Dear Investor, On behalf of the developer, we provide you with the latest images and information from the One Wolstenholme Square construction site.
Work is continuing at a good pace at Wolstenholme square. A summary of the works that have taken place: Block A • Complete. Completion documents are currently being prepared, ready for the Notices to Complete to be issued. Block B • Mechanical and Electrical testing and commission complete • Furniture installed • External paving works complete • Snagging complete Levels 1-4 Block C • Steel frame erection complete • Staircases installed • Upper floor decking complete • External lining works complete • Brickwork complete • Internal partitioning complete • M&E first fix complete • M&E second fix commenced on Levels 1-5
Block D • Substructures completed • Steel frame complete • Steel decking complete and concreted to Level 4 • Staircases installed • Ground floor slab reinforcement 50% complete Please see below the anticipated practical completion dates for each block: Block A Block B Block C Block D Block E
December 2017 March 2018 April 2018 July 2018 March 2019
www.csiprop.com
UK Buy-to-Let Investment
ne Wolstenholme Square
Progress Update February 2018
www.csiprop.com
UK Buy-to-Let Investment
Progress Update February 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update February 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update February 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update February 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update February 2018
ne Wolstenholme Square
One Wolstenholme Square
www.csiprop.com
UK Buy-to-Let Investment
Progress Update February 2018
ne Wolstenholme Square
One Wolstenholme Square