
One Wolstenholme Square